Loading…
Loading…
Tender Value
₹40.9 L
EMD Value
₹97,000
Closing Date
7 Jul 2026, 5:00 pm
Similar tender results from the same govt authority in the past 3 years.
GM JAL
Sector-5, Noida
Strengthening of W/s (Providing and Making Connection Gangajal UGR Sector-132 to Distribution Line Sector-126, 127 and Village-Bakhtawarpur, Raypur), Noida.
2026_NOIDA_1163471_1
18/SM-JAL-III/2026-27
Open Tender
Civil Works - Others
90 days
NOIDA
Please refer to tender document
3 documents required · 3 mandatory
₹2,124
NOIDA
₹97,000
24 Jun 2026
24 Jun 2026
8 Jul 2026
24 Jun 2026
7 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means i/c disposal of material within 50 m lead as per direction of E/I of nominal concrete 1:3:6 or richer mix.(i/c equivalent design mix). | 18 | Cum. | 923.42 | ₹16,621.56 |
| 2 | Earth work in excavation by mecanical means (hydraulic excavater)/manual means in over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) i/c disposal of excavated earth, lead up to 50 m and lift up 1.5, disposed earth to be levelled and neatly dressed in all kind of soil.The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of E/I. | 60 | Cum | 136 | ₹8,160 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5m. | 60 | Cum | 93 | ₹5,580 |
| 4M-150 Brick work in 6:6 cement & fine sand 1.25 F.M. mortar in foundation and linth including supply of all materials, labour and T&P etc. required for proper completion of the work. same as item no,-305 but in 1:4 one cement & four fine sand of 1.25 F.M. mortar. | |||||
| 4.01 | Same as item no.-305 but in 1:4 one cement & four Coarse sand of 2.20 F.M. mortar. | 13 | Cum. | 4,950 | ₹64,350 |
| 5 | 12 mm cement plaster of mix 1:4 (1 Cement : 4 C. Sand). | 110 | Sqm. | 176.77 | ₹19,444.7 |
| 6Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | |||||
| 6.01 | As in item no 279 above but in proportions of 8:4:1 | 12 | Cum. | 5,820 | ₹69,840 |
| 7 | Hiring of Diesel Engine (including cost of Diesel, lubricant & Operator). | 80 | Hour | 238 | ₹19,040 |
| 8 | Hiring of Gas cutting Set with oxygen and LPG Running Time @ 6 Hrs. | 10 | Day | 1,785 | ₹17,850 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_2181137.xls
BOQ • 0.34 MB
C18.xls
Additional Documents • 0.03 MB
TD.pdf
Tender Documents • 1.90 MB
Download all tender documents and submit your bid