Tender Value
₹4.8 Cr
EMD Value
₹9.7 L
Closing Date
7 Sept 2026, 6:00 pm
Chief Engineer M and H Jaipur
CHIEF ENGINEER, MEDICAL AND HEALTH, Jaipur (Govt. of Rajasthan, National Health Mission, Rajasthan, Department of Medical, Health and Family Welfare, Swasthya Bhawan, Jaipur
Construction of New CHC Building at MUNDIYA, Distt. Karauli (Including Internal Electrical Work )
2026_MEDIC_592652_1
NIT 10/2026-27 of CEOffice M and HJaipur/
Open Tender
Civil Works - Buildings
Percentage
365 days
karauli
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
RTGS/NEFTRTGS/NEFT/Any other money Transfer System
₹9.7 L
25 Aug 2026
25 Aug 2026
8 Sept 2026
25 Aug 2026
7 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 5,000 | Sqm. | 5 | ₹25,000 |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 1,432.03 | Cum | 178 | ₹2,54,901.34 |
| 3 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 436.71 | Cum | 3,302 | ₹14,42,016.42 |
| 4 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 707.34 | Cum | 2,838 | ₹20,07,430.92 |
| 5 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.
M20 grade Nominal Mix / Design Mix | 378.32 | Cum | 4,934 | ₹18,66,630.88 |
| 6 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Beams, suspended floors, roofs, griders having slopes up to 15º, landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc.
M20 grade Nominal Mix / Design Mix | 519.16 | Cum | 5,185 | ₹26,91,844.6 |
| 7 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.
M20 grade Nominal Mix / Design Mix | 146.83 | Cum | 5,609 | ₹8,23,569.47 |
| 8 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 625.59 | Sqm. | 157 | ₹98,217.63 |
| 9 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Columns, pillars, posts and struts etc. | 2,070.25 | Sqm. | 375 | ₹7,76,343.75 |
| 10 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | 4,486.73 | Sqm | 340 | ₹15,25,488.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tendernotice_2.pdf
PDF • 7.43 MB
Tendernotice_3.pdf
PDF • 2.57 MB
4-Final-Bid-CHC-MUDIYA-KRL.pdf
Tender Documents • 1.02 MB
Annexure-A-BSR-2022.pdf
Tender Documents • 0.26 MB
4-FrontPage.pdf
Tender Documents • 0.02 MB
Special-TandC-for-Electrical-work--Annexure-C-.pdf
Tender Documents • 0.35 MB
T-and-C-for-Electrical-work-DLP--Annexure-B-.pdf
Tender Documents • 0.24 MB
BOQ_1052183.xls
BOQ • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].