| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-AOC AGARAM SITHAMUR | MADURAI | TAMIL NADU | 625001 | ₹27.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹27.8 LRejected-AOC | ₹27.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | JAISHANTHI AND CO L1 | KALAIMANI L2 |
|---|---|---|---|---|---|
| 1.01Construction of 60000 Litres OHT 12m Hight at Old Colony in Melakondai Panchayat | |||||
| 1.02Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | |||||
| 1.03 | First depth 0.0 m - 2.om Below GL | 115.52 | cum | 250 ₹28,880 | 271 ₹31,305.92 |
| 1.04 | Second depth 2.0 m - 4.0 m Below GL | 20.22 | cum | 276.2 ₹5,584.76 | 276.2 ₹5,584.76 |
| 1.05 | Supplying and Filling in Basement with M. Sand in layers not more than 15 cm thick , well ramed and consolidated complying with standard specification | 5.78 | cum | 1,993.81 ₹11,524.22 | 1,993.81 ₹11,524.22 |
| 1.06 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. | 8.66 | cum | 5,793.95 ₹50,175.61 | 5,793.95 ₹50,175.61 |
| 1.07Reinforced cement concrete 1; 11/2;3 using 20mm iss HBG metal including the cost and conveyance of all meterials and cost of all labour charges etc complete | |||||
| 1.08 | Below GL from 1.50 m - 4.50m | 34.66 | cum | 9,824.29 ₹3.4 L | 9,824.29 ₹3.4 L |
| 1.09 | Below 1.50m from GL | 2.33 | cum | 9,685.52 ₹22,567.26 | 9,685.52 ₹22,567.26 |
| 1.10 | 0.0m to 4.50 m above GL | 3.8 | cum | 9,963.41 ₹37,860.96 | 9,963.41 ₹37,860.96 |
Tender Value
₹29.7 L
EMD Value
₹29,672
Closing Date
31 Oct 2025, 3:00 pmClosed
BDO (BP)
PANCHAYAT UNION, VIKRAVANDI
VIK/15-th CFC(DP)TIED/MELAKONDAI
2025_RDTN_618273_1
VIK/15-th CFC(DP)TIED/MELAKONDAI
Open Tender
Civil Works
VIKRAVANDI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹29,672
Yes
17 Dec 2025
29 Oct 2025
31 Oct 2025
29 Oct 2025
31 Oct 2025
29 Oct 2025
Amount
Construction of 60000 Litres OHT 12m Hight at Old Colony in Melakondai Panchayat
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
First depth 0.0 m - 2.om Below GL
Second depth 2.0 m - 4.0 m Below GL
Supplying and Filling in Basement with M. Sand in layers not more than 15 cm thick , well ramed and consolidated complying with standard specification
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Reinforced cement concrete 1; 11/2;3 using 20mm iss HBG metal including the cost and conveyance of all meterials and cost of all labour charges etc complete
Below GL from 1.50 m - 4.50m
Below 1.50m from GL
0.0m to 4.50 m above GL
4.50 m to 7.32 above GL
7.32 m to 10.98 m above GL
10.98 m to 14.64 m above GL
14.64 m to 18.30 m above
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels,
Plain Surface
Below GL
From GL-3.30
From 5.30 m to 6.30 m above GL
From 8.30 m to 9.30 m above GL
From 11.30 m to 12.30 m
Curved Surface
From 3.30 to 4.30
Square Column
Below GL From 0.00 -3.30 m
Above GL to 3.30 m
From 3.31 m to 4.30m
From 4.31 m to 5.30 m
From 5.31 m to 6.30 m
From 6.31 m to 7.30 m
From 7.31 m to 8.30 m
From 8.31 m to 9.30 m
From 9.31 m to 10.30 m
From10.31 m to 11.30 m
From11.31 m to 11.45 m
Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification.
Painting Two Coat with approved cement paint over the Plastered surface over one coat of white cement including cost of all materials and labour charges
90 mm PVC Threaded coupler
75 mm PVC Thread Coupler
63 mm PVC Thread Coupler
65 mm GI Tee
65 GI EII
65 x 50 mm GI Reducer
75 mm x 63 mm PVC Reducer
65 mm GI Union
65 mm GI Flange
65 mm GI Coupling
65 mm Gate Valve
50 mm Gate Valve
Refilling the foundation with excavated earth including consolidation as directed by dept officer
Labour charges for GI pie connection to the OHT for inlet , out let overflow pipe and scour arrangements including cutting and threading earth work excavation and refilling
Providing Hand rails over the Roof salb by using 32 mm GI Pipe with 40mm x 6mm MS Flate and fixing with 12mm dia fastner bolt 75mm long and as directed y dept officer
Providing Fencing and Plateform
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B.
CC 1:4:8 mix using 40mm ISS HBG metal including all other labour charges etc
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels,
Providing and fixing of RCC post
CC 1:2:4 mix using 20mm ISS HBG metal including cost of all other labour charges etc
Supply and fixing of Chain Link - 2 x 2" using 10 Gauge Galvanised Iron wire
Providing Main Pumping Line
Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil
Cost and supply of 90mm PVC pipe
90mm PVC Bend
90mm PVC End Cap
Lowering PVC / DWSC rigid pipes and specials to trench and laying to proper grade and alignment jointing with PVC coulpers with cement etc
Refilling the foundation with excavated earth including consolidation as directed by dept officer
Provision for Name board Charges
Provision for Photographic Charges
Provision for QC Charges 0.5%
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KALAIMANI (BID ID -1500561)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_738958.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_738958.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid