Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.3 LAdmitted-Finance | -48.55% | ₹14.3 L | L1 | Admitted-Finance |
| 2 | L2₹17.0 L+₹2.7 L (18.6%)Admitted-Finance | -38.99% | ₹17.0 L+₹2.7 L (18.6%) | L2 | Admitted-Finance |
| 3 | L3₹17.1 L+₹2.8 L (19.3%)Admitted-Finance | -38.61% | ₹17.1 L+₹2.8 L (19.3%) | L3 | Admitted-Finance |
| 4 | L4₹17.2 L+₹2.9 L (20.1%)Admitted-Finance | -38.22% | ₹17.2 L+₹2.9 L (20.1%) | L4 | Admitted-Finance |
| 5 | L5₹17.8 L+₹3.5 L (24.2%)Admitted-Finance | -36.12% | ₹17.8 L+₹3.5 L (24.2%) | L5 | Admitted-Finance |
Tender Value
₹27.9 L
EMD Value
₹55,739
Closing Date
25 Apr 2026, 3:00 pmClosed
EE,RPD-2,DDA
EE,RPD-2,DDA
Providing and placing drain covers along 24m, 30m, 45m and 60m RoW roads in Sector-34 and 35, Rohini.
2026_DDA_905627_1
08/EE/RPD-2/DDA/2026-27
Open Tender
Civil Works
Works
90 days
Rohini
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹55,739
8 May 2026
17 Apr 2026
27 Apr 2026
17 Apr 2026
25 Apr 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and placing in position 100 mm thick factory made machine batched & machine mixed Precast RCC Rectangular Covers on drains of footpath of various sizes, of M-25 grade cement concrete for RCC work, including cost of centering, shuttering, reinforcement of 8 mm dia TMT bars of Fe 500 grade @ maximum 100mm c/c on both ways , neat cement punning on finished surface, properly encased on all edges with 1.6 mm thick , 100 mm wide MS sheet duly painted over priming coat , reinforcement to be welded at edges with MS sheet and providing 2 Nos. 12 mm dia bar for hooks etc i/c cost of cartage, all leads & lift, handling at site etc. all complete as per direction of Engineer-in-Charge. | 1 | Sqm. | - | - |
| 2 | Providing and filling joints with cement mortar around drain cover i/c labour for complete task as per direction of Engineer-in-charge (nothing extra shall be paid on account of this): Cement mortar 1:6 (1 cement : 6 coarse sand). | - | Cum | - | - |
| 3 | GST Correction factor @ 0.973 = 27,05,765.00 | - | Cum | - | - |
| 4 | Cost index @3% | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.57 MB
BOQ_951906.xls
BOQ • 0.28 MB
NIT08.pdf
Tender Documents • 2.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .