Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.3 LAccepted-Finance AT BAULANGA PO DOSIA DIST KENDRAPARA PIN 754217 | KENDRAPARA | ODISHA | 754217 | ₹10.3 L | 1 | Accepted-Finance OK |
| 2 | 2₹10.8 LAccepted-Finance AL NUAGAON GP BADAMBILA PO NAMAUZA PS AUL DIST KENDRAPARA PIN 754231 | KENDRAPARA | ODISHA | 754231 | ₹10.8 L | 2 | Accepted-Finance OK |
| 3 | Rejected-Technical | - | - | Rejected-Technical Due non submission of Hard Copy of Documents |
Tender Value
₹12.1 L
EMD Value
₹12,095
Closing Date
2 Jul 2026, 5:00 pmClosed
BDO, Pattamundai
Office of the Block Development Officer, Pattamund
Construction of Conference Hall of G.P. Govt Nodal High School,to be fully completed at GP Khadianta. Pattamundai Block
2026_PRPAT_132641_4
PT_01/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Office of the Block Development Officer, Pattamund
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
Block Development Officer, Pattamundai
₹12,095
Yes
1 Aug 2026
22 Jun 2026
4 Jul 2026
22 Jun 2026
2 Jul 2026
22 Jun 2026
22 Jun 2026 - 1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation in all kinds of soil with all leads and lifts including dressing and leveling the bed and depositing the excavated earth at place away from work sites with all leads and lifts including cost of all labours and T&P and dewatering if required for the work etc. complete and as directed by the Engineer-in-charge. | 35.39 | Cum | 282.89 | ₹10,011.48 |
| 2 | Supplying and filling sand in foundation and plinth not exceeding 23 cm thick in layers including watering and ramming with cost conveyance , royalty, taxes of the materials and labour with T&P required for the work etc. complete (measurement will be taken on finished compacted section only) as directed by the Engineer-in-charge | 38.56 | Cum | 1,124.19 | ₹43,348.77 |
| 3 | Cement concrete of proportion (1:3:6) in foundation and floors using 4 cm size clean hard black crusher broken granite stones metal of approved quality and from approved quarry including hoisting ,lowering and laying concrete in layers not exceeding 15 cm thick to the required level , ramming ,watering and curing etc. complete including cost and conveyance of all materials with al taxes and royalities and all labours with T&P required for the work etc. complete including dewatering if required as directed by the EIC. | 8.21 | Cum | 6,886.9 | ₹56,541.45 |
| 4Providing, lifting, hoisting and laying in positioning RCC M-25 grade including cost of Centering and shuttering using 20mm and down grade size black hard granite (Crusher Broken) chips of approved quality from approved quary including the cost of all materials, cost of labour, conveyance, taxes , loading, unloading,T&P, royalty, labour cess all complete as per direction of EIC but excuding cost of the steel reinforcement. | |||||
| 4.01 | Column BASE | 4.13 | Cum | 7,671.45 | ₹31,683.09 |
| 4.02 | Plinth Beam | 2.76 | Cum | 8,545.87 | ₹23,586.6 |
| 4.03 | Column | 2.75 | Cum | 19,493.66 | ₹53,607.57 |
| 4.04 | Roof Beam | 2.54 | Cum | 19,493.66 | ₹49,513.9 |
| 4.05 | Lintel | 1.1 | Cum | 15,385.2 | ₹16,923.72 |
| 4.06 | Chajja | 4.5 | Sqm | 1,305.81 | ₹5,876.14 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.36 MB
BOQ_597486.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].