| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.9 LAdmitted-Fee/PreQual/Technical/Finance | -31.57% | ₹10.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹11.3 L+₹47,271.69 (4.35%)Admitted-Fee/PreQual/Technical/Finance | -28.59% | ₹11.3 L+₹47,271.69 (4.35%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹11.6 L+₹70,748.91 (6.52%)Admitted-Fee/PreQual/Technical/Finance | -27.11% | ₹11.6 L+₹70,748.91 (6.52%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹12.2 L+₹1.3 L (12.4%)Admitted-Fee/PreQual/Technical/Finance VILL HARADAG KALA WARD NO 08 PO BHAGODIH PS RAMNA GARHWA JHARKHAND | GARHWA | JHARKHAND | 822112 | -23.11% | ₹12.2 L+₹1.3 L (12.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹15.9 L
EMD Value
₹32,000
Closing Date
17 Aug 2026, 5:00 pmClosed
EE RDSD LATEHAR
EE RDSD LATEHAR
Construction of Boundary wall, Kitchen Shed and Repair of Dining Shed of Barwadih Govt. Middle School Panchayat Kope Block manika Dist Latehar
2026_RDSPL_116841_2
EE/RDSD/LATEHAR/24/2026-27
Open Tender
Civil Works
Percentage
75 days
LATEHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹32,000
Yes
19 Aug 2026
5 Aug 2026
19 Aug 2026
5 Aug 2026
17 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DISMANTLING pucca brick or lime work… | 1 | cum | 541.67 | ₹541.13 |
| 2 | DISMANTLING R.C.C M-200 with nominal mix of (1:1.5:3) in roof slab…......do….do… | 1 | cum | 1,993.04 | ₹1,991.05 |
| 3 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | - | cu.m | 151.82 | - |
| 4 | Earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation frenches within a lead of 50 M. and lift of 1.5 M all complete as per building specification and direction of E/l (Mode of measurement compacted volume). | 1 | cum | 55.28 | ₹55.22 |
| 5 | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materials, Labour, rotalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume). | 1 | cu.m | 589.51 | ₹588.92 |
| 6 | Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/l. | - | m2 | 330.34 | - |
| 7 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | - | Cum | 4,503.43 | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) Foundation | - | cum | 5,218 | - |
| 9 | Providing designation 75Bbrick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints costs of screening materials, scaffolding, raking out joints to 15mm depth curing taxes and royalty all complete as per building specification and direction of E/I. | 1 | cu.m | 5,110.26 | ₹5,105.15 |
| 10 | Providing designation 75Bbrick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints costs of screening materials, scaffolding, raking out joints to 15mm depth curing taxes and royalty all complete as per building specification and direction of E/I. | 1 | cu.m | 5,244.08 | ₹5,238.84 |
stage.html
html • 0.02 MB
finance_157947.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Sbd_2.pdf
Tender Documents • 0.91 MB
BOQ_157947.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .