| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 CrAccepted-AOC | L1 | Accepted-AOC QUALIFIED BIDDER | |
| 2 | L1₹12.1 CrRejected-Finance PLOT NO 294 PATRAPADA BHUBANESWAR 19 | BHUBANESWAR | ODISHA | L1 | Rejected-Finance DUE TO L1 BIDDER BUT LOWEST TURNOVER | |
| 3 | L2₹12.6 Cr+₹44.3 L (3.65%)Rejected-Finance MADHUBAN PO PARADIP DIST JAGATSINGHPUR 754 142 ODISHA | JAGATSINGHAPUR | ODISHA | 754142 | L2 | Rejected-Finance DUE TO L2 BIDDER | |
| 4 | L3₹12.9 Cr+₹71.4 L (5.88%)Rejected-Finance AT BELGAON SAINTALA BALANGIR 767032 | BALANGIR | BALANGIR | ODISHA | 767032 | L3 | Rejected-Finance DUE TO L3 BIDDER | |
| 5 | Rejected-Technical | - | Rejected-Technical Non-securing qualifying marks in the Point of Presentation as per DTCN Cl.110(m). |
Tender Value
₹14.3 Cr
EMD Value
₹14.3 L
Closing Date
16 Jul 2025, 5:00 pmClosed
CHIEF ENGINEER OPHWC
OPHWC BHUBANESWAR
Building Work
2025_OSPHW_115013_1
07/OPHWC/2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
540 days
Khurda
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
₹14.3 L
Yes
25 Sept 2025
1 Jul 2025
17 Jul 2025
1 Jul 2025
16 Jul 2025
1 Jul 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 240 Men Barrack at SOG Chandaka, Bhubaneswar, Khurda | - | - | - | - |
| 2 | CVL | - | - | - | - |
| 3 | 50000001
Earthwork in stoney earth and gravel mixed stone and boulder not exceeding 0.014 cum in volume within 50 m. initial lead and 1.5 m. initial lift including rough dressing and breaking clods to maximum 5 cm. to 7 cm. and laying in layers not exceeding 0.3 m. depth.
Ground Floor | 1,361.35 | CUM | 418.26 | ₹5,69,398.25 |
| 4 | 50000003
Providing and laying plain cement concrete 1:4:8 (1 cement: 4 sand: 8 stone aggregate 40mm nominal size) as levelling course in foundation and plinth etc. including tempering, curing, shuttering etc. complete at all depth and height.
Ground Floor | 136.02 | CUM | 5,668.75 | ₹7,71,063.38 |
| 5 | 50000017
Supplying of filling sand in foundation and plinth including watering, ramming, consolidating and dressing, labours, tools all complete.
Ground Floor | 822.27 | CUM | 688.49 | ₹5,66,124.67 |
| 6 | 50000020
12mm thick cement plaster in cement mortar 1:6 (1cement:6sand) including necessary scaffolding curing etc. all complete at all depth and height.
Ground Floor | 1,335.55 | SQM | 184.65 | ₹2,46,609.31 |
| 7 | First Floor | 1,655.62 | SQM | 192.37 | ₹3,18,491.62 |
| 8 | Second Floor | 1,676.95 | SQM | 200.47 | ₹3,36,178.17 |
| 9 | Third Floor | 1,662.89 | SQM | 208.97 | ₹3,47,494.12 |
| 10 | Forth Floor | 1,655.62 | SQM | 217.89 | ₹3,60,743.04 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_544791.xls
BOQ • 1.35 MB
174512309.pdf
Tender Documents • 0.87 MB
174512311.html
Tender Documents • 0.07 MB
DTCN1.pdf
Tender Documents • 1.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .