Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance | ₹4.9 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹5.0 LRejected-Finance SANGSAY KALIMPONG 734314 | KALIMPONG | KALIMPONG | WEST BENGAL | 734314 | ₹5.0 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹5.1 LRejected-Finance | ₹5.1 L | L3 | Rejected-Finance Rejected |
Tender Value
₹4.9 L
EMD Value
₹9,786
Closing Date
21 Jan 2026, 12:55 pmClosed
BLOCK DEVELOPMENT OFFICER
OFFICE OF THE BLOCK DEVELOPMENT OFFICER, LAVA DEVELOPMENT BLOCK
REPAIRING OF ROAD CONNECTING ALGARAH PHC ALONG WITH DRAIN (80Mtrs) AT SANTOOK GRAM PANCHAYAT WITHIN LAVA DEVELOPMENT BLOCK
2026_DMK_986606_2
BDO/NIeTNo.21/2025-26
Open Tender
CIVIL WORKS
SANTOOK
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹9,786
28 Jan 2026
9 Jan 2026
23 Jan 2026
9 Jan 2026
21 Jan 2026
9 Jan 2026
Earthwork in excavation of foundation trenches or drains in all sorts of soils(Including mixed soils but excluding laterite or sandstone), including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(A) Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming and preparing the bed to proper level and filling up all joints with sandy clay or earth.
(B) Cost of Boulders
Cement Concrete with graded stone chips(30 mm size excluding shuttering in ground floor and foundation
" V" Type drain 60cm wide and 30cm deep with 150mm to 230mm thick dressed stone laid on edge including cement concrete,plstering and NCP cost & carriage of all materials to worksite.
Hire labour charges for Shuttering with hard wood for precast RC Slab curved or straight, and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc. complete in all respect. (Only the area in contact to concrete to be measured)
Rubble masonary wall with any type of motar (1:40)including scaffolding, racking out the joints and curing etc.
Labour cess @1%
Please Enable Macros to View BoQ information
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.09 MB
BOQ_2408720.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid