Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 CrAccepted-AOC | ₹6.4 Cr Quoted ₹6.7 Cr | L1 | Accepted-AOC Quoted less percentage |
| 2 | L2₹6.8 Cr+₹6.4 L (0.95%)Rejected-AOC KOODUTHURAIPATTI KONGARAPATTI PO HARUR TK DHARMAPURI DISTRICT | ₹6.8 Cr+₹6.4 L (0.95%) | L2 | Rejected-AOC Quoted above percentage |
| 3 | Rejected-Technical | - | - | Rejected-Technical Pre qualification not satisfied |
Tender Value
₹6.4 Cr
EMD Value
₹3.3 L
Closing Date
17 Jul 2020, 3:00 pmClosed
SE H C and M Salem
O/o the Superintending Engineer (Highways), Construction and Maintenance, Salem Circle
Construction of Retaining Wall to Government Roads including Upkeeping for a period of 60 months in Pennagaram (H) Sub Division (Package-83)
2020_HWAY_167055_1
TN.4/2020-21/HDO, Dt.01.06.2020-15
Open Tender
Civil Works - Roads
Percentage
210 days
Dharmapuri
Refer tender document
3 documents required · 3 mandatory
₹0
₹3.3 L
20 Nov 2020
6 Jun 2020
20 Jul 2020
6 Jun 2020
17 Jul 2020
17 Jun 2020
10 Jun 2020 - 16 Jun 2020
eProcurement System Government of Tamil Nadu Created By: Sumathy D Created Date/Time: 05-Aug-2020 11:56 AM Tender Title: Dharmapuri Package 83 Tender ID: 2020_HWAY_167055_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Salem Circle
Name of work : Construction of Retaining Wall to Government Roads including Upkeeping for a period of 60 months in Pennagaram (H) C&M Sub Division (Package-83) The Following works are involved in this package 1) Construction of Retaining wall at km 31/200 - 31/500 & 43/8 of Omalur - Mecheri - Pennagaram road (via) Perumpalai (SH 222) (01-CRIDP-20-21-S-0601) 2) Construction of Retaining wall at km 31/500 - 31/660 of Omalur - Mecheri - Pennagaram road (via) Perumpalai (SH 222) (01-CRIDP-20-21-S-0602) 3) Construction of Retaining wall at km 42/10, 43/10, 44/2, 52/6 of Omalur - Mecheri - Pennagaram road (via) Perumpalai (SH 222)(01-CRIDP-20-21-S-0604) 4) Construction of Retaining wall at km 5/2 of Kombadiyur - Samathal road (01-CRIDP-20-21-O-3637) 5) Construction of Retaining wall at km 5/4 of Kombadiyur - Samathal road including upkeeping for a period of 60 months. (01-CRIDP-20-21-O-3643)
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 VEDIAPPAN 56986499.320 6.000 67654372.000 Six Crore Seventy Six Lakh Fifty Four Thousand Three Hundred and Seventy Two
2.00 T.Jayaprakash 56986499.320 5.000 67016123.000 Six Crore Seventy Lakh Sixteen Thousand One Hundred and Twenty Three
Lowest Amount Quoted BY: T.Jayaprakash(67016123.000)
BOQ Summary Details Tender Title: Dharmapuri Package 83 Tender ID: 2020_HWAY_167055_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 T.Jayaprakash 67016123.000 L1
2 VEDIAPPAN 67654372.000 L2
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .