Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAdmitted-Finance SCHOOL BAGAN BOLPUR BIRBHUM | BOLPUR | BIRBHUM | L1 | Admitted-Finance | |
| 2 | L2₹9.1 L+₹12,540.16 (1.39%)Admitted-Finance COLLEGEPARA SURI BIRBHUM | BIRBHUM | WEST BENGAL | 731236 | L2 | Admitted-Finance | |
| 3 | L3₹9.2 L+₹15,277.26 (1.69%)Admitted-Finance SURI BIRBHUM | SURI | BIRBHUM | WEST BENGAL | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Birbhum Electric Works L3 | HINDOL ROY L2 | S.K. ELECTRICALS L1 |
|---|---|---|---|---|---|---|
| 1.00 | PART – A
Labour charges for operation of High lift, Low lift pumping machinery, Sub Station and transformer/Valve/disinfection arrangement including internal illumination of P/H and guarding of installation with accessories. [ 03 (Three) Man]
w.e.f. 01.09.2026 to 31.08.2027) [THE RATES INCLUDING OF 1% CESS AND ESI & PF (AS PER EXISTING RULES) ] | 365 | DAYS | 2,130 ₹7,77,450 | 2,124 ₹7,75,260 | 2,108 ₹7,69,420 Lowest |
| 2.01 | PART – B
(a) Supervision charges for electrical installation within the pump house by licensed electrician as per IE rules, 1956 read with latest amendments overhead expenditure including incidental charges as per specification & direction of EIC.(LT) | 12 | MONTH | 8,810 ₹1,05,720 | 8,800 ₹1,05,600 | 8,764 ₹1,05,168 Lowest |
| 2.02 | (b) Calibration, testing and checking healthy condition of all meters, HT Switch gear, feeders, transformer, illumination system etc. as per direction of EIC. w.e.f. 01.09.2026 to 31.08.2027 | 4 | LOT | 6,100 ₹24,400 | 6,000 ₹24,000 | 4,464 ₹17,856 Lowest |
| 3.00 | ADD: @ 1% CESS OF SL. NO: 1 TO 2.02 | 1 | ITEM | 9,075.7 ₹9,075.7 | 9,048.6 ₹9,048.6 | 8,924.44 ₹8,924.44 Lowest |
Tender Value
Refer Docs
EMD Value
₹18,000
Closing Date
1 Aug 2026, 12:00 pmClosed
EXECUTIVE ENGINEER, BOLPUR MECHANICAL DIVISION PHE
SRINIKETAN ROAD NEAR HOTEL MARK MEADOWS PO SRINIKETAN DIST BIRBHUM PIN 731236
Operation and Guarding of Pumping machinery and others at Mollarpur WSS at Kamraghat of Mayureswar - I Block
2026_PHED_1033201_43
PHED/22/EE/BOLMD/26-27
Open Tender
MECHANICAL
Item Rate
365 days
MOLLARPUR
Please refer Tender documents.
6 documents required · 6 mandatory
₹18,000
14 Sept 2026
21 Jul 2026
3 Aug 2026
21 Jul 2026
1 Aug 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART – A
Labour charges for operation of High lift, Low lift pumping machinery, Sub Station and transformer/Valve/disinfection arrangement including internal illumination of P/H and guarding of installation with accessories. [ 03 (Three) Man]
w.e.f. 01.09.2026 to 31.08.2027) [THE RATES INCLUDING OF 1% CESS AND ESI & PF (AS PER EXISTING RULES) ] | 365 | DAYS | 101 | ₹36,865 |
| 2.01 | PART – B
(a) Supervision charges for electrical installation within the pump house by licensed electrician as per IE rules, 1956 read with latest amendments overhead expenditure including incidental charges as per specification & direction of EIC.(LT) | 12 | MONTH | 102 | ₹1,224 |
| 2.02 | (b) Calibration, testing and checking healthy condition of all meters, HT Switch gear, feeders, transformer, illumination system etc. as per direction of EIC. w.e.f. 01.09.2026 to 31.08.2027 | 4 | LOT | 103 | ₹412 |
| 3 | ADD: @ 1% CESS OF SL. NO: 1 TO 2.02 | 1 | ITEM | 104 | ₹104 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.09 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
Tendernotice_2.pdf
PDF • 0.21 MB
Tendernotice_3.pdf
PDF • 0.20 MB
Tendernotice_4.pdf
PDF • 0.68 MB
BOQ_2538101.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .