| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹7.4 L (5.59%)Admitted-Finance | ₹1.4 Cr+₹7.4 L (5.59%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹14.0 L (10.6%)Admitted-Finance TYPE 2 RITURAJ SINGH AKBARPUR SARAI GHAGH KANNAUJ UTTAR PRADESH SARAIMEERA KANNAUJ UTTAR PRADESH 209725 | KANNAUJ | UTTAR PRADESH | 209725 | ₹1.5 Cr+₹14.0 L (10.6%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 Cr+₹18.6 L (14.1%)Admitted-Finance NOT AVAILABLE | NEW DELHI | DELHI | 110001 | ₹1.5 Cr+₹18.6 L (14.1%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical rejected |
| Sl No | Description | Qty | Unit | Networth Projects Pvt Ltd L4 | ARYA ELECTRIC COMPANY L2 | envision Enterprises L1 | OM SOLAR SOLUTIONS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline (N-Type Topcon Bifacial as latest technology) solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:-
(a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part2. Solar Photovoltaic Module conversion efficiency shall not be less than 21% (As per latest technology). PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, degradation should be less than 1% at the end of 1st year and 0.4% p.a. from 2nd to 25 years. (b)Power Conditioning Unit (PCU) of 1000 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz plus /- 2.5 Hz, output voltage suitable to generate AC (c) Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degrees
(c) The PCU shall adjust the voltage and frequency level to suit grid frequency
(d) Data Monitoring System complete with accessories. (e) Fixing of Array junction box and Main junction box with IP 65-68 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required.
(f) Lightning and surge voltage protection.
(g) Connections and Interconnections by supplying and fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc. as required. The above scope of work is indicative only. The work will be carried out complete in all respects as per detailed scope of work, specifications, terms and conditions mentioned in standard bid documents up to entire satisfaction of Engineer in-Charge.Three year DLP including fortnightly cleaning of panels. | 450 | KWp | 33,076 ₹1,48,84,200 | 30,475 ₹1,37,13,750 | 28,800 ₹1,29,60,000 Lowest | 30,998 ₹1,39,49,100 |
| 2.00 | AMC charges for first year. | 1 | Each | 40,000 ₹40,000 Lowest | 50,000 ₹50,000 | 45,000 ₹45,000 | 1,00,000 ₹1,00,000 |
| 3.00 | AMC charges for Second year.. | 1 | Each | 40,000 ₹40,000 Lowest | 50,000 ₹50,000 | 45,000 ₹45,000 | 1,15,000 ₹1,15,000 |
| 4.00 | AMC charges for Third year. | 1 | Each | 40,000 ₹40,000 Lowest | 50,000 ₹50,000 | 45,000 ₹45,000 | 1,35,000 ₹1,35,000 |
| 5.00 | AMC charges for forth year . | 1 | Each | 40,000 ₹40,000 Lowest | 50,000 ₹50,000 | 65,000 ₹65,000 | 1,55,000 ₹1,55,000 |
| 6.00 | AMC charges for 5th year. | 1 | Each | 40,000 ₹40,000 Lowest | 50,000 ₹50,000 | 65,000 ₹65,000 | 1,75,000 ₹1,75,000 |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
27 Jan 2026, 3:00 pmClosed
JAGDISH SINGH DAHIYA
Engg. Cell, MDU, Rohtak
SITC of 450 KWP capacity Grid connected roof top Solar Power Plant on the various building in MDU Campus, Rohtak on CAPEX
2025_HRY_489559_1
2025296093E2 ECDF 4F2C 8B2A A8CEDA9954B4817MDU
Open Tender
Electrical Works
Works
180 days
Rohtak
SITC of 450 KWP capacity Grid connected roof top Solar Power Plant on the various building in MDU Campus, Rohtak on CAPEX
2 documents required · 2 mandatory
₹15,000
₹3.2 L
Yes
O/o Engg.Cell, MDU, Rohtak
8 Apr 2026
11 Dec 2025
28 Jan 2026
11 Dec 2025
27 Jan 2026
11 Dec 2025
11 Dec 2025 - 13 Dec 2025
22 Dec 2025
Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono Crystalline (N-Type Topcon Bifacial as latest technology) solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- (a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part2. Solar Photovoltaic Module conversion efficiency shall not be less than 21% (As per latest technology). PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, degradation should be less than 1% at the end of 1st year and 0.4% p.a. from 2nd to 25 years. (b)Power Conditioning Unit (PCU) of 1000 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz plus /- 2.5 Hz, output voltage suitable to generate AC (c) Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degrees (c) The PCU shall adjust the voltage and frequency level to suit grid frequency (d) Data Monitoring System complete with accessories. (e) Fixing of Array junction box and Main junction box with IP 65-68 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. (f) Lightning and surge voltage protection. (g) Connections and Interconnections by supplying and fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc. as required. The above scope of work is indicative only. The work will be carried out complete in all respects as per detailed scope of work, specifications, terms and conditions mentioned in standard bid documents up to entire satisfaction of Engineer in-Charge.Three year DLP including fortnightly cleaning of panels.
AMC charges for first year.
AMC charges for Second year..
AMC charges for Third year.
AMC charges for forth year .
AMC charges for 5th year.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_567764.xls
BOQ • 1.25 MB
AD0140250.pdf
Additional Documents • 1.15 MB
OT0140250.pdf
Other Document • 5.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .