| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.8 LAccepted-AOC BIMALA BHAWAN CHAPAGURI ROAD NEAR SBI NORTH BONGAIGAON P O BONGAIGAON DIST BONGAIGAON ASSAM | BONGAIGAON | BONGAIGAON | ASSAM | L1 | Accepted-AOC Awarded | |
| 2 | L1₹86.8 LRejected-Finance HOUSE NO 20 BAGHARBARI VIDYANAGAR 2 PANJABARI GUWAHATI ASSAM 781037 | KAMRUP METRO | ASSAM | 781037 | L1 | Rejected-Finance Not admitted | |
| 3 | L1₹86.8 LRejected-Finance VILL GARBHANGA BIKASH NAGAR P O BASISTHA P S BASISTHA DIST KAMRUP M ASSAM | KAMRUP | ASSAM | 781030 | L1 | Rejected-Finance Not admitted | |
| 4 | L1₹86.8 LRejected-Finance BISHAMPUR WARD NO 12 CITY TOWN NALBARI P O P S NALBARI DIST NALBARI PIN 781335 | NALBARI | ASSAM | 781335 | L1 | Rejected-Finance Not admitted | |
| 5 | L2₹96.5 L+₹9.6 L (11.1%)Rejected-Finance GORUBANDHA MISSAMARI 784 506 | SONITPUR | ASSAM | 784506 | L2 | Rejected-Finance Not admitted |
| Sl No | Description | Qty | Unit | NABA BASUMATARY L1 | LIZA KALITA L1 | M/S SUNRISE ENTERPRISE L2 | Dhaneswar Kalita L1 | SRI ANJAN JYOTI DEKA L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Brick Lined Canal (Link Canal) (Right & Left Bank Link Canal) | ||||||||
| 1.01 | Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).
All types of soils except soil mixed with gravel and boulders | 710.06 | Cum | 335.95 ₹2,38,544.66 Lowest | 335.95 ₹2,38,544.66 Lowest | 373.28 ₹2,65,051.2 | 335.95 ₹2,38,544.66 Lowest | 350 ₹2,48,521 |
| 1.02 | Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing. | 1,105 | Sqm | 758.86 ₹8,38,540.3 | 758.86 ₹8,38,540.3 | 843.18 ₹9,31,713.9 | 758.86 ₹8,38,540.3 | 750 ₹8,28,750 Lowest |
| 1.03 | C.C work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone agg. of size 13 mm to 38 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc.where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately). | 82.88 | Cum | 9,106.73 ₹7,54,765.78 | 9,106.73 ₹7,54,765.78 | 10,118.59 ₹8,38,628.74 | 9,106.73 ₹7,54,765.78 | 9,000 ₹7,45,920 Lowest |
| 1.04 | Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed. | 57.58 | Qtl. | 12,295.76 ₹7,07,989.86 | 12,295.76 ₹7,07,989.86 | 13,661.96 ₹7,86,655.66 | 12,295.75 ₹7,07,989.29 Lowest | 12,300 ₹7,08,234 |
| 1.05 | Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
With 38 mm thick wood plank | 386.4 | Cum | 356.77 ₹1,37,855.93 | 356.77 ₹1,37,855.93 | 396.41 ₹1,53,172.82 | 356.77 ₹1,37,855.93 | 350 ₹1,35,240 Lowest |
| 1.06 | RCC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing including dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). | 51.54 | Cum | 9,585.87 ₹4,94,055.74 | 9,585.87 ₹4,94,055.74 | 10,650.97 ₹5,48,950.99 | 9,585.87 ₹4,94,055.74 | 9,500 ₹4,89,630 Lowest |
| 1.07 | River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc. complete as directed as specified. | 225 | Cum | 1,915.71 ₹4,31,034.75 | 1,915.71 ₹4,31,034.75 | 2,128.57 ₹4,78,928.25 | 1,915.71 ₹4,31,034.75 | 1,900 ₹4,27,500 Lowest |
| 1.08 | 1st class brick work in cement mortar in abutment and wing wall, parapet wall etc.including racking out joints and curing etc. complete. (a) In proportion 1 :4 | 309.16 | Cum | 12,160.82 ₹37,59,639.11 Lowest | 12,160.82 ₹37,59,639.11 Lowest | 13,512.02 ₹41,77,376.1 | 12,160.82 ₹37,59,639.11 Lowest | 12,320 ₹38,08,851.2 |
| 1.09 | 12 mm cement plastering including clearing surface and curing complete as directed. In prop. 1:4 | 1,650 | Sqm | 266.66 ₹4,39,989 | 266.66 ₹4,39,989 | 296.29 ₹4,88,878.5 | 266.66 ₹4,39,989 | 250 ₹4,12,500 Lowest |
Tender Value
₹96.5 L
EMD Value
₹1.9 L
Closing Date
19 Apr 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer Minor Irrigation Assam
O-o the Chief Engineer Irrigation Assam Chandmari Guwahati-03
Reconstruction of Parbatia FIS under SOPD for the year 2018-19 (Construction of canal _ canal structures) Package_2
2025_ID_43711_2
12 _SOPD_2024_25 Date_21_03_2025
Open Tender
Civil Works
Item Rate
360 days
Mushalpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
₹1.9 L
Yes
O-o the CEMI Assam Chandmari Guwahati-03
25 Sept 2025
22 Mar 2025
19 Apr 2025
22 Mar 2025
19 Apr 2025
23 Mar 2025
1 Apr 2025
Amount
Construction of Brick Lined Canal (Link Canal) (Right & Left Bank Link Canal)
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). All types of soils except soil mixed with gravel and boulders
Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
C.C work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone agg. of size 13 mm to 38 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc.where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) With 38 mm thick wood plank
RCC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing including dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc. complete as directed as specified.
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc.including racking out joints and curing etc. complete. (a) In proportion 1 :4
12 mm cement plastering including clearing surface and curing complete as directed. In prop. 1:4
Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 km including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Construction of 150mm dia HP outlet HP Outlet (for 8 nos)
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing in foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compaction, complete as directed. (Including bailing out stagnant rain water where necessary). a. All type of soil except soil mixed with gravel and boulders For normal lead of 30m and lift of 1.50m
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying, fitting, fixing PVC pipes (IS 12818, 6 kg/cm2 ), joining pipes with relevant cement, levelling, testing leakages etc, complete as directed. (Cost of E/W foundation trenches will be paid separately). 110mm dia
Supplying, fitting, fixing PVC bend pipe size joining with pipes with solvent cement, testing leakages etc, complete as directed. 110mm dia
12 mm thick cement plastering including clearing surface and curing complete as directed. In prop. 1:4
Earthwork in back filling of structure, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of Cattle Crossing ( 1.50m Clear Span) (for 2 nos)
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing in foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compaction, complete as directed. (Including bailing out stagnant rain water where necessary). A. All types of soils except soil mixed with gravel and boulders For normal lead of 30 M and lift 1.50M
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). Wall foundation
CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing including dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed. i) 10mm dia bars ii) 12mm dia bars
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) With 38 mm thick wood plank
12 mm thick cement plastering including clearing surface and curing complete as directed. In prop. 1:4
Earthwork in back filling of structure, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of Road Crossing Box Culvert ( Size 1.00m x 1.50m )
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing in foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compaction, complete as directed. (Including bailing out stagnant rain water where necessary). a. All type of soil except soil mixed with gravel and boulders For normal lead of 30m and lift of 1.50m
Collection of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete.(Quarry distance = 55.00 Km. Quarry=Rowta)
Labour charge for spreading of hard river gravel or broken stone of size 13 mm to 38 mm to the required thickness including dressing, ramming the seat before laying the materials as directed with a lead upto 30 M and lift upto 1.5 M complete as directed.
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.
Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) With 38 mm thick wood plank
CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing including dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
12 mm thick cement plastering including clearing surface and curing complete as directed in prop. 1:4
Making and maintaining sub-way 3 M wide including providing barrier and sign board and lamp etc.
Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
SRI ANJAN JYOTI DEKA (BID ID -265935)
LIZA KALITA (BID ID -266019)
Dhaneswar Kalita (BID ID -265849)
M/S SUNRISE ENTERPRISE (BID ID -265855)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .