Loading…
Loading…
Tender Value
₹44.8 L
EMD Value
₹4.6 L
Closing Date
5 Oct 2026, 11:00 am4d left
EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION AGRA
OFFICE OF EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION AGRA, NEAR BAROLI AHEER BLOCK, SHAMSHABAAD ROAD AGRA, PIN CODE 283125.
GRAM SEMARI, BLOCK CHAUMUNHAN, DISTRICT MATHURA MAIN KOSI AARTICALE DRAIN PAR CHEKDAM KA NIRMAN KARY.
2026_UPMID_1185396_1
TENDER_9_SEMARI_CD_MATHURA
Open Tender
Civil Works
Percentage
90 days
CCHAUMUNHAN
AS PER TENDER NOTICE
2 documents required · 2 mandatory
₹2,354
EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION AGRA
₹4.6 L
Yes
OFFICE OF EE MID AGRA
5 Oct 2026
14 Sept 2026
5 Oct 2026
14 Sept 2026
5 Oct 2026
14 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Earthwork excavation in Ordinary soil including lead 45.0 m and lift 1.5m 40% of E/W (IDS5.1B+5.6A)(100+8)+ | 1,694.99 | m³ | - | - |
| 1.2 | As above but lift 1.5m to bed level 60% of E/W
(IDS 5.1B+5.6 Cx5+5.6A+6gb) | 2,542.49 | m³ | 137 | ₹3,48,321.13 |
| 2 | Earth Work in excavation in Foundation in ordinary saturated soil. With 5.5 lifts & 45.0 m lead
(IDS 5.1B+5.6Cx21+5.6Ax1+5.6G(B) | 489.26 | m³ | 162 | ₹79,260.12 |
| 3 | Removal of slush in nalabed before excavation of saturated soil.(IDS 5.1B+5.6Cx10+5.6Ax1+5.6G (A) | 112.58 | m³ | 166 | ₹18,688.28 |
| 4 | C.C.in 1:3:6 Cement, Sand and 25 to 50 mm Stone ballast including the cost of materials labours and etc. required for proper completion of work.( From Ananlysis) | 318.65 | m³ | 5,615 | ₹17,89,219.75 |
| 5 | R.C.R Stone massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work. ( From Ananlysis) | 134.41 | m³ | 5,159 | ₹6,93,421.19 |
| 6 | R.R Stone massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work.( From Ananlysis) | 107.39 | m³ | 5,272 | ₹5,66,160.08 |
| 7 | C.C.in 1:2:4 Cement, Sand and 10 to 20 mm grit including the cost of materials labours and etc.to required for proper completion of work.( From Ananlysis) | 76.19 | m³ | 6,039 | ₹4,60,111.41 |
| 8 | Raised struck pointing in 1:3 Cement sand mortar including the cost of material labour etc.to required for proper completion of work. | 132.39 | m² | 160 | ₹21,182.4 |
| 9 | 1:4 Cement, Sand Mortar plaster on stone masonery of checkdam. | 89.89 | m² | 235 | ₹21,124.15 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.54 MB
BOQ_2230736.xls
BOQ • 0.32 MB
document.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .