| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.2 CrAdmitted-Finance RAM PLAZA NAVASHAKTI CHOWK BHABHA NAGAR NASHIK 422 011 | NASHIK | NASHIK | MAHARASHTRA | 422011 | ₹60.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹63.1 CrAdmitted-Finance HARSH ANAND YEVALEKAR MALA COLLEGE ROAD NASHIK 422005 | NASHIK | NASHIK | MAHARASHTRA | 422005 | ₹63.1 Cr | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Harsh Constructions Pvt Ltd L2 | Pawar Patkar Constructions Pvt.Ltd. L1 |
|---|---|---|---|---|---|
| 1.00 | I.No.1 Trimming of grass, shurbs and weeds from the shoulders/berms and disposing off the same to suitable locations etc. complete (SSR 2022-23, I.No.8.17) i) Lower & Ground Floor | 6,115.79 | Per One Square Meter | 9 ₹55,042.11 | 10 ₹61,157.90 |
| 2.00 | I.No.2 Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means (SSR 2022-23, I.No. 21.02) i) Lower & Ground Floor | 4,820.27 | Per One Cubic Metre | 240 ₹11.6 L | 239 ₹11.5 L |
| 3.00 | I.No.3 Excavation for foundation in earth, soils of all types, sand,gravel and soft murum,including removing the excavated material upto a distance of 50 metres beyond thebuilding area and stacking and spreading as directed, dewatering, preparing the bedfor the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Manual Means (SSR 2022-23, I.No. 21.03) i) Lower & Ground Floor | 286 | Per One Cubic Metre | 364 ₹1.0 L | 362 ₹1.0 L |
| 4.00 | I.No.4 Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper (SSR 2022-23, I.No. 21.22) i) Lower & Ground Floor | 2,008 | Per One Square Metre | 124 ₹2.5 L | 124 ₹2.5 L |
| 5.00 | I.No. 5 Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per One Square Metre of vertical surface area covering 10 years guarantee on bond paper. (SSR 2022-23, I.No. 21.23) i) Lower & Ground Floor | 20 | Per One Square Metre | 130 ₹2,600 | 129 ₹2,580 |
| 6.00 | I.No.6 Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per One Square Metre of surface area covering ten years guarantee on bond paper (SSR 2022-23, I.No. 21.24) i) Lower & Ground Floor | 1,867 | Per One Square Metre | 125 ₹2.3 L | 125 ₹2.3 L |
| 7.00 | I.No.7 Providing preconstructional antitermite treatment as per I.S. 6313 (Part-I) to the soil along the external face of building by punching holes of 1.2 of 1.5 C.M. diametre about 30 -60 cm deep at 15 cm c/c as close to the wall as possible and to inject 0.5 percent of aldrin or clorophyrifos at the rate of 7.5 litres per hole and sealing the same with proper filling and covering 10 years guarantee on bond paper.(SSR 2022-23, I.No. 21.25) i) Lower & Ground Floor | 288 | Per One Square Metre | 204 ₹58,752 | 203 ₹58,464 |
| 8.00 | I.No.8 Filling in plinth and floors with approved excavated material in 15cm. to 20cm. layers including watering and compacting etc. complete.(SSR 2022-23, I.No. 21.36) i) Lower & Ground Floor | 10 | Per One Cubic Metre | 139 ₹1,390 | 138 ₹1,380 |
| 9.00 | I.No.9 Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete (SSR 2022-23, I.No. 21.37) i) Lower & Ground Floor | 6,202.3 | Per One Cubic Metre | 695 ₹43.1 L | 689 ₹42.7 L |
| 10.00 | I.No.10 Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete (SSR 2022-23, I.No. 21.38) i) Lower & Ground Floor | 522 | Per One Cubic Metre | 2,103 ₹11.0 L | 2,085 ₹10.9 L |
Tender Value
₹55.4 Cr
EMD Value
₹27.7 L
Closing Date
18 Sept 2024, 5:00 pmClosed
Executive Engineer, P.W. Division Panvel
Executive Engineer, P.W. Division Panvel
Construction of Upgraded Sub District Hospital Building at Uran Tal-Uran Dist-Raigad
2024_PWR_1068368_1
PD/AB/TC e-Ten Notice No. 24 for 2024-2025
Open Tender
Civil Works - Buildings
Panvel
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
₹27.7 L
C.E. Konkan P.W. Region Konkan
1 Feb 2026
10 Aug 2024
20 Sept 2024
10 Aug 2024
18 Sept 2024
10 Aug 2024
16 Aug 2024
stage.html
html • 0.03 MB
techsummary_1863885.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_1863885.xls
BOQ • 0.91 MB
Uploaddtp.pdf
Tender Documents • 16.58 MB
Download all tender documents and submit your bid