Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.2 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹25.9 L+₹67,351.14 (2.67%)Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | L3₹26.4 L+₹1.2 L (4.93%)Accepted-Finance | L3 | Accepted-Finance ok | |
| 4 | L4₹26.7 L+₹1.5 L (6.14%)Accepted-Finance | L4 | Accepted-Finance ok | |
| 5 | L5₹27.5 L+₹2.3 L (9.14%)Accepted-Finance | L5 | Accepted-Finance ok |
Tender Value
₹36.7 L
Closing Date
19 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DFO Urban Forestry Division Jammu
DFO Urban Forestry Division Jammu Forest complex Dogra Hall Jammu
Construction of Path at Wellness Park Mahamaya , Urban Forestry Division Jammu
2022_FD_198626_1
61 of 2022-23
Open Tender
Civil Works
Item Rate
30 days
Mahamaya, Urban Forestry Division Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
DFO Urban Forestry Division Jammu
Exempted
20 Dec 2022
6 Dec 2022
20 Dec 2022
6 Dec 2022
19 Dec 2022
7 Dec 2022
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.2.7.1 All kinds of soil :
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) including all leads lift carriage complete job
40mm thick fine dressed stone flooring over 20mm (average) thick base of cement mortar 1:5 (1 cement: 5 coarse sand), including pointing with cement mortar 1:2 ( 1 cement : 2 stone dust) with an admixture of pigment to match the shade of stone and curing complete. Red sand stone including all leads lift carriage complete job
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size including all leads lift carriage complete job
Centering and shuttering including strutting, propping etc. and removal of form for : foundation
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) including all leads lift carriage complete job
Kewal Kumar
Sanjay Kumar Gupta
K J AND COMPANY
harbans Lal
CHANDER MOHAN GUPTA
BIDHEE SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .