Tender Value
Refer Docs
EMD Value
₹59,000
Closing Date
22 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
Providing Infrastructure facilities in Schools and construction of other public utilities - 9 nos. in AGAMT-II-2021-22 Village panchayats of Usilampatti Block in Madurai District in Package no.USI-03
2022_RDTN_239737_1
568/2022/D7 /usi03/24.06.22
Open Tender
Civil Works
Item Rate
180 days
usilampatti
REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹0
₹59,000
1 Aug 2022
6 Jul 2022
22 Jul 2022
6 Jul 2022
22 Jul 2022
7 Jul 2022
Amount
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Supplying andSand filling with M.Sand inculding all cost and conveyance etc complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
C.C 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete
Steel door D of size 0.9x2.10m
Steel Window size 0.90x 2.10m
Steel Ventilator 0.90x 0.45m
Ceilling plastering with CM 1:3 mix using 10mm thick including cost, conveyance and all labour charges etc., completed
Plastering with CM 1:5 mix, 12mm thick including cost, conveyance and all labour charges etc., completed.
Gronolithick floor finish floor finish using metal chips including cost and coneyance and all labour charges
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Finishing with one coarce of machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Distembering with two coats over primer coat using best shell lime including cost and conveyance of all materials and all labour charges etc complete
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat inculding through scrapping, clean removal of dirt etc
Painting two coats with Enamel paint for new iron work including cost of all materials to site and all labour charges etc complete.
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Supplying andSand filling with M.Sand inculding all cost and conveyance etc complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
C.C 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete
Steel door D of size 0.9x2.10m
Steel Window size 0.90x 2.10m
Steel Ventilator 0.90x 0.45m
Ceilling plastering with CM 1:3 mix using 10mm thick including cost, conveyance and all labour charges etc., completed
Plastering with CM 1:5 mix, 12mm thick including cost, conveyance and all labour charges etc., completed.
Gronolithick floor finish floor finish using metal chips including cost and coneyance and all labour charges
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Finishing with one coarce of machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Distembering with two coats over primer coat using best shell lime including cost and conveyance of all materials and all labour charges etc complete
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat inculding through scrapping, clean removal of dirt etc
Painting two coats with Enamel paint for new iron work including cost of all materials to site and all labour charges etc complete.
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Supplying andSand filling with M.Sand inculding all cost and conveyance etc complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
C.C 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete
Steel door D of size 0.9x2.10m
Steel Window size 0.90x 2.10m
Steel Ventilator 0.90x 0.45m
Ceilling plastering with CM 1:3 mix using 10mm thick including cost, conveyance and all labour charges etc., completed
Plastering with CM 1:5 mix, 12mm thick including cost, conveyance and all labour charges etc., completed.
Gronolithick floor finish floor finish using metal chips including cost and coneyance and all labour charges
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Finishing with one coarce of machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Distembering with two coats over primer coat using best shell lime including cost and conveyance of all materials and all labour charges etc complete
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat inculding through scrapping, clean removal of dirt etc
Painting two coats with Enamel paint for new iron work including cost of all materials to site and all labour charges etc complete.
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
filling the Basement with Excavated earth other than Sand etc. Complete
Supplying and Sand filling with M.Sand inculding all cost and conveyance etc complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Supply Mild Steel door D of size 0.75x 1.80m
Towards the Labour Charges for fixing in Position of Steel Doors 0.75x 1.80m
Plastering with CM 1:5 mix, 12mm thick including cost, conveyance and all labour charges etc., completed.
Ceilling plastering with CM 1:3 mix using 10mm thick including cost, conveyance and all labour charges etc., completed
Paving the Floor with designed ceramic tiles size 305x305x6mm in CM 1:3 20mm thick
Dadooing walls Plain Galzed tiles of size 150x150x6mm
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat inculding through scrapping, clean removal of dirt etc
Painting two coats with Enamel paint for new iron work including cost of all materials to site and all labour charges etc complete.
Gronolithick floor finish floor finish using metal chips including cost and coneyance and all labour charges
Supplying & fixing with E.Water Closet with Foot rest and P-Trap EWC with 10 lit Tank including cost and all labour charges etc complete.
Supplying & fixing with I.Water Closet with Foot rest and P-Trap EWC with 10 lit Tank including cost and all labour charges etc complete.
Provision For Electrification Charges
Light Point (SD 22)
Fixing of Tube Point (SD 88)
CFL Bulb (SD 80)
CFL Bulk Head (SD 83)
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Filling in Well Rammed ,Watered,and Consolidated Complying with Standard Spe.etc,Complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete
Column
Grade Beam
Above Basement
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Granolethick floor finish using metal chips including cost and coneyance and all labour charges
Paving the Floor with Vetrified tiles in CM 1:3 20mm thick
Paving the Floor with designed ceramic tiles size 305x305x6mm in CM 1:3 20mm thick
Dadooing walls Plain Galzed tiles of size 150x150x6mm
Plastering with CM 1:5 mix, 12mm thick including cost, conveyance and all labour charges etc., completed.
Ceilling plastering with CM 1:3 mix using 10mm thick including cost, conveyance and all labour charges etc., completed
Distembering with two coats over primer coat using best shell lime including cost and conveyance of all materials and all labour charges etc complete
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat inculding through scrapping, clean removal of dirt etc
Painting two coats with Enamel paint for new iron work including cost of all materials to site and all labour charges etc complete.
door D of size 1.00x2.10m
door D of size 0.90x2.10m
Window 1.00x 1.30m
Steel Ventilator 0.90x 0.60m
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Supplying andSand filling with M.Sand inculding all cost and conveyance etc complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
C.C 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete
Steel door D of size 0.9x2.10m
Steel Window size 0.90x 2.10m
Steel Ventilator 0.90x 0.45m
Ceilling plastering with CM 1:3 mix using 10mm thick including cost, conveyance and all labour charges etc., completed
Plastering with CM 1:5 mix, 12mm thick including cost, conveyance and all labour charges etc., completed.
Gronolithick floor finish floor finish using metal chips including cost and coneyance and all labour charges
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Finishing with one coarce of machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Distembering with two coats over primer coat using best shell lime including cost and conveyance of all materials and all labour charges etc complete
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat inculding through scrapping, clean removal of dirt etc
Painting two coats with Enamel paint for new iron work including cost of all materials to site and all labour charges etc complete.
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Filling in Well Rammed ,Watered,and Consolidated Complying with Standard Spe.etc,Complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete
Column
Grade Beam
Above Basement
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Granolethick floor finish using metal chips including cost and coneyance and all labour charges
Paving the Floor with Vetrified tiles in CM 1:3 20mm thick
Paving the Floor with designed ceramic tiles size 305x305x6mm in CM 1:3 20mm thick
Dadooing walls Plain Galzed tiles of size 150x150x6mm
Plastering with CM 1:5 mix, 12mm thick including cost, conveyance and all labour charges etc., completed.
Ceilling plastering with CM 1:3 mix using 10mm thick including cost, conveyance and all labour charges etc., completed
Distembering with two coats over primer coat using best shell lime including cost and conveyance of all materials and all labour charges etc complete
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat inculding through scrapping, clean removal of dirt etc
Painting two coats with Enamel paint for new iron work including cost of all materials to site and all labour charges etc complete.
door D of size 1.00x2.10m
door D of size 0.90x2.10m
Window 1.00x 1.30m
Steel Ventilator 0.90x 0.60m
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Filling in Well Rammed ,Watered,and Consolidated Complying with Standard Spe.etc,Complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete
Column
Grade Beam
Above Basement
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Granolethick floor finish using metal chips including cost and coneyance and all labour charges
Paving the Floor with Vetrified tiles in CM 1:3 20mm thick
Paving the Floor with designed ceramic tiles size 305x305x6mm in CM 1:3 20mm thick
Dadooing walls Plain Galzed tiles of size 150x150x6mm
Plastering with CM 1:5 mix, 12mm thick including cost, conveyance and all labour charges etc., completed.
Ceilling plastering with CM 1:3 mix using 10mm thick including cost, conveyance and all labour charges etc., completed
Distembering with two coats over primer coat using best shell lime including cost and conveyance of all materials and all labour charges etc complete
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat inculding through scrapping, clean removal of dirt etc
Painting two coats with Enamel paint for new iron work including cost of all materials to site and all labour charges etc complete.
door D of size 1.00x2.10m
door D of size 0.90x2.10m
Window 1.00x 1.30m
Steel Ventilator 0.90x 0.60m
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Supplying andSand filling with M.Sand inculding all cost and conveyance etc complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
C.C 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete
Steel door D of size 0.9x2.10m
Steel Window size 0.90x 2.10m
Steel Ventilator 0.90x 0.45m
Ceilling plastering with CM 1:3 mix using 10mm thick including cost, conveyance and all labour charges etc., completed
Plastering with CM 1:5 mix, 12mm thick including cost, conveyance and all labour charges etc., completed.
Gronolithick floor finish floor finish using metal chips including cost and coneyance and all labour charges
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Finishing with one coarce of machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Distembering with two coats over primer coat using best shell lime including cost and conveyance of all materials and all labour charges etc complete
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat inculding through scrapping, clean removal of dirt etc
Painting two coats with Enamel paint for new iron work including cost of all materials to site and all labour charges etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K GUBENDRAAN S AND CO
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .