| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.5 LAccepted-AOC | ₹73.5 L | L1 | Accepted-AOC Accept |
| 2 | L2₹75.2 LRejected-Finance | ₹75.2 L | L2 | Rejected-Finance Above Contactor Value |
| Sl No | Description | Qty | Unit | Nallathambi S L2 | DHARMARAJ G L1 |
|---|---|---|---|---|---|
| 1.00 | 1.Providing of BT road from PonnaKaram salai to Eraiyur Salai at Eraiyur Pt.
Clearingthe Scrub jungle including all labour charges for burrying and burning etc., | 3,024 | M2 | 8 ₹24,192 | 7 ₹21,168 |
| 2.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 778.19 | M3 | 145 ₹1.1 L | 141 ₹1.1 L |
| 3.00 | Spreading the collected US gravel to 150mm thick watering and hand roller rolling including cost and supply of well Gravel from approved quarry and stacking to departmental gauge for premeasurements etc complete as per standard specifications and as directed by the departmental officers KM 0/0-1/000 | 59.65 | M3 | 415 ₹24,754.75 | 409 ₹24,396.85 |
| 4.00 | KM 1/0-2/000 | 60 | M3 | 430 ₹25,800 | 423 ₹25,380 |
| 5.00 | KM 2/0-3/000 | 59.83 | M3 | 445 ₹26,624.35 | 436 ₹26,085.88 |
| 6.00 | KM 3/0-4/000 | 59.28 | M3 | 465 ₹27,565.20 | 450 ₹26,676 |
| 7.00 | KM 4/0-4/100 | 6 | M3 | 465 ₹2,790 | 464 ₹2,784 |
| 8.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 93.75 | M3 | 2,550 ₹2.4 L | 2,509 ₹2.4 L |
| 9.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 937.5 | M2 | 90 ₹84,375 | 85 ₹79,687.50 |
| 10.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc. | 937.5 | M2 | 21 ₹19,687.50 | 20 ₹18,750 |
Tender Value
₹73.6 L
EMD Value
₹74,500
Closing Date
17 Dec 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER
PANCHAYAT UNION OFFICE VEPPANTHATTAI
Providing of BT Road from Ponnakaram salai to Eraiyur salai at Eraiyur pt (2140M)
2025_RDTN_630659_1
B4/3721/2025 05.12.2025
Open Tender
Civil Works - Roads
180 days
PANCHAYAT UNION OFFICE
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹74,500
Yes
12 Jan 2026
10 Dec 2025
17 Dec 2025
10 Dec 2025
17 Dec 2025
10 Dec 2025
Amount
1.Providing of BT road from PonnaKaram salai to Eraiyur Salai at Eraiyur Pt. Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Spreading the collected US gravel to 150mm thick watering and hand roller rolling including cost and supply of well Gravel from approved quarry and stacking to departmental gauge for premeasurements etc complete as per standard specifications and as directed by the departmental officers KM 0/0-1/000
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal KM 0/0-1/000
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for HM ,Km Stone charges etc complete
Provision for HM ,Km Stone charges etc complete
Provision for Sign Board
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Nallathambi S (BID ID -1534824)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Tendernotice_1.pdf
PDF • 0.09 MB
PARTI.pdf
Tender Documents • 0.82 MB
BOQ_754146.xls
BOQ • 0.24 MB
PARTII.pdf
Tender Documents • 0.66 MB
Download all tender documents and submit your bid