Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.3 CrAccepted-AOC 401 402 AMIT CRYSTAL ABOVE BANK OF BARODA SENAPATI BAPAT ROAD PUNE 411016 SHIVAJI NAGAR PUNE MAHARASHTRA 411016 | PUNE | MAHARASHTRA | 411016 | L1 | Accepted-AOC Accept | |
| 2 | L2₹78.8 Cr+₹1.5 Cr (1.98%)Rejected-AOC 1 SANSKRUTI APPARTMENT MURKUTE LANE NEW PANDIT COLONY NASHIK TAL DIST NASHIL | NASHIK | NASHIK | MAHARASHTRA | 422001 | L2 | Rejected-AOC Accept |
Tender Value
₹69.7 Cr
EMD Value
₹34.8 L
Closing Date
27 Sept 2021, 6:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E.P.W.DIVN. NANDED
OFFICE OF THE E.E.P.W.DIVN. NANDED
CONSTRUCTION OF ADMINISTRATIVE COURT BUILDING IN GUT NO. 118, 119 (PART) NECESSARYFOR ADMINISTRATIVE OFFICES AT ASARJAN DIST. NANDED.
2021_PWR_719971_1
PWD/NED/39/2021-22
Open Tender
Civil Works
Item Rate
730 days
NANDED
AS PER TENDER DOCUMENT
4 documents required · 4 mandatory
₹3,000
₹34.8 L
OFFICE OF THE C.E. P.W.REGION, AURANGABAD
7 Mar 2022
13 Sept 2021
28 Sept 2021
13 Sept 2021
27 Sept 2021
13 Sept 2021
20 Sept 2021
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts and spreading for embankment or stacking as directed.
Basement Floor | 2,340 | Cubic Metre | 89.25 | ₹2,08,845 |
| 0.0 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material with all leads & lifts beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means
Basement Floor | 6,184.81 | Cubic Metre | 191.1 | ₹11,81,917.19 |
| 0.0 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material with all leads & lifts beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means
Basement Floor | 6,184.81 | Cubic Metre | 238.35 | ₹14,74,149.46 |
| 0.0 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 3.00 m to 4.5.0m) By Mechanical Means
Basement Floor | 6,184.81 | Cubic Metre | 286.02 | ₹17,68,979.36 |
| 0.0 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 4.5m to 6.00 m) By Mechanical Means
Basement Floor | 3,917.05 | Cubic Metre | 309.86 | ₹12,13,737.11 |
| 0.0 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed.
Basement Floor | 24,811.48 | Cubic Metre | 109.2 | ₹27,09,413.62 |
| 0.0 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc.complete.
Basement Floor | 2,042.84 | Cubic Metre | 709.7 | ₹14,49,803.55 |
| 0.0 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. & filling sand in voids
Basement Floor | 1,065.59 | Cubic Metre | 1,496.84 | ₹15,95,017.74 |
| 0.0 | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete.
Basement Floor | 2,599.62 | Cubic Metre | 1,430.48 | ₹37,18,704.42 |
| 0.0 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper.
Basement Floor | 6,232.68 | Square Metre | 90.3 | ₹5,62,811 |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1242704.xls
BOQ Document • 0.79 MB
83478149.pdf
Tender Document • 0.16 MB
1.pdf
Tender Document • 5.75 MB
83478151.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .