Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.2 LAccepted-AOC 24 25 MANGAL ARCADE TELCO ROAD OPP HOTEL DOUBLE TREE MOHAN NAGAR CHINCHWAD PUNE 411019 | PUNE | MAHARASHTRA | 411019 | L1 | Accepted-AOC being lowest | |
| 2 | L2₹30.9 L+₹70,108.80 (2.32%)Rejected-Finance | L2 | Rejected-Finance Not Being Lowest | |
| 3 | L3₹34.2 L+₹3.9 L (13.0%)Rejected-Finance FLAT NO 203 SEC 14 PLOT NO 142 SHIVSRUTI PARK APARTMENT E WING 1ST FLOOR MOSHI PRADHIKARAN TAL HAVELI DIST PUNE 412 105 | PUNE | MAHARASHTRA | 412105 | L3 | Rejected-Finance Not Being Lowest | |
| 4 | L4₹34.6 L+₹4.4 L (14.6%)Rejected-Finance | L4 | Rejected-Finance Not Being Lowest | |
| 5 | L5₹35.3 L+₹5.0 L (16.7%)Rejected-Finance FLAT NO 601 TOWER NO 30 SECTOR NO 21 AMANORA PARK TOWN HADAPSAR PUNE 411028 | PUNE | MAHARASHTRA | 411028 | L5 | Rejected-Finance Not Being Lowest |
Tender Value
₹35.8 L
EMD Value
₹71,600
Closing Date
29 Oct 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Garrison Engineer (CME) Kirkee
Garrison Engineer (CME) Kirkee, Phugewadi, Dapodi, Pune - 411 012
MANNING AND OPRERATION OF E/M INSTALLATION AT CME KIRKEE
2020_MES_369849_2
9000/E8
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
Garrison Engineer (CME) Kirkee
Class D d(v)
9 documents required · 9 mandatory
₹500
Yes
Garrison Engineer (CME) Kirkee
₹71,600
Yes
16 Apr 2021
14 Oct 2020
31 Oct 2020
14 Oct 2020
29 Oct 2020
16 Oct 2020
15 Oct 2020 - 15 Oct 2020
60 days
Amount
Manning and operation of external electric supply installation all days including sundays and holiday round the clock in three shifts in a day eight hours each shift from 0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs and 2200 hrs to 0600 hrs with one skilled operator/ tradesman in each shift with all necessary tools required and in proper uniform as approved by Engr-in-Charge. The operator will carry out following duties at the under mentioned location Location: SUB STN NO 01 (a) Operation of Gang Operate Device (GOD) as under :- (i) To restore main 22KV /11KV supply from MSEB. (ii) To Operate main incoming VCB and change over 11 KV /22KV on failure /Shut Down either of the Feeder. (iii) To Operate outgoing HT VCB , LT, OCB Installed inside sub station Bldg. (b) Maintain/operate the following at Recieving Sub Station NO.1 (i) GOD 22 KV, (ii) Change over supply Devices) (iii) HT Incoming VCB - 1 No (iv) Change Over VCB- 1 No (v) Distribution feeder control VCB - 6 Nos (vi) Security light system within Premises. (vii) 22 KV Installation consist of Transformer 500KVA - 02 Nos , GOD , DO Fuse Unit, LA, and related Over head Conductors , Control Panels & Electric Poles (c) To Make cooperative communication with other sub station.
Rates required to be quoted for executing the work as described in Srl No 1 here-in-before:-
Workers wage per person as per existing rules
Employees Provident Fund as mentioned in the tender documents
Employees State Insurance Contribution as mentioned in the tender documents
Contribution of Bonus as mentioned in the tender documents
Over head & profit on srl No 2.1 to 2.4
LWC as mentioned in the tender documents
Notes for Srl No 1:- The quoted rate against EPF,ESIC and Bonus shall be considered for payment on actual basis. Contribution towards EPF, ESIC and Bonus is payable only after submission of valid and authentic document in support of having paid the requisite amount of bonus to the workmen, i.e. proof of payment
Manning and operation of external electric supply installation, on all days including sundays and holidays round the clock in three shifts in a day,each shift of eight hours from 0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs and 2200 hrs to 0600 hrs with one skilled operator/tradesman in each shift with all necessary tools required and in proper uniform as approved by Engr-in-Charge. The operator will carry out following duties at the under mentioned location Location: SUB STN NO 16 (a) Operation of Gang Operate Device 22KV (GOD):- 02 Nos (b) To Operate main incoming VCB 22 KV on failure /Shut Down either of the Feeder -02 No (c)To Operate outgoing HT VCB ,RMU 22KV, LT Panel, Installed inside sub station Bldg. (d) To make cooperative communication between duty staff of Main receiving Sub Station(VSNL) (e) Care and maint of Transformer 50 KVA :- 03 No, (g) Security light system within Premises. (h) 11 KV Installation consist of Transformer 50KVA - 01 Nos , GOD , DO Fuse Unit, LA, and related UG Cable , Control Panels & Electric Poles etc.
Rates required to be quoted for executing the work as described in Srl No 4 here-in-before:-
Workers wage per person as per existing rules
Employees Provident Fund as mentioned in the tender documents
Employees State Insurance Contribution as mentioned in the tender documents
Contribution of Bonus as mentioned in the tender documents
Over head & profit on srl No 5.1 to 5.4
LWC as mentioned in the tender documents
Notes for Srl No 4 :- The quoted rate against EPF,ESIC and Bonus shall be considered for payment on actual basis. Contribution towards EPF, ESIC and Bonus is payable only after submission of valid and authentic document in support of having paid the requisite amount of bonus to the workmen, i.e. proof of payment
Manning and operation of external electric supply installation, all days including sundays and holidays round the clock in three shifts in a day,each shift of eight hours from 0600 hrs to 1400 hrs, 1400 hrs to 2200 hrs and 2200 hrs to 0600 hrs with one skilled operator/tradesman in each shift with all necessary tools required and in proper uniform as approved by Engr-in-Charge. The operator will carry out following duties at the under mentioned location Location: SUB STN No 9 (a) Operation of Gang Operate Device (GOD) like :- 03 Nos (b) To Operate main incoming VCB 22 KV -01 Nos and outgoing VCB -04 No, LT feeder pillar pannel- 03 Nos Installed inside sub station Bldg. (c) Security light system within Premises. (d) Transformer 01 nos 11/.440 KV, Transformer 2MVA-01 No 22/11KV (e) CT & PT (f) To Operate RMU and 2MVA transformer after completion of express feeder Project (g) To Make cooperative communication with other sub station.
Rates required to be quoted for executing the work as described in Srl No 7 here-in-before:-
Workers wage per person as per existing rules
Employees Provident Fund as mentioned in the tender documents
Employees State Insurance Contribution as mentioned in the tender documents
Contribution of Bonus as mentioned in the tender documents
Over head & profit on srl No 8.1 to 8.4
LWC as mentioned in the tender documents
Notes for Srl No 7 :- The quoted rate against EPF,ESIC and Bonus shall be considered for payment on actual basis. Contribution towards EPF, ESIC and Bonus is payable only after submission of valid and authentic document in support of having paid the requisite amount of bonus to the workmen, i.e. proof of payment
Note 1 for Sl No 1,4 & 7 :- (i) The rate quoted shall be inclusive of GST at applicable rates against item of M&O.
(ii) If the contractor will quoted below the rate of minimum wages for labour as per Govt of India , then those type of bid shall be rejected by the department.
Notes 2 :- For Item No. 1,4 & 7 Quoted rates deemed to be inclusive for the following:-
Contractor will submit the nominal roll and qualification certificates and experience certificates of tradesmen being employed in the work within 15 days of acceptance to the Engineer-in-charge and copy of the same shall be forwarded to the GE.
The Operator shall be ITI qualified in concerned trade or shall have minimum 03 years experience in operation of electric supply installation.
The unit rate quoted shall be deemed to include cost of consumable items such as cotton waste and Hessain clothes, T&P required for maintenance, stationery for log book sheet, attendance register, First aid box, operator uniform (.as approved by Engr-In-Charge for all skilled person deployed ,with firm name and name tab of Indl clean dress is must, failing which one time shift quoted rate will be deducted) shooes and rain coat etc.
Contractor will ensure attendance of all operators shift wise. The operator/attendent shall not leave the installation without reliever and installation shall not be left unmanned in any case.If any staff found absent,a recovery of Two times of the min wages prescribed as per the govt charges by the contractor against each shift/item shall be made.
(e) Suitable reliever to be provided during off shift operator as per the labour law.
(f) Contractor shall submitted the proof of payment of wages through Aadhar linked bank account of operators in every month of 1st week.
(g) Contractor shall be provided notice board of each installation within 15 days from the date of commencement of contract.
(h) Contractor shall submit the monthly duty roster of each installation before 03 days of respective month.
(k) The installations, and surroundings of installations is to be maintained neat and dry including clearing of vegetation and grass around the Plant Room
(l) The contractor on acceptance will acquire valid entry passes from HQ Adm Wing CME for entering in restricted area through Engineer-in-charge.
(m) No claim whatsoever shall be admissible regarding distance between plants/installation and location of plant/installation to be kept operational under above items. Rate quoted are deemed to be inclusive of this aspect.
(n) Adequate amount of insurance of all the operators shall be made against workers compensation act against any accident before commencement of work without any extra cost to Dept.
(o) Contractor shall be responsible for safe custody of all the machinery/installations installed in the electric installations.
(p) All the workers should possess sound health to work on electrical installation and their age must lie between 18 to 50 years.
(q) The Contractor shall sign inventory of the equipment/Bldg of MES installation before comencement of work any damage/theft to the govt property,the contractor will be responsible and recover to this effect will be made as decided by GE.and copy of the inventory to be forwarded before commencement of work to GE office duly signed by contractor and MES rep.
(r) If there any change of staff by the contractor,the same shall be informed by the contractor in advance in writing to the accepting officer before three days.The accepting officer reserves the right to change staff or not,however accepting officer can remove concern employee on the basis of Non performance.
MAYUR ELECTRIC SERVICES
SKS Electricals
Pritam Electro Mechanical Services
UNIQUE ENGINEERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .