Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.8 LQualified | ₹43.8 L | L1 | Qualified MSE, Category: General |
| 2 | L2₹64.3 LQualified | ₹64.3 L | L2 | Qualified |
| 3 | L3₹77.2 LQualified | ₹77.2 L | L3 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
19 Jun 2026, 4:00 pmClosed
Supply and Erection of Internals of all Three Fields of
9421898
GEM/2026/B/7622922
Two Packet Bid
Thermax Make ESP 1,Thermax Make ESP 2,Thermax Make ESP 3,Thermax Make ESP 4,Thermax Make ESP 5,Ther
Baghpat, Uttar Pradesh
Total value wise evaluation
BOQ
6 documents required · 6 mandatory
1 yrs
₹5 L
₹10 L
10%
name, RAMALA COOP SAHKARI CHINI MILL, Account No., 488300C100000014
Exempted
Yes
19 Jun 2026
4 Jun 2026
19 Jun 2026
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Thermax Make ESP 1 | Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Shaft Insulator 1016 mm | 6 | pieces | Sumit Panwar 250623,Sahkari Chini Mills Ltd Ramala, Baghpat | 20 |
| 2 | Thermax Make ESP 2 | Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Rapper Coil | 6 | pieces | Sumit Panwar 250623,Sahkari Chini Mills Ltd Ramala, Baghpat | 20 |
| 3 | Thermax Make ESP 3 | Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Hypalon Boot | 12 | pieces | Sumit Panwar 250623,Sahkari Chini Mills Ltd Ramala, Baghpat | 20 |
| 4 | Thermax Make ESP 4 | Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Worm Gear clamp (Big end) | 12 | pieces | Sumit Panwar 250623,Sahkari Chini Mills Ltd Ramala, Baghpat | 20 |
| 5 | Thermax Make ESP 5 | Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Worn Gear clamp (Small end) | 12 | pieces | Sumit Panwar 250623,Sahkari Chini Mills Ltd Ramala, Baghpat | 20 |
| 6 | Thermax Make ESP 6 | Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Row Cardbbvb | 1 | pieces | Sumit Panwar 250623,Sahkari Chini Mills Ltd Ramala, Baghpat | 20 |
| 7 | Thermax Make ESP 7 | Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Column Card | 1 | pieces | Sumit Panwar 250623,Sahkari Chini Mills Ltd Ramala, Baghpat | 20 |
| 8 | Thermax Make ESP 8 | Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. DC Thyristor unit | 1 | pieces | Sumit Panwar 250623,Sahkari Chini Mills Ltd Ramala, Baghpat | 20 |
| 9 | Thermax Make ESP 9 | Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Level Sensor | 6 | pieces | Sumit Panwar 250623,Sahkari Chini Mills Ltd Ramala, Baghpat | 20 |
| 10 | Thermax Make ESP 10 | Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. TIC | 2 | pieces | Sumit Panwar 250623,Sahkari Chini Mills Ltd Ramala, Baghpat | 20 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9421898.pdf
GEM_BID • 0.13 MB
new_2026-06-04-15-44-15_d8992bef7b8a62596318faa333f90322.pdf
BOQ • 1.43 MB
espboq_2026-06-04-15-44-15_276b3e4d58bef14063028188d8633d27.csv
BOQ • 0.00 MB
new_d93fe017-e81e-4792-abca1780568676243_buyer3.upcsffl.up.pdf
GEM_OTHER • 1.43 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].