Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.8 LAccepted-AOC NO 03 PERUMAL KOVIL STREET MINJUR 601203 | THIRUVALLUR | TAMIL NADU | 601203 | ₹23.8 L Quoted ₹26.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹20.9 LRejected-Finance PLOT NO 41 T H ROAD KESAVAPURAM MINJUR 601 203 | THIRUVALLUR | TAMIL NADU | 601203 | ₹20.9 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | M.ANBAZHAGAN L2 | SHARTHI TECKMA CONTRACTS L1 |
|---|---|---|---|---|---|
| 1.00 | Charges of Inspection of bearing and Renewal Replacement / Servicing of DE/NDE Bearings / Oil Guards/Thrust pads of Boiler Feed Booster Pump. Including consumables and T&P’s. (2 Nos. / Pump) | 4 | Nos | 26,000 ₹1.0 L | 27,500 ₹1.1 L |
| 2.00 | Charges for Renewal / Replacement/Servicing of DE/NDE Mechanical seals & renewal of CW Jacket ‘O’ rings of BFBP. Including consumables and T&P’s. (2 Nos. / Pump) | 4 | Nos | 47,000 ₹1.9 L | 49,000 ₹2.0 L |
| 3.00 | Charges for Checking and Correcting the alignment between Booster Pump Coupling to Motor Coupling. Including consumables and T&P’s. (OH-2 Nos. & EM-3 Nos.) 3 Nos for motor to voith coupling. | 5 | Nos | 32,000 ₹1.6 L | 34,200 ₹1.7 L |
| 4.00 | Charges for Overhauling of CEP Suction strainer: Loosening of all the strainer cover flange bolts & nuts, lifting and removing the strainer cover, removing the CEP strainer from the strainer assembly, inspection and reconditioning the damaged strainer if necessary, cleaning the strainer, cleaning inside the strainer well and removing the old gasket from the lid closing area, assembling the strainer basket in the well and assembling the CEP strainer assembly with renewed gasket and painting of the strainer outer area (Paint under contractor scope). Including consumables and T&P’s. | 6 | Nos | 17,500 ₹1.1 L | 19,200 ₹1.2 L |
| 5.00 | Charges for Overhauling of Boiler feed Booster Pump
Decoupling the pump, dismantling CW lines and oil lines dismantling of bearings mechanical seals at both DE & NDE and their inspection, reassembling of seal cartridge with renewed mechanical sealing elements. Including consumables and T&P’s. | 2 | Nos | 35,500 ₹71,000 | 37,300 ₹74,600 |
| 6.00 | Opening of top cover of split casing dismantling of rotor, inspection and measurement of wear rings, renewal of parts if required. Reassembling and positioning of the rotor and closing of top casing. Including consumables and T&P’s. | 2 | Nos | 35,500 ₹71,000 | 37,300 ₹74,600 |
| 7.00 | Mounting of mechanical seals and bearings housing at DE & NDE, checking of various clearances of the bearings and restoring the oil lines and CW lines. Including consumables and T&P’s. | 2 | Nos | 26,500 ₹53,000 | 27,800 ₹55,600 |
| 8.00 | Disconnection of the pump from suction and discharges pipe flanges, checking and correcting the pump alignment with motor and rechecking of pump alignment flanges with renewed gaskets. And other such works required for efficient operation of the pump and commissioning. Including consumables and T&P’s. | 2 | Nos | 35,500 ₹71,000 | 38,000 ₹76,000 |
| 9.00 | Reconditioning of pump top, bottom casing & casing rings etc. Grinding the eroded portions of the casing ring assembly seating areas and other eroded areas in the top & bottom casings and casing wear rings and welding with suitable special electrodes after preheating the casing and rings as per requirement. Including consumables and T&P’s. | 2 | Nos | 11,000 ₹22,000 | 13,300 ₹26,600 |
| 10.00 | Metal filling with E 670 welding rod on the stepped portion of the pump shaft, machining and smooth finishing of the welded portion of BFB pump shaft NDE side. (Welding electrodes will be provided under contractor scope) Metal filing with E 670 welding rod on the stepped portion of BFB pump shaft. Including consumables and T&P’s.
. | 2 | Nos | 4,000 ₹8,000 | 4,900 ₹9,800 |
Tender Value
Refer Docs
EMD Value
₹25,400
Closing Date
5 Jul 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle AOH 25 26 TM Dn FWS Overhauling of Boiler Feed Booster Pump CEP and Condenser Vacuum Pumps and its Auxiliaries in Feed Water System in Unit I II III during overhaul work for the year 2025 26
2025_EB_576872_1
CE SE MI NCTPS I 81 25 26
Open Tender
Power/Energy Projects/Products
120 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25,400
Yes
29 Apr 2026
2 Jul 2025
7 Jul 2025
2 Jul 2025
5 Jul 2025
2 Jul 2025
Amount
Charges of Inspection of bearing and Renewal Replacement / Servicing of DE/NDE Bearings / Oil Guards/Thrust pads of Boiler Feed Booster Pump. Including consumables and T&P’s. (2 Nos. / Pump)
Charges for Renewal / Replacement/Servicing of DE/NDE Mechanical seals & renewal of CW Jacket ‘O’ rings of BFBP. Including consumables and T&P’s. (2 Nos. / Pump)
Charges for Checking and Correcting the alignment between Booster Pump Coupling to Motor Coupling. Including consumables and T&P’s. (OH-2 Nos. & EM-3 Nos.) 3 Nos for motor to voith coupling.
Charges for Overhauling of CEP Suction strainer: Loosening of all the strainer cover flange bolts & nuts, lifting and removing the strainer cover, removing the CEP strainer from the strainer assembly, inspection and reconditioning the damaged strainer if necessary, cleaning the strainer, cleaning inside the strainer well and removing the old gasket from the lid closing area, assembling the strainer basket in the well and assembling the CEP strainer assembly with renewed gasket and painting of the strainer outer area (Paint under contractor scope). Including consumables and T&P’s.
Charges for Overhauling of Boiler feed Booster Pump Decoupling the pump, dismantling CW lines and oil lines dismantling of bearings mechanical seals at both DE & NDE and their inspection, reassembling of seal cartridge with renewed mechanical sealing elements. Including consumables and T&P’s.
Opening of top cover of split casing dismantling of rotor, inspection and measurement of wear rings, renewal of parts if required. Reassembling and positioning of the rotor and closing of top casing. Including consumables and T&P’s.
Mounting of mechanical seals and bearings housing at DE & NDE, checking of various clearances of the bearings and restoring the oil lines and CW lines. Including consumables and T&P’s.
Disconnection of the pump from suction and discharges pipe flanges, checking and correcting the pump alignment with motor and rechecking of pump alignment flanges with renewed gaskets. And other such works required for efficient operation of the pump and commissioning. Including consumables and T&P’s.
Reconditioning of pump top, bottom casing & casing rings etc. Grinding the eroded portions of the casing ring assembly seating areas and other eroded areas in the top & bottom casings and casing wear rings and welding with suitable special electrodes after preheating the casing and rings as per requirement. Including consumables and T&P’s.
Metal filling with E 670 welding rod on the stepped portion of the pump shaft, machining and smooth finishing of the welded portion of BFB pump shaft NDE side. (Welding electrodes will be provided under contractor scope) Metal filing with E 670 welding rod on the stepped portion of BFB pump shaft. Including consumables and T&P’s. .
Overhauling of condensate extraction pump: Charges for removing of pump half coupling, checking pump float, removal of bearing chamber and bearings, disconnecting air vents and cooling water lines, suction and discharge flanges and lifting the pump. Including consumables and T&P’s.
Charges for dismantling and assembling of Pumps. Including consumables and T&P’s.
Renewal of cutless rubber bearings, including consumables and T&P’s.
Renewal of casing and impeller wearing rings. Including consumables and T&P’s.
Checking and correction of alignment of CEP, including consumables and T&P’s.
Decoupling, alignment and coupling of condenser vacuum pump. Including consumables and T&P’s.
Complete overhauling of condenser vacuum pump (Make : NASH) (Model: AT 2004E) 1. Preparation for dismantling pump 2. Disassembling II stage and Bracket 3. Disassembling I Stage fixed bearing end head. 4. Dismantling of shaft and I stage Rotor, body & floating bearings end head: After cleaning of all internal parts and taking measurements 5. Reassembling I stage rotor and shaft 6. Assembling floating & fixed bearing end head. 7. Assembling shaft, I stage Rotor and body 8. Installing bearings and setting I stage end travel 9. Assembling bracket and II stage and renewal of gland ropes 10. Final assembly & reinstalling pump. Including consumables and T&P’s.
Cleaning of main vacuum pump coolers. Including consumables and T&P’s.
M.ANBAZHAGAN (BID ID -1391096)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_689366.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid