Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | -22.16% | ₹2.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.5 L+₹13,566.65 (5.86%)Admitted-Fee/PreQual/Technical/Finance | -17.60% | ₹2.5 L+₹13,566.65 (5.86%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.0 L
EMD Value
₹5,960
Closing Date
5 Sept 2026, 4:00 pmClosed
Executive Engineer ID Ompora
Executive Engineer ID Ompora
construction of pick up weir and longitudinal crates at spots on Baba khul m/o Kati canal at village Tekipora Budgam
2026_IFC_320620_5
enit No 7 of 08 2026
Open Tender
Civil Works
Percentage
20 days
Budgam
Please refer Tender documents.
5 documents required · 5 mandatory
₹200
Chief Engineer Kmr I and FC Deptt.
₹5,960
8 Sept 2026
12 Aug 2026
7 Sept 2026
12 Aug 2026
5 Sept 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 85.95 | cum | 187.3 | ₹16,098.44 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 9.55 | cum | 592.9 | ₹5,662.2 |
| 3 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 92.81 | cum | 371.15 | ₹34,446.43 |
| 4 | Supply of stone soling (nallah) nominal size 225 mm | 92.81 | cum | 700 | ₹64,967 |
| 5 | Supply of crate mesh (including carriage of MT) | 4,352 | sft | 20.5 | ₹89,216 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 15.66 | cum | 218.4 | ₹3,420.14 |
| 7 | Carriage of Materials from source upto road site by Mechnical transport including cost of loading unloading and stacking .
Stone boulder from Beerwah avg. lead of 17 Kms | 92.81 | cum | 436.11 | ₹40,475.37 |
| 8 | Carriage of Materials from road site to site of work by Mannual labour Including loading unloading and stacking Avg. Lead 150 mtr.
Stone boulders | 92.81 | Cum | 338.88 | ₹31,451.45 |
| 8.1 | Crate mesh | 0.94 | MT | 189.51 | ₹177.38 |
| 9 | Providing and laying of DWC pipes 8 inch dia | 60 | Rft | 140 | ₹8,400 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.96 MB
BOQ_1066442.xls
BOQ • 0.28 MB
entension7.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .