Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance 561 8 | KANPUR | KANPUR NAGAR | UTTAR PRADESH | -15.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.0 L
EMD Value
₹99,818
Closing Date
14 Aug 2026, 3:00 pmClosed
Chief Engineer, Kanpur Municipal Corporation
Chief Engineer Office, Kanpur Municipal Corporation, Motijheel
Construction of a womens toilet at the Bhausingh Panki solid waste management plant
2026_NNKAN_1176371_1
27/AA-5/SWM/25-26
Open Tender
Civil Works
Fixed-rate
Ward 53
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,818
27 Aug 2026
12 Aug 2026
14 Aug 2026
12 Aug 2026
14 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in oridinary soil (loam clay or sand) including lift upto 1.50m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus | 11.8 | Cum | 130 | ₹1,534 |
| 2 | Filling of carted earth | 1.92 | Cum | 316 | ₹606.72 |
| 3 | Prov & laying in position cement concrete 1:4:8 excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size | 1.87 | Cum | 5,600 | ₹10,472 |
| 4 | Sand filling in plinth and under floor including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc labour and T & P etc required for proper completion of the work. Saplings of girth upto 30cm measured at a height of 1 Mt. above ground level and removal of rubbish upto a distence of 50 Mt. out side the periphery of area cleared, including cost o | 2.4 | Cum | 635 | ₹1,524 |
| 5 | Treatment of soil along external perimeter of building 7.5 liters/sqm (5) Treatment of soil under apron along external perimter 5 liters/sq | 1 | Sqm | 120 | ₹120 |
| 6 | Chequred tiles in cl etc all comp | 6.6 | Sqm | 808 | ₹5,332.8 |
| 7 | Brick work with common burnt clay (Non modular) bricks of class-150 in S/S 1:4 cement mortar | 10.87 | Cum | 7,218 | ₹78,459.66 |
| 8 | Extra for B/work in super structure | 7.84 | Cum | 222 | ₹1,740.48 |
| 9 | Half brick masonry in cement mortar | 7.84 | Sqm | 753 | ₹5,903.52 |
| 10 | 12mm thick cement plaster in 1:4 cement, fine sand etc all complete | 94 | Sqm | 195 | ₹18,330 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.22 MB
BOQ_2210624.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .