Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹9.5 LAWARDED | AWARDED |
Tender Value
₹12.2 L
EMD Value
₹15,300
Closing Date
5 Jun 2025, 9:30 pmClosed
Public Works Department
Reconstruction of Causeway at Ch 1.00 Km and Construction of Approach Road damaged due to Heavy Rain in Tiptur-Hassan State highway from Koravanagala gate to join Doddapura Heragu Road in Hassan Taluk.
PWD/2025-26/RD/WORK_INDENT22045
PWD/2025-26/RD/WORK_INDENT22045
Reserved
Roads
Electronic Documents, First(One Cover)
PWD Division Office Hassan
₹500
₹15,300
28 May 2025
28 May 2025
4 Jun 2025
Reconstruction of Causeway at Ch 1.00 Km and Construction of Approach Road damaged due to Heavy Rain in Tiptur-Hassan State highway from Koravanagala gate to join Doddapura Heragu Road in Hassan Taluk.
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated mate...
Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical speci...
Granular Sub-Base - By Mix in Place Method - Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared sur...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 150...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .