| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.1 LAccepted-Finance | L1 | Accepted-Finance BOQ Rate accepted | |
| 2 | L2₹28.3 L+₹1.3 L (4.63%)Accepted-Finance 245 1A SATIN SEN SARANI KOLKATA 700054 | KOLKATA | KOLKATA | WEST BENGAL | 700054 | L2 | Accepted-Finance BOQ Rate accepted | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Tender rejected due to non-satisfaction of BQR Condition (1). The tenderer M/s.Shakthi Construction Tuticorin 628 503 have not uploaded previous experience in Civil works carried out in any one of the thermal generating stations of SEB/Central Govt. |
Tender Value
Refer Docs
EMD Value
₹24,700
Closing Date
2 Nov 2023, 2:00 pmClosed
SE Civil TTPS TTN 4
fice of the SE Civil TTPS TTN 4
Construction of New Shed for storing boiler materials near checker room at Central Store TTPS
2023_EB_379839_1
Spec.No.CE SE CIVIL TTPS 170 2023 2024
Open Tender
Civil Works - Others
Item Rate
120 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹24,700
Yes
4 Nov 2023
17 Oct 2023
3 Nov 2023
17 Oct 2023
2 Nov 2023
17 Oct 2023
Dismantling the existing PCC for the required width & depth as per the instructions of engineer in charge including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing PCC 1:2:4 using OP/PP cement with 20 to 12mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Refilling with excavated soil other than sand complying with standard specification for filling in foundation and basement with watering and consolidation including cost of all materials, labours, lead, lift, etc. complete.
Earth work excavation in all soils such as sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil and depositing on bank with an initial lead of 10m and initial lift of 2m and disposing the excess excavated earth 1Km away from the site including cost of all materials labours, lead, lift, etc. complete.
Filling with sand for filling in basement with watering and consolidation including cost of all materials, labours, lead, lift and dewatering etc. complete.
PCC 1:4:8 using OP/PP cement with 40mm size machine crushed HGB metal for flooring in damaged places including cost of all materials, labours, lead, lift, curing, etc., complete.
Providing centering and shuttering arrangements for placing concrete using steel members and wooden props including cost of all materials, labour, lead, lift etc., complete.
Providing R.C.C 1:1½:3 using O.P Cement with 12-20 mm machine crushed HBG metal including cost of all materials, labour, T and P, leads, lifts, curing, etc., complete but including cost of reinforcement and form work etc., complete.
Supplying fabrication and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire lead, lift, etc., complete.
Brick work in CM 1:5 using class II bricks including cost of all materials, labours, lead, lift, curing, etc. complete.
Plastering with CM 1:5, 12mm thick including cost of all materials, lead, lift scaffolding, curing, white washing etc., complete.
Providing two coats of Acrylic distemper of approved quality, brand & colour in new inner surfaces over a coat of primer including cost of all materials, scaffolding charges, labours, lead, lift, curing, etc. complete.
Providing two coats with ready mixed plastic emulsion (exterior walls) of first class quality paint & approved colour over a priming coat including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc. complete.
Supplying and providing new GALVALUME Sheets of 0.47mm thick for roof. The rate including cost of all materials, fixtures, bolts/ reverts with all lead, lift, labour etc., complete.
Supplying and fixing structural steel materials, such as ISMB 250 x 125 for column, Square pipe in different size as instructed by Engineer at site, Foundation bolt & nut, Base plate 16 mm etc., including cost of all material, lead, lift etc., complete.
KRISHNA ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .