| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance 64 1 EXSERVICE MAN COLONY BHAVANISAGAR 638451 SATHYAMANGALAM TK ERODE DISTRICT TAMIL NADU | ERODE | TAMIL NADU | 638451 | ₹1.2 Cr | L1 | Accepted-Finance Accept |
| 2 | L2₹1.3 Cr+₹11.8 L (10.0%)Accepted-Finance | ₹1.3 Cr+₹11.8 L (10.0%) | L2 | Accepted-Finance Accept |
| 3 | L3₹1.3 Cr+₹12.5 L (10.6%)Accepted-Finance 44 ERODE ROAD MUTHUR 638 105 | TIRUPPUR | TAMIL NADU | 638105 | ₹1.3 Cr+₹12.5 L (10.6%) | L3 | Accepted-Finance Accept |
| 4 | L4₹1.4 Cr+₹17.4 L (14.8%)Accepted-Finance | ₹1.4 Cr+₹17.4 L (14.8%) | L4 | Accepted-Finance Accept |
| 5 | L5₹1.4 Cr+₹18.1 L (15.3%)Accepted-Finance 144 A THOTTIPALAYAM MUTHUR ERODE 638 105 | TIRUPPUR | TAMIL NADU | 638105 | ₹1.4 Cr+₹18.1 L (15.3%) | L5 | Accepted-Finance Accept |
| Sl No | Description | Qty | Unit | KARVEMBU AND COMPANY L3 | CP Construction and Infrastructure L8 | SRI BALAJI AND CO L7 | AMMAN AND CO L2 | Sri Ponkaaliamman Infra Projects L4 | DIVYA DARSHANI AND CO L5 | SAKTHI AND CO L1 | A GANESAN L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Name of the Work : Upgradationof the Road at Arachalur Srilankan Tamil refugees Camp under Phase III (2025-26) H/o Vadugapatti Town panchayat of Erode District. of Erode District. | |||||||||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 2,499.12 | M2 | 4.83 ₹12,070.75 | 15 ₹37,486.8 | 5 ₹12,495.6 | 4.8 ₹11,995.78 | 6.3 ₹15,744.46 | 4 ₹9,996.48 | 5 ₹12,495.6 | 3.5 ₹8,746.92 Lowest |
| 3.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms. | 780.99 | M3 | 365 ₹2,85,061.35 | 600 ₹4,68,594 | 410.17 ₹3,20,338.67 | 328 ₹2,56,164.72 | 66 ₹51,545.34 Lowest | 200 ₹1,56,198 | 250 ₹1,95,247.5 | 367 ₹2,86,623.33 |
| 4.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 868.69 | cu.m | 1,920.27 ₹16,68,119.35 | 2,000 ₹17,37,380 | 2,400.07 ₹20,84,916.81 | 1,974 ₹17,14,794.06 | 2,050 ₹17,80,814.5 | 2,000 ₹17,37,380 | 1,800 ₹15,63,642 Lowest | 2,107 ₹18,30,329.83 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 1,303.04 | M3 | 1,996.17 ₹26,01,089.36 | 2,050 ₹26,71,232 | 2,400.21 ₹31,27,569.64 | 2,055 ₹26,77,747.2 | 2,060 ₹26,84,262.4 | 2,200 ₹28,66,688 | 1,800 ₹23,45,472 Lowest | 2,119 ₹27,61,141.76 |
| 6.00 | Providing and laying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 8,686.88 | M2 | 78.94 ₹6,85,742.31 | 100 ₹8,68,688 | 80.8 ₹7,01,899.9 | 81.3 ₹7,06,243.34 | 80 ₹6,94,950.4 | 80 ₹6,94,950.4 | 50 ₹4,34,344 Lowest | 85 ₹7,38,384.8 |
| 7.00 | Providing and laying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 8,686.88 | M2 | 20.49 ₹1,77,994.17 | 20 ₹1,73,737.6 | 20.4 ₹1,77,212.35 | 20.9 ₹1,81,555.79 | 20 ₹1,73,737.6 | 22 ₹1,91,111.36 | 15 ₹1,30,303.2 Lowest | 20 ₹1,73,737.6 |
| 8.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 217.2 | cum | 13,200 ₹28,67,040 | 15,000 ₹32,58,000 | 15,000.22 ₹32,58,047.78 | 12,417 ₹26,96,972.4 | 10,900 ₹23,67,480 | 13,000 ₹28,23,600 | 10,000 ₹21,72,000 Lowest | 14,500 ₹31,49,400 |
| 9.00 | Road Marking with hot applied thermoplastic compound with reflectorising glass beads on Bituminous surface | 462.8 | sq.m | 675.51 ₹3,12,626.03 | 830 ₹3,84,124 | 700 ₹3,23,960 | 680 ₹3,14,704 | 750 ₹3,47,100 | 700 ₹3,23,960 | 450 ₹2,08,260 Lowest | 750 ₹3,47,100 |
| 10.00Construction of Retaining wall at Arachalur Srilankan Camp | |||||||||||
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
17 Aug 2026, 3:00 pmClosed
Block Development Officer (B.P), Modakkurichi
Block Development Office Modakkurichi Block
1.Upgradation of Road at the Arachalur Srilankan Tamil Refugees Camp - Rs.13821000, 2.Construction Of 30,000 Litres OHT With 12m Staging Height at Arachalur Srilankan Tamil Refugees Camp - Rs.2411000 3.Providing 176 nos of FHTC at Arachalur Srilank
2026_RDTN_689246_1
Roc No.639/2025/A6, Dated 22.07.2026
Open Tender
Civil Works - Others
Item Rate
180 days
Modakkurichi
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.7 L
7 Sept 2026
29 Jul 2026
17 Aug 2026
29 Jul 2026
17 Aug 2026
29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of the Work : Upgradationof the Road at Arachalur Srilankan Tamil refugees Camp under Phase III (2025-26) H/o Vadugapatti Town panchayat of Erode District. of Erode District. | - | - | - | - |
| 2 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 2,499.12 | M2 | - | - |
| 3 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms. | 780.99 | M3 | - | - |
| 4 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 868.69 | cu.m | - | - |
| 5 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 1,303.04 | M3 | - | - |
| 6 | Providing and laying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 8,686.88 | M2 | - | - |
| 7 | Providing and laying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 8,686.88 | M2 | - | - |
| 8 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 217.2 | cum | - | - |
| 9 | Road Marking with hot applied thermoplastic compound with reflectorising glass beads on Bituminous surface | 462.8 | sq.m | - | - |
| 10 | Construction of Retaining wall at Arachalur Srilankan Camp | - | - | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.68 MB
techbid.pdf
Tender Documents • 0.79 MB
BOQ_828508.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .