| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹70.1 LAccepted-AOC | ₹70.1 L | L-1 | Accepted-AOC L-1 ksn construction
Lowest Rate |
| 2 | L-2₹71.8 LRejected-AOC ERODE 638 002 | ERODE | TAMIL NADU | 638002 | ₹71.8 L | L-2 | Rejected-AOC L-2 R SURESHMANI
Highest Rate |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | ksn construction L1 | R SURESHMANI L2 |
|---|---|---|---|---|---|
| 1.00Kaveripakkam Block | |||||
| 2.00Construction of Diversion storm water drainage With Horizontal Fillter at srilankan refugee campus H/O Banavaram Panchayat in Kaveripakkam Block, Ranipet District | |||||
| 3.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 786.6 | Cum | 260 ₹2.0 L | 270 ₹2.1 L |
| 4.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 134.7 | Cum | 5,650 ₹7.6 L | 5,770 ₹7.8 L |
| 5.00 | Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc., | 2,802.96 | Sqm | 547 ₹15.3 L | 560 ₹15.7 L |
| 6.00 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 153 | Cum | 7,061 ₹10.8 L | 7,210 ₹11.0 L |
| 7.00 | Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. | 510 | Sqm | 595 ₹3.0 L | 610 ₹3.1 L |
| 8.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyanance and all labour charges etc compet | 122.4 | Cum | 9,568 ₹11.7 L | 9,760 ₹11.9 L |
| 9.00 | Supplying and fabrication of steel including cost and conveyance of including cost and conveyanance and all labour charges etc compete | 6.66 | Mt | 91,969 ₹6.1 L | 93,810 ₹6.2 L |
| 10.00 | 110mm PVC 6ksc pipe | 240 | Nos | 142 ₹34,080 | 150 ₹36,000 |
Tender Value
₹70.2 L
EMD Value
₹71,300
Closing Date
8 Oct 2025, 3:00 pmClosed
Project Director
Project Director DDA-Ranipet
Construction of Diversion storm water drainage With Horizontal Fillter at srilankan refugee campus H/O Banavaram Panchayat in Kaveripakkam Block, Ranipet District Srilankan Thamizhar Nalan Scheme 2025-26
2025_RDTN_611045_1
A8/2250/2025
Open Tender
Civil Works
30 days
DRDA-Ranipet
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹71,300
8 Jan 2026
3 Oct 2025
8 Oct 2025
3 Oct 2025
8 Oct 2025
3 Oct 2025
Amount
Kaveripakkam Block
Construction of Diversion storm water drainage With Horizontal Fillter at srilankan refugee campus H/O Banavaram Panchayat in Kaveripakkam Block, Ranipet District
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying and erecting steel centering for Plane surfaces RC slab, beam, lintel bed block landing slab waist slab etc.,
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyanance and all labour charges etc compet
Supplying and fabrication of steel including cost and conveyance of including cost and conveyanance and all labour charges etc compete
110mm PVC 6ksc pipe
Provision for Horizontal Filter - 1
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc.,
Supplying and erecting steel centering for Plane surfaces
Cement concrete 1 : 3 : 6 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete
Towards cost and supply with sand including cost and conveyance et all complete
Supply and filling with 40mm metal from approved quarry
Collection and supply of well gravel from approved quarry including cost and conveyance etc
Supply and filling of char coal including cost and conveyance
Supply and filling with 20mm metal from approved quarry
Supply and fixing of of steel grill fabrication including cost and conveyance
Supply and fixing of 110mm dia 6 ksc pvc pipe including all cost and conveyance
Painting two coats using ready mixed plastic emulsion inluding priming coat etc
Provision for Horizontal Filter - 2
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc.,
Supplying and erecting steel centering for Plane surfaces
Cement concrete 1 : 3 : 6 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete
Towards cost and supply with sand including cost and conveyance et all complete
Supply and filling with 40mm metal from approved quarry
Collection and supply of well gravel from approved quarry including cost and conveyance etc
Supply and filling of char coal including cost and conveyance
Supply and filling with 20mm metal from approved quarry
Supply and fixing of of steel grill fabrication including cost and conveyance
Supply and fixing of 110mm dia 6 ksc pvc pipe including all cost and conveyance
Painting two coats using ready mixed plastic emulsion inluding priming coat etc
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
R SURESHMANI (BID ID -1481188)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid