Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-AOC H 11 HOUSING BOARD UNIT MADHAYANKUTTAI PO METTUR DAM 52 | METTUR DAM | SALEM | TAMIL NADU | ₹1.0 L Quoted ₹1.1 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | KPRABHAKARAN ENGINEERING CONTRACTOR L1 |
|---|---|---|---|---|
| 1.00 | Charges for Disconnection of power cable, decoupling, releasing the 225 KW Kirloskar make motor from its bed, shifting to repair bay. (Any two motors in AHPH St.-I) | 4 | Nos | 5,060 ₹20,240 Lowest |
| 2.00 | Fixing motor pulley sleeve, pulley discs in complete shape(Any two motors in AHPH St.-I) | 2 | Nos | 8,280 ₹16,560 Lowest |
| 3.00 | Charges for Shifting the 225 KW Kirloskar make motor to its bed, connection of power cable, alignment, coupling the motor with pump and trial run.(Any two motors in AHPH St.-I) | 2 | Nos | 10,120 ₹20,240 Lowest |
| 4.00 | Charges for Disconnection of power cable, Decoupling, releasing the Crompton make 200 KW / Siemens make 190KW motor from its bed and shifting to repair bay.(Any two motors in AHPH St.-II) | 4 | Nos | 4,620 ₹18,480 Lowest |
| 5.00 | Charges for Providing rubber gasket and fixing cooler unit. (Applicable for 200 KW motor) if necessary. (Any two motors in AHPH St.-II) | 2 | Nos | 4,985 ₹9,970 Lowest |
| 6.00 | Charges for shifting the Crompton make 200 KW / Siemens make 190KW motor to its bed from repair bay, connection of power cable, alignment, coupling and trail run. (Any two motors in AHPH St.-II) | 2 | Nos | 10,120 ₹20,240 Lowest |
Tender Value
Refer Docs
Closing Date
3 Nov 2025, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES Circle EMII SDIII Replacement of failed 225KW kirloskar make 200 KW crompton make 190 KW siemens make Ash slurry pump HT motor in any of the two stages of AHPH due to motor failure vibration problem during the 2025 26
2025_EB_615380_1
CE-MTPSI-SE-ES-EMII-OT91-25-26
Open Tender
Electrical Works
Works
8 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
Yes
16 Jul 2026
17 Oct 2025
4 Nov 2025
17 Oct 2025
3 Nov 2025
17 Oct 2025
Amount
Charges for Disconnection of power cable, decoupling, releasing the 225 KW Kirloskar make motor from its bed, shifting to repair bay. (Any two motors in AHPH St.-I)
Fixing motor pulley sleeve, pulley discs in complete shape(Any two motors in AHPH St.-I)
Charges for Shifting the 225 KW Kirloskar make motor to its bed, connection of power cable, alignment, coupling the motor with pump and trial run.(Any two motors in AHPH St.-I)
Charges for Disconnection of power cable, Decoupling, releasing the Crompton make 200 KW / Siemens make 190KW motor from its bed and shifting to repair bay.(Any two motors in AHPH St.-II)
Charges for Providing rubber gasket and fixing cooler unit. (Applicable for 200 KW motor) if necessary. (Any two motors in AHPH St.-II)
Charges for shifting the Crompton make 200 KW / Siemens make 190KW motor to its bed from repair bay, connection of power cable, alignment, coupling and trail run. (Any two motors in AHPH St.-II)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_735257.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].