| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.4 LAdmitted-Finance 14 4A KALI PRASAD C HAKRABORTY ST CAL KOLKATA 700003 | KOLKATA | WEST BENGAL | 700003 | +0.00% | ₹22.4 L | L1 | Admitted-Finance |
| 2 | L2₹22.8 L+₹44,737 (2.00%)Admitted-Finance 22 SIRISH CH CHOWDHURY LANE CAL 2 700002 | KOLKATA | WEST BENGAL | 700002 | +2.00% | ₹22.8 L+₹44,737 (2.00%) | L2 | Admitted-Finance |
| 3 | L3₹23.1 L+₹73,816 (3.30%)Admitted-Finance | +3.30% | ₹23.1 L+₹73,816 (3.30%) | L3 | Admitted-Finance |
Tender Value
₹22.4 L
EMD Value
₹45,000
Closing Date
15 Jan 2026, 9:00 amClosed
DG (C)
5 SN BANERJEE ROAD
CONSTRUCTION OF BOX DRAIN INSIDE CHITPUR RAIL YARD (SOUTHERN SIDE) IN WARD NO 005
2025_KMC_979598_1
KMC/DG(C)/I/005/23/2025-2026
Open Tender
CIVIL WORKS
Percentage
KOLKATA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹45,000
1 Jul 2026
25 Dec 2025
17 Jan 2026
25 Dec 2025
15 Jan 2026
25 Dec 2025
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (i) In ordinary soil (Ref :PWD (Rds & Brdgs)-2018 It. No. 3.04 Page No.237)
BRICK WORK WITH 1ST CLASS
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1)
PLASTER (TO WALL, FLOOR, CEILING ETC.) WITH SAND AND CEMENT MORTAR INCLUDING ROUNDING OFF OR CHAMFERING CORNERS AS DIRECTED: WITH 1:4 CEMENT MORTAR : 15 MM THICK PLASTER
BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36.Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work
REINFORCEMENT FOR REINFORCED CONCRETE WORK IN ALL SORTS OF STRUCTURES INCLUDING DISTRIBUTION BARS, STIRRUPS, BINDERS ETC INITIAL STRAIGHTENING AND REMOVAL OF LOOSE RUST
ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018)
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 20)Khalasi. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
Removal of silt, slush, musks or any other foul materials from open drains or nikashis of any size and depth, manholes, gully pits, catch pits etc. by any other method approved of impure / inflammable / asphyxiating gases from the drains etc. with staging if necessary, stacking of the materials properly away from traffic lane as far as practicable lead upto 75 mtr. with all labour and materials and hire charges of tools and plants as per direction of Engineerin- Charge. For Open Nikashi or Drain. Transportation of silt, slush or other foul materials from the working site and disposal of the same beyond the area of Municipal Corporation / Municipality / Notified Area Authority / Industrial Township Authority including the cost of loading, unloading, transportation and making arrangement of necessary land for disposal, spreading and leveling as necessary etc. complete (Land for disposal to be arranged by the contractor). (Payment to be made on the basis of stack measurement after deducting sinkage/shrinkage at the rate of 1/9th of volume) For Day :
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
Estimated amount
Add: 9%SGST
Add: 9%CGST
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.63 MB
SOQ1.pdf
Additional Documents • 0.81 MB
TenderFormat.pdf
Tender Documents • 0.25 MB
BOQ_2387946.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .