| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.6 CrAccepted-Finance M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹2.6 Cr | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹2.7 Cr+₹7.7 L (2.99%)Rejected-Finance | ₹2.7 Cr+₹7.7 L (2.99%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹2.7 Cr+₹9.5 L (3.67%)Rejected-Finance | ₹2.7 Cr+₹9.5 L (3.67%) | L-3 | Rejected-Finance L-3 |
| Sl No | Description | Qty | Unit | M/S BADRI SINGH L1 | M/S RAMPYARE SINGH L2 | M/S LALMANI MAURYA L3 |
|---|---|---|---|---|---|---|
| 1.00 | Removal and disposal of over burden of hard soil mixed with boulder including all lead, with proper disposal, labour charges and T&P required for proper completion of work | 758.32 | Cum. | 149 ₹1,12,989.68 Lowest | 188 ₹1,42,564.16 | 180 ₹1,36,497.6 |
| 2.00 | (a)-Removing boulder from canal bed which have fallen during overburden removal from R/B & L/B of canal during execution of work including all lead and lift with proper completion of work as per the direction of Engineer in Charge. | 227.5 | Cum. | 165 ₹37,537.5 Lowest | 200 ₹45,500 | 180 ₹40,950 |
| 2.10 | (b)-Earth work in excavation in sand stone,lime stone or other soft rock mixed with boulder by pick axe including all lead and lift with proper completion of work. | 5,144.43 | Cum. | 180 ₹9,25,997.4 Lowest | 239 ₹12,29,518.77 | 240 ₹12,34,663.2 |
| 3.00 | Providing and laying Coarse sand in filling for lining work including cost of all materials, labour charges & T&P etc. required for proper completion of work. | 165.55 | Cum. | 2,800 ₹4,63,540 Lowest | 2,970 ₹4,91,683.5 | 3,000 ₹4,96,650 |
| 4.00 | Supplying and laying of 150 micron LDPE film in bed before laying of concrete in lining including cost of all material, labour, T&P etc. required for proper completion of work. | 460 | M2 | 40 ₹18,400 Lowest | 46 ₹21,160 | 40 ₹18,400 Lowest |
| 5.00 | Centering & shuttering for C.C work including cost of all material, labour, T&P etc. required for proper completion of work. | 1,079.2 | M2 | 180 ₹1,94,256 Lowest | 260 ₹2,80,592 | 250 ₹2,69,800 |
| 6.00 | Laying P.C.C. 1:3:6 ( with 1 cement :3 coarse sand FM not less than 2.00, 6 stone ballast size 20 to 40 mm) including cost of all material, labour, T&P etc. with all lead and lift required for proper completion of work. | 571.66 | Cum. | 4,200 ₹24,00,972 Lowest | 4,545 ₹25,98,194.7 | 4,600 ₹26,29,636 |
| 7.00 | Laying C.C. 1:2:4 in bed (with cement, coarse sand of FM. not less than 2.0 and hard stone grit 4.75 mm to 20. mm size) including cost of all material, labour, T&P etc. with all lead and lift required for proper completion of work. | 279.14 | M3 | 6,000 ₹16,74,840 Lowest | 6,333 ₹17,67,793.62 | 6,300 ₹17,58,582 |
| 8.00 | C.R. stone masonry with 1:3 cement coarse mortar including cost of material, T&P etc. required for proper completion of work. | 4,203.76 | M3 | 4,200 ₹1,76,55,792 | 4,190 ₹1,76,13,754.4 Lowest | 4,250 ₹1,78,65,980 |
| 9.00 | Cement plaster 1:3 C.M. on stone masonry including cost of all materials,T&P etc required for proper completion of work.(20 mm thick) | 5,397.88 | M2 | 200 ₹10,79,576 | 200 ₹10,79,576 | 180 ₹9,71,618.4 Lowest |
Tender Value
Refer Docs
EMD Value
₹5.8 L
Closing Date
17 Jul 2026, 2:00 pmClosed
S.E. B.S.C.C.C.-1, Mzp
Superintending Engineer, Bansagar Canal Construction Circle-1, Mirzapur
Construction of C.R. Stone Masonry Wall in the internal section of Meja Jirgo Link Canal between Km. 26.248 to 28.400
2026_UPIDC_1164332_4
02/SE/2026-27
Open Tender
Civil Works
Item Rate
240 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹5.8 L
20 Sept 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removal and disposal of over burden of hard soil mixed with boulder including all lead, with proper disposal, labour charges and T&P required for proper completion of work | 758.32 | Cum. | - | - |
| 2 | (a)-Removing boulder from canal bed which have fallen during overburden removal from R/B & L/B of canal during execution of work including all lead and lift with proper completion of work as per the direction of Engineer in Charge. | 227.5 | Cum. | - | - |
| 2.1 | (b)-Earth work in excavation in sand stone,lime stone or other soft rock mixed with boulder by pick axe including all lead and lift with proper completion of work. | 5,144.43 | Cum. | - | - |
| 3 | Providing and laying Coarse sand in filling for lining work including cost of all materials, labour charges & T&P etc. required for proper completion of work. | 165.55 | Cum. | - | - |
| 4 | Supplying and laying of 150 micron LDPE film in bed before laying of concrete in lining including cost of all material, labour, T&P etc. required for proper completion of work. | 460 | M2 | - | - |
| 5 | Centering & shuttering for C.C work including cost of all material, labour, T&P etc. required for proper completion of work. | 1,079.2 | M2 | - | - |
| 6 | Laying P.C.C. 1:3:6 ( with 1 cement :3 coarse sand FM not less than 2.00, 6 stone ballast size 20 to 40 mm) including cost of all material, labour, T&P etc. with all lead and lift required for proper completion of work. | 571.66 | Cum. | - | - |
| 7 | Laying C.C. 1:2:4 in bed (with cement, coarse sand of FM. not less than 2.0 and hard stone grit 4.75 mm to 20. mm size) including cost of all material, labour, T&P etc. with all lead and lift required for proper completion of work. | 279.14 | M3 | - | - |
| 8 | C.R. stone masonry with 1:3 cement coarse mortar including cost of material, T&P etc. required for proper completion of work. | 4,203.76 | M3 | - | - |
| 9 | Cement plaster 1:3 C.M. on stone masonry including cost of all materials,T&P etc required for proper completion of work.(20 mm thick) | 5,397.88 | M2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_2190565.xls
BOQ • 5.34 MB
Tender_Document_Lot_2.pdf
Tender Documents • 2.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .