| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.3 LAccepted-AOC WAXPOL ROAD NEAR MILITARY GATE BUTI MORE PS SADAR RANCHI JH 835217 | RANCHI | JHARKHAND | 835217 | ₹27.3 L Quoted ₹29.1 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹30.7 L+₹1.6 L (5.56%)Rejected-Finance 101 GROUND FLOOR RAJASTHALI ENCLAVE DUMARDAGA RANCHI JHARKHAND 834012 | RANCHI | JHARKHAND | 834012 | ₹30.7 L+₹1.6 L (5.56%) | L2 | Rejected-Finance Quoted rate more than L1 |
| 3 | L3₹35.4 L+₹6.3 L (21.7%)Rejected-Finance | ₹35.4 L+₹6.3 L (21.7%) | L3 | Rejected-Finance Quoted rate more than L1 |
| 4 | L4₹42.6 L+₹13.6 L (46.7%)Rejected-Finance KUSUM VATIKA SHIV SHAKTI NAGAR KOKAR RANCHI 834001 | RANCHI | JHARKHAND | 834001 | ₹42.6 L+₹13.6 L (46.7%) | L4 | Rejected-Finance Quoted rate more than L1 |
| 5 | L5₹43.0 L+₹13.9 L (47.9%)Rejected-Finance B 1203 VRINDA RESIDENCY BARIATU ROAD RANCHI JHARKHAND 834009 | RANCHI | RANCHI | JHARKHAND | 834009 | ₹43.0 L+₹13.9 L (47.9%) | L5 | Rejected-Finance Quoted rate more than L1 |
| Sl No | Description | Qty | Unit | arics infrastructure L5 | M/S NIRBHAY KUMAR SINGH L6 | M/s Bawa Brothers L3 | Delhi Enterprises L4 | M/S SURYA BUILDERS L7 | M/s Animesh Kumar & Co. L1 | M/S SHRI SHYAM BUILDERS L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation over areas n exc 1.5 m deep in soft/ loose soil and getting out complete all as specified and directed. | 20 | Cum | 280 ₹5,600 | 200 ₹4,000 | 120 ₹2,400 Lowest | 300 ₹6,000 | 200 ₹4,000 | 300 ₹6,000 | 170 ₹3,400 |
| 2.00 | Excavation over areas exc 1.5 m and n exc 3.00 m deep in soft/ loose soil and getting out complete all as specified and directed. | 25 | Cum | 280 ₹7,000 | 200 ₹5,000 | 120 ₹3,000 Lowest | 300 ₹7,500 | 200 ₹5,000 | 350 ₹8,750 | 210 ₹5,250 |
| 3.00 | Excavation in trenches n exc 1.5 m wide n exc 1.5 m deep in soft/ loose soil for foundation etc or for shaft, wells, manholes etc n exc 10 Sqm on plan and not exc 1.5 m in depth and getting out. complete all as specified and directed. | 648 | Cum | 280 ₹1,81,440 | 200 ₹1,29,600 | 130 ₹84,240 Lowest | 300 ₹1,94,400 | 200 ₹1,29,600 | 180 ₹1,16,640 | 150 ₹97,200 |
| 4.00 | Excavation in trenches n.exc 1.5 m wide but exc 1.5 m deep up to 3mtr depth in soft/ loose soil for foundation etc or for shaft, wells, manholes etc n exc 10 Sqm on plan and exc 1.5 m in depth but n.exc 3mtr depth and getting out. complete all as specified and directed. | 10 | Cum | 280 ₹2,800 | 200 ₹2,000 | 130 ₹1,300 Lowest | 300 ₹3,000 | 200 ₹2,000 | 400 ₹4,000 | 320 ₹3,200 |
| 5.00 | Demolition of cement concrete(unreinforced)in ground floors and paving not exceeding 15cm thickness (below or above ground level) complete all as directed | 20 | Cum | 500 ₹10,000 | 200 ₹4,000 | 150 ₹3,000 | 600 ₹12,000 | 200 ₹4,000 | 100 ₹2,000 | 70 ₹1,400 Lowest |
| 6.00 | Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for such as cover slab of manholes and septic tank, etc, reinforcement cut as required to facilite demolition complete all as directed | 20 | Cum | 600 ₹12,000 | 200 ₹4,000 | 150 ₹3,000 | 1,000 ₹20,000 | 200 ₹4,000 | 100 ₹2,000 | 70 ₹1,400 Lowest |
| 7.00 | Cleaning of existing sewage line 150 mm internal dia at any depth incl manholes by removing the manholes covers of any type/ size and cleaning by means of hydraulic jet pressure machine/ manually bamboo rodding as required at site from manholes and well flushing with water after cleaning incl getting out sludge if any and liquid materials from connecting manholes deposited in sewer line and removing the solids and sludge to at distance not exceeding 250m and covering the same with the soil obtained from excavation of pit including excavation and earth work and reinstating the manhole covers in its original position and as directed by Engr - in - Charge.
Note:- Cleaning of existing sewage pipe line / manholes by suitable suction pump loaded vehicle / trailers / manually by bamboo rodding available in the market and depose effluent out side the defence land shall be included in the quoted rate. | 4,200 | RM | 45 ₹1,89,000 | 200 ₹8,40,000 | 10 ₹42,000 Lowest | 50 ₹2,10,000 | 250 ₹10,50,000 | 15 ₹63,000 | 40 ₹1,68,000 |
| 8.00 | All as per item no 7 here in beforebut 200 mm bore pipe. | 150 | RM | 50 ₹7,500 | 250 ₹37,500 | 15 ₹2,250 Lowest | 60 ₹9,000 | 300 ₹45,000 | 20 ₹3,000 | 44 ₹6,600 |
| 9.00 | Cleaning the blockage of bathroom/kitchen by cleaning the nahani traps / gully traps/ IWC/EWC of all the mud / sludge and getting out washing throughly traps, CI waste pipe by opening the cleaning eyes and depositing the sludge in a pit of suitable size at a distance not exceeding 250m from the gully trap and covering the same with the soil obtained from excavation of pit including excavation and earth work complete all as specified and directed.
. | 850 | Each job | 160 ₹1,36,000 | 200 ₹1,70,000 | 20 ₹17,000 Lowest | 150 ₹1,27,500 | 250 ₹2,12,500 | 30 ₹25,500 | 70 ₹59,500 |
| 10.00 | Cleaning the blockage of WC indian or European type by removing of all the mud / sludge and getting out including cleaning of SGSW or CI pipe upto first manholes and depositing the sludge in a pit of suitable size at a distance not exceeding 250m from the WC and covering the same with the soil obtained from excavation of pit including excavation and earth work complete all as specified and directed. | 350 | Each job | 120 ₹42,000 | 200 ₹70,000 | 20 ₹7,000 Lowest | 100 ₹35,000 | 300 ₹1,05,000 | 30 ₹10,500 | 70 ₹24,500 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
1 Jul 2026, 6:00 pmClosed
GE DIPATOLI
GARRISON ENGINEER MILITARY ENGINEER SERVICES DIPATOLI CANTT PO- HOTWAR RANCHI Pin- 834012
REPAIR/CLEANING OF SEWAGE SYSTEM TO CERTAIN MD AND OTM ACCN OF ENGR REGT EME BN SIKH REGIMENT FD HOSP INF DIV CAMP IN THE SOUTH ZONE AREA UNDER GE DIPATOLI
2026_MES_770680_1
8000/2211/E8
Open Tender
Civil Works
Item Rate
270 days
DIPATOLI
As per tender documents
6 documents required · 6 mandatory
₹500
GE DIPATOLI
₹98,000
Yes
24 Aug 2026
10 Jun 2026
8 Jul 2026
10 Jun 2026
1 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation over areas n exc 1.5 m deep in soft/ loose soil and getting out complete all as specified and directed. | 20 | Cum | - | - |
| 2 | Excavation over areas exc 1.5 m and n exc 3.00 m deep in soft/ loose soil and getting out complete all as specified and directed. | 25 | Cum | - | - |
| 3 | Excavation in trenches n exc 1.5 m wide n exc 1.5 m deep in soft/ loose soil for foundation etc or for shaft, wells, manholes etc n exc 10 Sqm on plan and not exc 1.5 m in depth and getting out. complete all as specified and directed. | 648 | Cum | - | - |
| 4 | Excavation in trenches n.exc 1.5 m wide but exc 1.5 m deep up to 3mtr depth in soft/ loose soil for foundation etc or for shaft, wells, manholes etc n exc 10 Sqm on plan and exc 1.5 m in depth but n.exc 3mtr depth and getting out. complete all as specified and directed. | 10 | Cum | - | - |
| 5 | Demolition of cement concrete(unreinforced)in ground floors and paving not exceeding 15cm thickness (below or above ground level) complete all as directed | 20 | Cum | - | - |
| 6 | Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for such as cover slab of manholes and septic tank, etc, reinforcement cut as required to facilite demolition complete all as directed | 20 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_863051.xls
BOQ • 0.46 MB
TENDER2211.pdf
Tender Documents • 1.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .