| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC AOC |
| 2 | L2₹4.3 LRejected-Finance 143 C DR RAJENDRA ROAD KOLKATA 700020 | KOLKATA | KOLKATA | WEST BENGAL | 700020 | ₹4.3 L | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹5.0 LRejected-Finance 13 11 MOTILAL GUPTA ROAD KOLKATA 700 008 | KOLKATA | WEST BENGAL | 700008 | ₹5.0 L | L3 | Rejected-Finance 3rd Lowest |
| 4 | L4₹6.7 LRejected-Finance 1 C NEPAL BHATTACHARJEE STREET KALIGHAT KOLKATA 700026 | KOLKATA | WEST BENGAL | 700026 | ₹6.7 L | L4 | Rejected-Finance 4th Lowest |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected for the reason- penalty was imposed against acceptance no. 31-Q-MESD of 2024 25 of AE MESD for inferior quality of materials and failure to rectify the defect thereafter. The compensation amount has not been submitted till date |
Tender Value
Refer Docs
EMD Value
₹9,223
Closing Date
11 Dec 2025, 4:00 pmClosed
AEPWDMESD
Netaji Indoor Stadium Campus Eden Gardens, Kolkata 700 021
Temporary electrification and illumination work in respect of Celebration of Christmas 2025 and New Year 2026 at different sites under Maidan Electrical Sub-Division, PWD.
2025_WBPWD_951207_1
WBPWD/AE-MESD/e-NIQ NO-08/Q of 2025-26
Open Tender
ELECTRICAL WORKS ORG
7 days
Maidan
Please refer Tender documents.
6 documents required · 6 mandatory
₹9,223
11 Feb 2026
17 Nov 2025
15 Dec 2025
18 Nov 2025
11 Dec 2025
18 Nov 2025
Amount
Supply and drawing of the following sizes pvc insulated and unsheathed multistranded Al Cable on hire basis with carrying cost at the sites and dismantling as per direction of EIC including socketing and necessary finishing as required(for 10 days from 23.12.2025 to 01.01.2026).
70 Sqmm 4 Core Al Cable (Armoured)
50 Sqmm 4 Core Al Cable (Armoured)
25 Sqmm/16 Sqmm 4 Core Al Cable (Armoured)
S&D following single core PVC copper wire on hire basis incl. dismantling the same.(for 10 days from 23.12.2025 to 01.01.2026).
2x 7/0.029 (7/20) single vcore PVC copper wire
2x 3/0.036 (3/20) single core PVC copper wire.
Providing and installation on Hire basis 500V 250/200 Amp TPN MS with HRC fuse and 315 Amp 4 Bars Copper BBC fixed on angle iron frame incl providing necy inter connection wiring, 2 nos of earthing with earthing attachment and dismantling as directed by EIC after the programme(for 10 days from 23.12.2025 to 01.01.2026).
Providing and installation on hire basis 500 V , 100Amp 4 Pole MCB isolator as incomer with 32Amp or 16 Amp per way, 6 Way TPNMCBDB with all arrangement in a outdoor type pillar box incl interconnection with proper socketing,2nos of earthing attachment and dismantling as direcyted by EIC after the programme(for 10 days from 23.12.2025 to 01.01.2026).
Providing and Fixing on hire basis following LED Flood light fittings complete with all accessories and dismantling as directed by EIC after the programme(for 10 days from 23.12.2025 to 01.01.2026).
Minimum 150 Watt LED Flood fittings.
Minimum 200 Watt LED Flood fittings.
Providing on hire basis PA system including Amplifier(Minimum 500W),horn,microphone etc(for 10 days from 23.12.2025 to 01.01.2026).
Providing on hire basis 5A/15A plug socket complete with necy wiring in 3x 1.5 sqmm single core copper wire and dismantling as directed by EIC after the programme.(for 10 days from 23.12.2025 to 01.01.2026). ) Av. Length of copper wire-02 mtr.)
Providing on hire basis steel tubular pole 10/9 mtr with earthing attachment and dismantling after the programme as directed by EIC(for 10 days from 23.12.2025 to 01.01.2026).
Maintenance, operation & guarding of the above installation round the clock by 2 Numbers Skilled and 2 Numbers Unskilled labour per day Gurading of the above electrical installation with required numbers of man power round the clock(24 Hrs) from the beginning of the installation and upto the dismanting time for proper upkeepment and preventing any unwanted incidents like theft, willful damage etc( no additional charge will be paid for any unwanted incidents) (for 10 days from 23.12.2025 to 01.01.2026).
Providing & Earthing on hire basis with 50 mm dia GI Pipe 2.5 to 3 mtrs. Long and 6/8 SWG GI wire with galvanized nuts and bolts washer etc. below ground level on hire basis and dismantling the same.(for 10 days from 23.12.2025 to 01.01.2026).
Add LWC @1% (on 1.00 to 10.00)
Special Terms and conditions for Temporary E.I. Work - 1) Earthing should conform to IS specification. Earth Continuity wire should not be broken / Jointed. Single Earth continuity wire should be used from Earth Bus-Bar to the installation. 2) All 3ɸ Electrical Panel Should be earthed by two nos. of separate earthing and 1ɸ panel should be earthed by one no earthing. 3) MCB / Rewirable Fuse type Distrubution Board should be installed with proper Trip Current setting / fuse wires. However, MCB type DBs are preferable. 4) No Part of the Electrical Circuit in the pandal / Structure shall be within 12 inches of any decorative cloth / paper. 5) Ordinary Flexible wires should not be used. Only new PVC insulated & sheathed wires (Bearing ISI mark) or PVC insulated wires of FRLS (Fire Resistant Low Smoke) type (ISI Marked) are allowed. 6) All cable ends should be properly sockedted. 7) All joints shall be made with porceline insulated connectors. Twisted & lapped joints shall be avoided. But Joints are strictly not allowed in the dias. 8) Cables / Wires should run along outside the Dias. 9) Ceiling fan (s) / Electrical fittings must not be suspended from the ceiling of Dias. Pedestal fans are not allowed on the Dias. However, Pedestal fans may be installed outside dias, but the body of the fan must be properly earthed.
10) T/L fittings shall be of box type (Indoor commercial type). Any kind of open type fittings must be avoided. 11) Each A.C. Machine should be connected with a separate circuit and earthing should be provided by separate single earth contunuity wire from Earth Bus-bar. 12) P.A. System and Microphone shoud be earthed. 13) Sufficient quantity of Fire Extinguishers and First Aid Box should be provided. 14) If the DGs are not placed at site on time pro rata rate will be reduced from bill. 15) The guarding /security arrangement of all the hired products /installation has to be made by the successful bidder at his/their own cost and responsibility. No additional charge will be paid for any unwanted incidents like theft, damage due to natural calamities or any other reasons whatsoever. 16) During entire hiring period any fault to the hired installation shall be rectified/faulty items replaced, at the cost of agency. Suitable man power for attending and rectification/replacement of damaged items has to be provided by the agency at their own cost. Rectification time is 1 hour for the event day and upto 2hrs for other days. 17) A test certificate cum safety certificate is to be provided by the agency, duly signed by the Supervisor of the agency after completion of installation. 18) A performance guarantee of hired DG sets and AC machines has to be provided by the agency after completion.
BIKASH ENTERPRISE (BID ID -7454928)
S. K. CHATTERJEE ELECTRICALS PVT LTD (BID ID -7482414)
SHREE GANESH ENTERPRISE (BID ID -7504386)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.57 MB
Tendernotice_2.pdf
PDF • 0.52 MB
BOQ_2273162.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid