Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAdmitted-Finance 100 FOOTA ROAD FCI COLONY BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | ₹3.6 L | L1 | Admitted-Finance |
| 2 | L2₹4.5 L+₹89,823 (24.9%)Admitted-Finance | ₹4.5 L+₹89,823 (24.9%) | L2 | Admitted-Finance |
| 3 | L3₹4.5 L+₹90,148 (25.0%)Admitted-Finance | ₹4.5 L+₹90,148 (25.0%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S S Enterprises L1 | M/S PREM ELECTRIC ENGINEERS L2 | MAHI ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Carriage of PCC/ST Pole 9 mtr./11 mtr. And other loose line material from store/other site to site work as per required. | 33 | Nos | 1,100 ₹36,300 | 1,200 ₹39,600 | 950 ₹31,350 Lowest |
| 2.00 | Carriage all type of loose line material from ESC store unnao /sub station store /other site to site as per required and vice versa. | 750 | Kg | 25 ₹18,750 | 10 ₹7,500 Lowest | 10 ₹7,500 Lowest |
| 3.00 | Dismantling of old damaged pole /double pole and X arm ,brackets ,insulators, channels and other hardware fittings. | 30 | Nos | 1,500 ₹45,000 | 1,800 ₹54,000 | 1,400 ₹42,000 Lowest |
| 4.00 | Erection of new PCC/ST single pole include digging of pits and fitting of all accessories . | 30 | Nos | 1,500 ₹45,000 | 1,450 ₹43,500 Lowest | 1,450 ₹43,500 Lowest |
| 5.00 | Erection of PCC /ST double pole structure include digging of pits and fitting of all accessories. | 3 | Nos | 2,250 ₹6,750 Lowest | 3,500 ₹10,500 | 4,500 ₹13,500 |
| 6.00 | Carriage and shifting of old re-usable old pole from site to site and their erection and fitting of all accessories. | 30 | Nos | 1,650 ₹49,500 Lowest | 1,800 ₹54,000 | 1,800 ₹54,000 |
| 7.00 | Replacement of old and damaged ABC from LTOH lines. | 500 | Mtr | 45 ₹22,500 | 40 ₹20,000 | 25 ₹12,500 Lowest |
| 8.00 | Opening and reconnection of consumer connections for shifting or replacement of pole. | 50 | Nos | 50 ₹2,500 Lowest | 50 ₹2,500 Lowest | 300 ₹15,000 |
| 9.00 | Re-Sagging of conductor, on old line after erection/repair of pole, binding of conductor etc. | 75 | Span | 750 ₹56,250 | 850 ₹63,750 | 450 ₹33,750 Lowest |
| 10.00 | Opening of H.T./L.T. Jumpers/Re-jumpering from the exiting H.T.O.H./L.T.O.H. Line for erection work. | 25 | Nos | 40 ₹1,000 Lowest | 150 ₹3,750 | 300 ₹7,500 |
Tender Value
₹4.5 L
EMD Value
₹4,510
Closing Date
24 Apr 2026, 5:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle-Unnao
QUANTUM OF WORK SCHEDULE OF MAINTENANCE AND ATTENDING BRECKDOWN 33/11/0.4 KV LINES OF DIFF 33/11 KV SUB STATION IN THE AREA OF EDSD III BANTHER UNDER THE EDD-MAGARWARA, UNNAO.
2026_MVVNL_1113909_2
127/E.D.C./Unnao/2025-26
Open Tender
Miscellaneous Works
Fixed-rate
180 days
Unnao
as per tender document
2 documents required · 2 mandatory
₹1,180
A/CNo.3355002101008374,IFSCCodePUNB0335500
₹4,510
30 Apr 2026
7 Apr 2026
25 Apr 2026
7 Apr 2026
24 Apr 2026
7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Carriage of PCC/ST Pole 9 mtr./11 mtr. And other loose line material from store/other site to site work as per required. | |||||
| 2Carriage all type of loose line material from ESC store unnao /sub station store /other site to site as per required and vice versa. | |||||
| 3Dismantling of old damaged pole /double pole and X arm ,brackets ,insulators, channels and other hardware fittings. | |||||
| 4Erection of new PCC/ST single pole include digging of pits and fitting of all accessories . | |||||
| 5Erection of PCC /ST double pole structure include digging of pits and fitting of all accessories. | |||||
| 6Carriage and shifting of old re-usable old pole from site to site and their erection and fitting of all accessories. | |||||
| 7Replacement of old and damaged ABC from LTOH lines. | |||||
| 8Opening and reconnection of consumer connections for shifting or replacement of pole. | |||||
| 9Re-Sagging of conductor, on old line after erection/repair of pole, binding of conductor etc. | |||||
| 10Opening of H.T./L.T. Jumpers/Re-jumpering from the exiting H.T.O.H./L.T.O.H. Line for erection work. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_2116979.xls
BOQ • 0.30 MB
doc127.rar
Tender Documents • 1.69 MB
l2026.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .