| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 42 141C KRISHNA KUNJ HALWAI KI BAGHICHI AGRA | AGRA | AGRA | UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical S 6 IIND FLOOR FRIENDS TRADE CENTRE NEHRU NAGAR AGRA | AGRA | UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
Tender Value
₹2.5 Cr
EMD Value
₹14.6 L
Closing Date
7 Oct 2026, 12:00 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Work of construction of 3x7 meter small bridge (box culvert) and approach road on Uttangan River at Km-3 of Danda Kulhara road of CATK road in Agra district
2026_CEAGR_1191788_2
4966/14M-AC/2026-27 dated 10-09-2026
Open Tender
Civil Works - Bridges
Percentage
210 days
Agra
Construction work of Minor Bridge
2 documents required · 2 mandatory
₹2,360
₹14.6 L
Yes
Agra
7 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Eng;neer-in-charge : as per SOR Ch. 17 S. No- 15.9.1 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 190 | Cum | 238 | ₹45,220 |
| - | Demolishing cement concrete manually including disposal of materialwithin 50 metres lead complete as per SOR Ch. 17 S. No- 15.2.1 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 40 | Cum | 741 | ₹29,640 |
| - | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.SI No- 12.1 etc. complete as per SOR Ch. 6 No- 1 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 1,120 | Cum | 76 | ₹85,120 |
| - | Plain Cement Concrete (PCC Grade M15) in Open Foundation complete as per Drawing and Technical Specifications. Clause 1500, 1700 & 2100 SOR Ch. 6 S. etc. complete as per SOR Ch. 6 No- 5 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 150 | Cum | 6,490 | ₹9,73,500 |
| - | Plain Cement Concrete (PCC M20) in sub-structure complete as per Drawing and Technical Specifications. Clause 1500, 1700 & 2100 SOR Ch. 6 S. etc. complete as per SOR Ch. 6 S. No- 12 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 95 | Cum | 7,561 | ₹7,18,295 |
| - | Reinforced Cement Concrete (RCC M-25) in sub-structure complete as per Drawing and Technical Specifications Clause 1500, 1700 & 2100. etc. complete (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 400 | Cum | 7,896 | ₹31,58,400 |
| - | Plain/Reinforced cement concrete (M-30) for wall & slab. etc complete as per drawing and Technical Specification 1500, 1700 & 2100. etc. complete (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 570 | Cum | 9,085 | ₹51,78,450 |
| - | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in sub structure complete as per Drawing and Technical Specifications.Clause 1600 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 90 | MT | 77,900 | ₹70,11,000 |
| - | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Clause 2702 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 17.5 | Cum. | 11,615 | ₹2,03,262.5 |
| - | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical Specifications as per etc. complete as per SOR Ch. 6 S.No. 21 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 168 | No. | 534 | ₹89,712 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_2248717.xls
BOQ • 0.29 MB
T2utangan.pdf
Tender Documents • 4.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .