| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-Finance | L1 | Accepted-Finance L1 bidder | |
| 2 | L2₹3.9 L+₹50,962.12 (15.1%)Accepted-Finance | L2 | Accepted-Finance L2 bidder | |
| 3 | L3₹3.9 L+₹55,544.54 (16.4%)Accepted-Finance NETAJEE ROAD ALIPURDUAR P O ALIPURDUAR PIN 736121 | ALIPURDUAR | ALIPURDUAR | WEST BENGAL | 736121 | L3 | Accepted-Finance L3 bidder | |
| 4 | L4₹4.8 L+₹1.4 L (41.1%)Accepted-Finance | L4 | Accepted-Finance L4 bidder | |
| 5 | L5₹4.9 L+₹1.5 L (43.9%)Accepted-Finance | L5 | Accepted-Finance L5 bidder |
Tender Value
₹4.6 L
EMD Value
₹9,257
Closing Date
17 Jul 2026, 5:00 pmClosed
ASSISTANT ENGINEER, ALIPURDUAR HIGHWAY SUB DIVISIO
OFFICE OF THE ASSISTANT ENGINEER ALIPURDUAR HIGHWAY SUB DIVISION MANNA DEY STREET COLLEGE HALT ALIPURDUAR PIN736 122.
Bituminous repair and other maintenance work to the Rajabhatkhawa-Jaigaon Road Ch. 0.00km. to 8.00km. (In Stretches) under the Alipurduar Highway Division, P.W.(Roads)Dte. in the district of Alipurduar during the year 2026-27.
2026_WBPWD_5016605_1
AHSD/AE/NIT-05(e)/2026-27
Open Tender
CIVIL WORKS
Percentage
Alipurdar
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,257
Yes
23 Jul 2026
11 Jul 2026
20 Jul 2026
11 Jul 2026
17 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying Bituminous Profile Corrective Course using Mobile Hot Mix Plant (Light Duty) and using aggregates of Grading-2 of Table-33 premixed with 75kg of bitumen per cum, transported to site laid over a previously prepared surface at specified laying temperature to the required grade, level and alignment, as per specification to achieve the desired compaction including cost and carriage of stone materials and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of operational staff, quality control complete as per direction of Engineer-in-charge. (Using PAKUR VARIETY) | 9.78 | m3 | 6,911.07 | ₹67,590.26 |
| 2 | Providing, laying and rolling of Open - graded premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²) size stone aggregates, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and fully pre-coating the same either using viscosity grade paving bitumen or cut-back or emulsion, carrying the mixture by any suitable arrangements, laying the mixture uniformly over the surface, including line, grade and level to serve as wearing course on a previously prepared base, including mixing in Mobile Hot Mix Plant (Light Duty) and thoroughly rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades including the cost and carriage of stone chips and matrix, heating the matrix, preheating the aggregates to required temperature and including the hire charges of Mobile Hot Mix Plant (Light Duty) and other machinery, pay of operators, cost of fuel and lubricants etc. complete to be followed by seal coat of either Type A or Type B as per Technical Specification Clause 508 for Rural Roads of MORD. (Using PAKUR VARIETY) | - | m2 | 132.09 | - |
| 3 | B. Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder and aggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). II By Manual Means With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.) (Using PAKUR VARIETY) | 195.5 | m2 | 45.74 | ₹8,942.17 |
| 4 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.) | 586.5 | m2 | 10.15 | ₹5,952.98 |
| 5 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201 for Rural Roads of MORD. (I) By Manual Means a) In area of non-thorny jungle | 1.68 | hec | 44,978 | ₹75,563.04 |
| 6 | Dressing and chilchalling Road flanks including cutting and filling with earth up to 150mm average thickness finished with outward cross-grade of 1 in 30. | 7,400 | m2 | 12.2 | ₹90,280 |
| 7 | Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (iv) For Construction of Sub Base by compacting R.B.M. | 67.5 | m3 | 1,366.59 | ₹92,244.83 |
| 8 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge. I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3m depth (iv) Without pumping out water and shoring | 12.5 | m3 | 114 | ₹1,425 |
| 9 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. | 3.75 | m3 | 829.4 | ₹3,110.25 |
| 10 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 6.25 | m2 | 24 | ₹150 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.19 MB
Tendernotice_2.pdf
PDF • 0.90 MB
BOQ_5086252.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .