Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | ₹2.3 L | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹2.3 LRejected-Finance | ₹2.3 L | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹2.3 LRejected-Finance VILL PO BAHIRI PS BOLPUR DIST BIRBHUM PIN 713240 | BAHIRI | BIRBHUM | WEST BENGAL | 713240 | ₹2.3 L | L3 | Rejected-Finance 3RD LOWEST |
| 4 | L4₹2.3 LRejected-Finance VILL P O BAHIRI PASCHIMPARA P S BOLPUR DIST BIRBHUM PIN 731240 | BOLPUR | BIRBHUM | WEST BENGAL | 731240 | ₹2.3 L | L4 | Rejected-Finance 4TH LOWEST |
| 5 | Rejected-Technical 120 KALIBAZAR WEST LANE 713101 | BURDWAN | PURBA BARDHAMAN | WEST BENGAL | 713101 | - | - | Rejected-Technical As per clause 3.2 C (III) of e-NIT |
Tender Value
₹2.3 L
EMD Value
₹4,567
Closing Date
12 Dec 2025, 2:00 pmClosed
EE-I,DCD
OFFICE OF THE EE-I,DCD
Protection work of approch road at Ch 2660.00 of LBMC (Barsul) for a length of 25.00 mtr at Mouza - Barsul in Block- Bardhaman- II , District - Purba Bardhaman under EE-I Damodar Canal Division (2nd Call).
2025_IWD_951757_5
WBIW/EE-I/DCD/e-NIT-27/2025-26
Open Tender
CIVIL WORKS
30 days
Barsul
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,567
Yes
25 Feb 2026
20 Nov 2025
15 Dec 2025
20 Nov 2025
12 Dec 2025
20 Nov 2025
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed. 15 cm av. Diameter.
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. 15 cm av. Diameter.
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and\ depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Beyond 1.00 km and upto 2.00 km.
Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge. (a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil.
Coal tarring with 5% pitch including cost of material and labour. One Coat.
Supplying at site High Density Polyethylene (HDPE) bag of size 0.84 mx 0.38 m conforming to BIS : 14252 : 2015 for bank protective worksincluding all cost of cost of transportation on road by all means,including other incidental charges complete. Note: Payment will be made subject to the result of 3rd Party Testing,to be done by the Engineer-in-charge departmentally. Paragraphs 2.8including the sub-paragraphs, i.e. 2.8.1 and 2.8.2 under the Chapter of“Specification for Works” in the USoR shall be reproduced and includedin the tender document as “Specification and Special Terms &Conditions for High Density Polyethylene (HDPE) Bags” in case of use of this item in the estimate.”
Labour charges for filling HDPE bags with filler materials (earth/sand), machine stitching the open end of the bag with thread as per design and placing the same on slope or dumping from bank within initial lead of 30m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed by Engineer-in-Charge (Volume of earth/sand filled bag should not be less than 0.0328 cum).
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_2275643.xls
BOQ • 0.29 MB
2911i.pdf
Tender Documents • 3.13 MB
Download all tender documents and submit your bid