| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.0 LAdmitted-Finance | -17.33% | ₹13.0 L | L1 | Admitted-Finance |
| 2 | L2₹13.5 L+₹49,569.16 (3.81%)Admitted-Finance | -14.18% | ₹13.5 L+₹49,569.16 (3.81%) | L2 | Admitted-Finance |
| 3 | L3₹14.0 L+₹95,046.89 (7.31%)Admitted-Finance | -11.29% | ₹14.0 L+₹95,046.89 (7.31%) | L3 | Admitted-Finance |
| 4 | L4₹14.0 L+₹1.0 L (7.80%)Admitted-Finance | -10.88% | ₹14.0 L+₹1.0 L (7.80%) | L4 | Admitted-Finance |
| 5 | L5₹14.9 L+₹1.9 L (14.9%)Admitted-Finance | -5.05% | ₹14.9 L+₹1.9 L (14.9%) | L5 | Admitted-Finance |
Tender Value
₹15.7 L
EMD Value
₹31,472
Closing Date
29 Jun 2026, 4:00 pmClosed
Executive Engineer (R-II)
R-II Division, Tilak Lane, New Delhi
Plaster work, fixing of ceramic glazed tile and painting with epoxy paint, coping and fixing sand stone, Installation of Mud Dredger machine and Pond Water Filter machine in Butterfly Pond, Lodhi Garden
2026_NDMC_293886_1
80/EE(R-II)/2025-26 (199067)
Open Tender
Civil Works
Percentage
60 days
NDMC Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹31,472
10 Jul 2026
19 Jun 2026
29 Jun 2026
19 Jun 2026
29 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete.
On concrete work
(235.15x0.973x1.03)=235.66 | 416.75 | Square Metre | 235.66 | ₹98,211.31 |
| 2 | Dismantling old plaster or skirting raking out joints and cleaning the
surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
(54.65X0.973x1.03)=54.77 | 416.75 | Square Metre | 54.77 | ₹22,825.4 |
| 3 | 12 mm cement plaster of mix : 13.1.1 1:4 (1 cement: 4 fine sand)
(347.05x0973x1.03)=347.81 | 416.75 | Square Metre | 347.81 | ₹1,44,949.82 |
| 4 | Providing and laying rectified Glazed Ceramic floor tiles of size 300x300 mm or more (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick Cement Mortar 1 :4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including pointing the joints with white cement and matching pigments etc., complete.
(1439.40x0973x1.03)=1442.55 | 363.75 | Square Metre | 1,442.55 | ₹5,24,727.56 |
| 5 | 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand), including pointing with cement mortar 1 :2 (1 cement : 2 stone dust) with an admixture of pigment to match the shade of stone. Red sand stone
(1526.05x0.973x1.03)=1529.39 | 162 | Square Metre | 1,529.39 | ₹2,47,761.18 |
| 6 | Extra for fixing sand stone in vertical face of wall or risers using over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand), including pointing with cement mortar 1 :2 (1 cement : 2 stone dust) with an admixture of pigment to match the shade of stone. Red sand stone | 66 | Square Metre | 42.97 | ₹2,836.02 |
| 7 | Providing and laying cement concrete in retaining walls, return walls,
walls (any thickness) including attached pilasters, columns, piers,
abutments, pillars, posts, struts, buttresses, string or lacing courses,
parapets, coping, bed blocks, anchor blocks, plain window sills, fillets,
sunken floor etc., up to floor five level, excluding the cost of centering,
shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
(191.40x0.973*1.03)= 9916.87 | 5.03 | Cubic Metre | 9,916.87 | ₹49,881.86 |
| 8 | Extra for pre finished nosing in sand stone slab. | 420 | Meter | 186.26 | ₹78,229.2 |
| 9 | Providing, installing and commissioning of Kirloskar, crompton or equivalent make electrically driven 3 HP, 3-phase mud pump having a discharge capacity of 18,000–22,000 litres per hour (300–360 LPM) and suitable for a total head of 12–18 metres, including 9 metres of 65mm diameter rigid suction pipe with foot valve/strainer, 30 metres of 75mm diameter cotton delivery pipe, required couplings, and a suitable starter/control panel for safe operation; complete for dredging and removal of accumulated silt/sludge from the bottom of the Butterfly Pond, as per direction of Engineer-in-Charge.” | 1 | Each | 58,127.13 | ₹58,127.13 |
| 10 | Supplying, installation and commissioning of watertech systems or equivalent make FRP bobbin-wound Pond filter of 525 mm diameter, complete with graded sand media and top-mount multiport valve, having a maximum flow rate of 12,000 litres per hour, mounted on heavy-duty trolley, including supplying and fixing 1.5 HP swimming pool circulation pump of 20,000 LPH capacity with required fittings, unions, valves, piping connections and accessories, complete as required and as directed by the Engineer-in-Charge | 1 | Each | 56,896.08 | ₹56,896.08 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_390681.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .