| 1 | L1₹80.3 Cr Creation of New Infrastructure at Roshanpura (Najafgarh) Campus, University of Delhi. SH: Planning, Design and Construction of Academic Block B (Basement GF 8 Floors) at Roshanpura (Najafgarh) Campus, University of Delhi including all civil, E&M, Plumbing, Horticulture and Development works on EPC Mode-1 basis (Design & Build) | Creation of New Infrastructure at Roshanpura (Najafgarh) Campus, University of Delhi. SH: Planning, Design and Construction of Academic Block B (Basement GF 8 Floors) at Roshanpura (Najafgarh) Campus, University of Delhi including all civil, E&M, Plumbing, Horticulture and Development works on EPC Mode-1 basis (Design & Build) | L1 | - | |
| 2 | L2₹81.8 Cr+₹1.5 Cr (1.83%) Creation of New Infrastructure at Roshanpura (Najafgarh) Campus, University of Delhi. SH: Planning, Design and Construction of Academic Block B (Basement GF 8 Floors) at Roshanpura (Najafgarh) Campus, University of Delhi including all civil, E&M, Plumbing, Horticulture and Development works on EPC Mode-1 basis (Design & Build) | Creation of New Infrastructure at Roshanpura (Najafgarh) Campus, University of Delhi. SH: Planning, Design and Construction of Academic Block B (Basement GF 8 Floors) at Roshanpura (Najafgarh) Campus, University of Delhi including all civil, E&M, Plumbing, Horticulture and Development works on EPC Mode-1 basis (Design & Build) | L2 | - | |
| 3 | L3₹83.9 Cr+₹3.6 Cr (4.42%) Creation of New Infrastructure at Roshanpura (Najafgarh) Campus, University of Delhi. SH: Planning, Design and Construction of Academic Block B (Basement GF 8 Floors) at Roshanpura (Najafgarh) Campus, University of Delhi including all civil, E&M, Plumbing, Horticulture and Development works on EPC Mode-1 basis (Design & Build) | Creation of New Infrastructure at Roshanpura (Najafgarh) Campus, University of Delhi. SH: Planning, Design and Construction of Academic Block B (Basement GF 8 Floors) at Roshanpura (Najafgarh) Campus, University of Delhi including all civil, E&M, Plumbing, Horticulture and Development works on EPC Mode-1 basis (Design & Build) | L3 | - | |
| 4 | L4₹84.0 Cr+₹3.7 Cr (4.56%) Creation of New Infrastructure at Roshanpura (Najafgarh) Campus, University of Delhi. SH: Planning, Design and Construction of Academic Block B (Basement GF 8 Floors) at Roshanpura (Najafgarh) Campus, University of Delhi including all civil, E&M, Plumbing, Horticulture and Development works on EPC Mode-1 basis (Design & Build) | Creation of New Infrastructure at Roshanpura (Najafgarh) Campus, University of Delhi. SH: Planning, Design and Construction of Academic Block B (Basement GF 8 Floors) at Roshanpura (Najafgarh) Campus, University of Delhi including all civil, E&M, Plumbing, Horticulture and Development works on EPC Mode-1 basis (Design & Build) | L4 | - | |
| 5 | L5₹84.3 Cr+₹4.0 Cr (4.98%) Creation of New Infrastructure at Roshanpura (Najafgarh) Campus, University of Delhi. SH: Planning, Design and Construction of Academic Block B (Basement GF 8 Floors) at Roshanpura (Najafgarh) Campus, University of Delhi including all civil, E&M, Plumbing, Horticulture and Development works on EPC Mode-1 basis (Design & Build) | Creation of New Infrastructure at Roshanpura (Najafgarh) Campus, University of Delhi. SH: Planning, Design and Construction of Academic Block B (Basement GF 8 Floors) at Roshanpura (Najafgarh) Campus, University of Delhi including all civil, E&M, Plumbing, Horticulture and Development works on EPC Mode-1 basis (Design & Build) | L5 | - |
| Sl No | Description | Qty | Unit | Abhilasha Enterprises L5 | B L INFRA PROJECTS PRIVATE LIMITED L4 | BAHL BUILDERS L9 | CITY PROMOTER & BUILDWELL PVT. LTD. L3 | M I A CONSTRUCTION PRIVATE LIMITED L8 | N.G Constructions L7 | SUBHAM BUILDERS L6 | DND Infra Private Limited L1 | SHC Projects Private Limited L2 | Bansal and Brothers, Panchkula L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Planning, Design and Construction of Academic Block B (Basement + GF + 8 floors) and basement at Roshanpura (Najafgarh) Campus, University of Delhi i/c Civil, Horticulture, Electrical & Mechanical Works (As per Schedule of Qty & Scope of work) for 19260 sqm plinth area | - | - | -30.03 ₹84,04,82,438.8 | -30.31 ₹83,71,19,067.6 | -24.89 ₹90,22,24,324.4 | -30.4 ₹83,60,37,984 | -25.3 ₹89,72,99,388 | -28.75 ₹85,58,57,850 | -29.7 ₹84,44,46,412 | -33.41 ₹79,98,81,743.6 Lowest | -32.13 ₹81,52,57,154.8 | -5 ₹1,14,11,43,800 |
| 1 | Other items (As per Schedule of Qty & Scope of work) | - | - | -30.03 ₹29,17,749 | -30.31 ₹29,06,073 | -24.89 ₹31,32,087 | -30.4 ₹29,02,320 | -25.3 ₹31,14,990 | -5 ₹39,61,500 | -29.7 ₹29,31,510 | -15.41 ₹35,27,403 | -32.13 ₹28,30,179 Lowest | 0 ₹41,70,000 |
Tender Value
₹120.5 Cr
EMD Value
₹1.3 Cr
Closing Date
12 Mar 2024, 3:00 pmClosed
EE&SM( C) -1
Kirti Kakkar
B-313, 3rd Floor, Indraprastha Bhawan, New Delhi - 110002
Creation of New Infrastructure at Roshanpura (Najafgarh) Campus, University of Delhi. SH: Planning, Design and Construction of Academic Block B (Basement GF 8 Floors) at Roshanpura (Najafgarh) Campus, University of Delhi including all civil, E&M, Plumbing, Horticulture and Development works on EPC Mode-1 basis (Design & Build)
68052
09/SE-cum-PD/DPC-1/2023-24
OPEN
Civil Works - Buildings
NCB
27 months
West Delhi, Delhi
23 documents required · 23 mandatory
₹1.3 Cr
Office of SE cum PD DPC 1 CPWD B 315 Indraprastha Bhawan New Delhi 110002
12 Mar 2024
12 Feb 2024
12 Mar 2024
12 Mar 2024
17 Feb 2024
20 Feb 2024
stage.html
html • 0.09 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Part+A+final.pdf
document • 4.26 MB
Part+A+special+condition.pdf
document • 1.43 MB
Part+B+final.pdf
document • 6.77 MB
C-1++General.pdf
document • 0.90 MB
C-2++EI.pdf
document • 1.17 MB
C-3+Substation.pdf
document • 2.09 MB
C-4+HVAC.pdf
document • 1.87 MB
C-5+DG+Set.pdf
document • 0.74 MB
C-6+Fire+Fighting.pdf
document • 1.62 MB
C-7+Fire+Alarm+and+PA+System.pdf
document • 1.43 MB
C-8+UPS+system.pdf
document • 0.68 MB
C-9+Lifts.pdf
document • 0.82 MB
C-10+LAN+and+Wi+Fi.pdf
document • 0.95 MB
C-11+IP+Based+CCTV+and+Access+Control.pdf
document • 1.45 MB
C-12+AV+System.pdf
document • 1.08 MB
C-13+IPBAX+system.pdf
document • 0.83 MB
C-14+IBMS.pdf
document • 1.25 MB
C-15+STP.pdf
document • 1.54 MB
C-16+SOLAR+PV.pdf
document • 0.86 MB
C-17+Water+Distribution+Pump+Set.pdf
document • 0.97 MB
C-18+EV+Charging.pdf
document • 0.79 MB
Part+-+D+Final.pdf
document • 19.38 MB
C N 2 Annexure-1.pdf
document
Pre bid minutes.pdf
document
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .