| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.9 L+₹2,501 (0.17%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical ENCLOSED | |
| 4 | Rejected-Technical | - | Rejected-Technical ENCLOSED |
Tender Value
Refer Docs
EMD Value
₹34,000
Closing Date
6 Feb 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, SNK, AYODHYA
EXECUTIVE ENGINEER, SARYU NAHAR KHAND, AYODHYA
Construction of Syphon at Km.3.100 of Kishunpur Minor (Lot No-17)
2021_UPIDC_549399_17
07/EE/2020-21
Open Tender
Civil Works - Canal
Lump-sum
45 days
BASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹34,000
Yes
22 Jul 2021
28 Jan 2021
6 Feb 2021
28 Jan 2021
6 Feb 2021
28 Jan 2021
90 days
Amount
Dry Earth work in foundation of masonry work on channels of discharge below 10 cumecs including all lead & lift with proper disposal with all cost of labour and T&P etc.
Laying CC 1:3:6 in foundation with 4.75 mm to 40 mm in size stone ballast and coarse including cost of all materials, labour, tools & plants etc.required for proper completion of work.
Laying CC 1:2:4 in foundation with 4.75 mm to 20 mm in size stone ballast and coarse including cost of all materials, labour, tools & plants etc.required for proper completion of work.
Centering & shuttering for R.C.C. work including all cost of labour and T&P etc. required for proper completion of work.
Earth work in back filling with all lead and lift including excavation, loading, unloading, manual compaction and dressing.
Ist class brick work in 1:4 CM Cement and sand mortar including all cost of material, labour and T&P etc. required for proper completion of the work.
Struck Cement Pointing with cement sand mortar 1:2 complete in all respect including all lead, lifts, cost of material, labour and T&P etc.
Making temporary hutment including all cost of labour and T&P etc.
Fixing coller joint (water tissue) with juites and other materials including cost of all material labour T &P etc. required for proper complition of work.
Laying and fixing hume pipe in position including all lead lift with cost of all material T &P etc.
MASTER CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .