Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹18.5 L
EMD Value
₹18,500
Closing Date
19 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO(VP)
Olakkur
Olakkur/AGAMT22-23/15
2022_RDTN_270831_1
Olakkur/AGAMT22-23/15
Open Tender
Civil Works
Works
60 days
Olakkur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹18,500
Yes
19 Dec 2022
7 Dec 2022
19 Dec 2022
7 Dec 2022
19 Dec 2022
7 Dec 2022
Amount
Providing Barbed Wire and Chain Link Fencing, and Water Supply @ OSR Land in Saram Panchayat.
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
RCC 1:1.5:3 mix using 20 mm ISS HBG metal including cost and conveyence of all charges etc ,complete.
Supply of steel for RCC work including bending rods and tying grills and placing in position etc, complete,
Centring charges for all RCC item of work including cost conveyence of all charges etc.,
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying and fixing of approved quality of chain link of size 2''x2'' using 10 gauge galvanised iron wire (all size) for tying in the pattern as per the drawing supplied using 12 gauge GI wire/binding wire etc. complete complying with standard specification and as
Supply and fixing if GI barbed wire of 2 ply 4 pronged of 10 gauge including necessary cutting , tying, bending cost of binding wire etc. complete as per specification etc.complete.
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of Primer paint including cost of all materials and labour charges etc complete
Provision for Main Gate size 3.00x1.50M
Construction of RCC Post
Centring charges for all RCC item of work including cost conveyence of all charges etc.,
Supply of steel for RCC work including bending rods and tying grills and placing in position etc, complete,
RCC 1:1.5:3 mix using 20 mm ISS HBG metal including cost and conveyence of all charges etc ,complete.
Providing Water Supply @ Saram Panchayat.
Cost of Geophysical Investigation Charges
Cost of 165mm dia PVC Casing pipe.
Drilling of borewell anywhere in Tamilnadu including by first taking a pilot bore of 150 mm/200mm direct or reverse rotatry mud and circulation method using rotary rig , fuel, labour, drilling, betonite mud and water required for drilling at the site. etc
Labour charges for inserting PVC casing pipes (with slots or without slots) in the drilled hole including jointing the pipes with PVC couplers with cement pasete etc., complete supply and packing the annular space with pebbles of size & quality as approve
Cost and supply of 1 HP submersible motor (15x90)M
Supply and Delivery of Panel board suitable for above pumpset with all accessories as per IE rules with IE Specifications etc, complete.
Supply and delivery of 2.50sqmm flat type copper cable
Supply and Delivery of HDPE Tank 1000Liters
supply & Delivery of M.S.KISOK
Supply and Deliveryof 15mm Nylon Rope
Supply and Delivery of 32 mm dia HDPE Hose and specials . PN:6
Supply and Delivery of 32 mm dia GI Pipe heavy.
Supply and Delivery of 32 mm dia GI Elbow heavy.
Supply and Delivery of 32 mm dia Flange set with rubber sheets, bolt and nuts.
Supply and Delivery of 32 mm dia GI Gate valves as per specification.
Supply and Delivery of 32 mm dia MS Clamp set with, bolt and nuts.
Supply and Delivery of 150 mm dia borewell cover as per specification.
Supply and Delivery of 7/20 GI Wire as per specification.
Supply and Delivery of 7/20 Copper Cable(Service Wire) as per specification.
Supply and Delivery of 20 mm dia GI Pipe heavy as per specification.
Supply and Delivery of 20 mm dia GI Coupling heavy as per specification.
Supply and Delivery of 20 mm dia GI Elbow heavy as per specification.
Supply and Delivery of 20 mm dia GI Nipple heavy as per specification.
Supply and Delivery of 20 mm dia GI TAP heavy as per specification.
Supply and Delivery of 25 mm dia GI Pipe heavy as per specification.
Supply and Delivery of 25 mm dia GI Elbow heavy as per specification.
Twin earthing as per IE rules including cost of 25 mm GI pipes etc, complete.
Taekwood board for fixing meter and Panal board, (40 x 30 cm)
32 Amps, 440V fuse carrier
15 Amps switch
Arial board ( 20 x 15 cm )
Construction of Pedestal for Kisok per TWAD board type design etc
Construction of Pedestal For HDPE Tank per TWAD board type design etc
Construction of Pedestal For Soack Pit per TWAD board type design etc
Labour charges for Erection of Submersible pump set in deep borewell including connection of submersible pump set with submersible cable and GI pipesand specials with all incidental chares etc, complete.
Provision For EB Connection Charges
Provision for Name Board charges
Provision for Photographic charges
Construction of Drainage & Vertical Filter @ Middle Street in Kilmavilangai Panchayat. In Olakkur Panchayat Union
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Sunshade, etc.)
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Construction of Vertical Soak Pit
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Centring charges for all RCC item of work including cost conveyence of all charges etc.,
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying and fixing of RCC rings 900mm dia for Leach pit including all charges etc complete
Supplying and fixing of cover slab of 900mm dia including all charges etc complete
Supplying and fixing P.V.C rainwater down fall pipe of 110m dia with necessary shoes, bends,& clamps etc.,
Filling the soak pit with 225 mm boulders as per specification
Filling the soak pit with 20mm metal as per specification
Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete.,
Filling the soak pit with 40mm metal as per specification
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and approved colour over a priming coat including through scrapping, clean removal of dirt and including necessary plaster of pairs putty, wherever required etc complete complying with standard specification
Supply of Steel mesh including all charges etc complete
Provision for Name Board charges
Provision for Photographic charges
Construction of Drainage & Vertical Filter @ Nainar Street in Vellimedupettai Panchayat. In Olakkur Panchayat Union
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Sunshade, etc.)
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Construction of Vertical Soak Pit
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Centring charges for all RCC item of work including cost conveyence of all charges etc.,
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying and fixing of RCC rings 900mm dia for Leach pit including all charges etc complete
Supplying and fixing of cover slab of 900mm dia including all charges etc complete
Supplying and fixing P.V.C rainwater down fall pipe of 110m dia with necessary shoes, bends,& clamps etc.,
Filling the soak pit with 225 mm boulders as per specification
Filling the soak pit with 20mm metal as per specification
Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete.,
Filling the soak pit with 40mm metal as per specification
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and approved colour over a priming coat including through scrapping, clean removal of dirt and including necessary plaster of pairs putty, wherever required etc complete complying with standard specification
Supply of Steel mesh including all charges etc complete
Provision for Name Board charges
Provision for Photographic charges
Construction of Drainage & Vertical Filter @ Colony in Pattanam Panchayat. In Olakkur Panchayat Union
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Sunshade, etc.)
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Construction of Vertical Soak Pit
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Centring charges for all RCC item of work including cost conveyence of all charges etc.,
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying and fixing of RCC rings 900mm dia for Leach pit including all charges etc complete
Supplying and fixing of cover slab of 900mm dia including all charges etc complete
Supplying and fixing P.V.C rainwater down fall pipe of 110m dia with necessary shoes, bends,& clamps etc.,
Filling the soak pit with 225 mm boulders as per specification
Filling the soak pit with 20mm metal as per specification
Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete.,
Filling the soak pit with 40mm metal as per specification
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and approved colour over a priming coat including through scrapping, clean removal of dirt and including necessary plaster of pairs putty, wherever required etc complete complying with standard specification
Supply of Steel mesh including all charges etc complete
Provision for Name Board charges
Provision for Photographic charges
Construction of Drainage & Vertical Filter @ Mariyamman Kovil Street in Venmaniyathur Panchayat. In Olakkur Panchayat Union
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Sunshade, etc.)
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Sunshade, etc.)
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Construction of Vertical Soak Pit
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly for Foundation and flooring including labour charges for mixing concrete watering and laying the concrete in layers not more the 115cms thickcompacting etc complete complying with standard specification etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Centring charges for all RCC item of work including cost conveyence of all charges etc.,
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying and fixing of RCC rings 900mm dia for Leach pit including all charges etc complete
Supplying and fixing of cover slab of 900mm dia including all charges etc complete
Supplying and fixing P.V.C rainwater down fall pipe of 110m dia with necessary shoes, bends,& clamps etc.,
Filling the soak pit with 225 mm boulders as per specification
Filling the soak pit with 20mm metal as per specification
Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete.,
Filling the soak pit with 40mm metal as per specification
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and approved colour over a priming coat including through scrapping, clean removal of dirt and including necessary plaster of pairs putty, wherever required etc complete complying with standard specification
Supply of Steel mesh including all charges etc complete
Provision for Name Board charges
Provision for Photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
TDR and Co
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .