Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.5 LAccepted-Finance 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 1 | Accepted-Finance satisfied | |
| 2 | 2₹6.7 L+₹20,751.50 (3.20%)Accepted-Finance | 2 | Accepted-Finance satisfied |
Tender Value
Refer Docs
EMD Value
₹9,100
Closing Date
3 Feb 2022, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I TM I Breakdown Maintenance work in Main Turbine and its Auxiliaries in Unit I to IV during 2021 22 for the period of 120 Days
2022_EB_220188_1
CE/ MTPS-I/ SE / M-I / TM / OT.250 / 2021-22
Open Tender
Power/Energy Projects/Products
Works
120 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹9,100
Yes
5 Feb 2022
20 Jan 2022
4 Feb 2022
20 Jan 2022
3 Feb 2022
20 Jan 2022
Amount
Dismantling, overhauling and assembling of HP & IP control valve columns. Dismantling the control valve columns after loosening the bolts, dismantling its liners, spring assembly liner sliding pin, dismantling the roller bearings, cleaning the above items, inspection of liner key way and measuring the dimension, welding and grinding to the dimension required, greasing the bearing, assembling the dismantled parts and setting the roller clearance as per the direction of engineer in charge.
Dismantling, inspection, and changing of HP & IP control valves: Cutting the spindle leak off lines, heating the cap nut of steam chest by gas, dismantling the control valve assembly from steam chest, cleaning of all parts removal of steam strainer and cleaning spare valve and valve seat lapping and checking blue matching, steam chest flange lapping and blue matching, checking valve stem and liner clearance, valve stem DYE penetrant checking etc., a). Dismantling the control valve assembly from steam chest, cleaning of all parts, removal of steam strainer and cleaning spare valve and valve seat lapping and checking blue matching, Assembling the spare valve with steam chest and tightening the cap nut etc., checking Idle lift connecting the spindle leak off lines and welding as per the direction of the Engineer-in- charge.
b). Drilling the hole in the stem for providing spilt pin, providing the split pin, checking the washer clearance, checking valve lift etc.
Dismantling front pedestal cover, overhauling of main oil pump, intermediate pilot valve, Speed load control assembly, Differentiator, EGPV, turbine trip switch, CVSM feed pack pilot Control pilot & over speed striker. Dismantling of front bearing pedestal top cover, disconnecting the oil pipe lines, dismantling the gear coupling inspection & rectification dismantling of main oil pump, rotor float checking, side and top oil clearance checking. Inspection of impeller, wear ring clearance checking inspection of bearings and doing correction works, replacement of bearings, gear coupling if required. MOP & HP rotor alignment checking and correcting the same and assembling the gear coupling and MOP cover. Dismantling the MOP NRV, lapping and blue matching and assembling, Dismantling, cleaning, inspection and assembling of follow pilot, summation pilot, load/speed control pilot, speeder gear assembly, EGPV, intermediate pilot, differentiator, CVSM feedback pilot etc., Speed governor sleeve to nozzle, EGPV lever to over speed striker to rubber.
Dismantling the bearing cover, checking the bearing interference and assembling after C & I work: Dismantling the bearing cover by loosening the cap nuts, checking the bearing to cover Interference attending correction if any and assembling after cleaning the parting plane and after completion of C & I works.
Checking the hot governing characteristics and adjusting the valve openings as per the instruction of Engineer in-charge including tools and tackles.
INSULATION:a) Removal of insulation from HP/IP control valve, cleaning and disposal of removal insulation including transportation.
b). Re- insulation from HP/IP control valve, painting, claddings aluminum sheet & cleaning.
Removal of LP front & Rear gland steam pipes insulation, reinsulation, Aluminium cladding after fixing of LP front & rear gland steam pipes etc.
Plastering the cement on the insulation of HPCV 1 to 4 and finishing. Cleaning the waste cement from the TG floor and providing the suitable thermal safety appliances for handling the hot spots. Transporting the cement from packet store to work spot.
Dismantling of oil inlet and outlet pipe lines to centrifuge, dismantling of motor, break drum, bowl assembly and pump assembly. Cleaning, inspection, Renewal of damaged spares, bearings, oil seals and assembling, successful commissioning of the Alfa Laval centrifuge.
Cleaning of Oil line, renewal of oil line gaskets and painting etc, in Alfa Laval centrifuge.
Charges for Dismantling of inlet and outlet oil lines connected to oil pumps and heater tank & cleaning etc., in Pennwalt centrifuge.
Charges for dismantling of Suction pump assembly, cleaning all internals, renewal of Bearings, oil seals, oil gaskets and assembling etc., in Pennwalt centrifuge.
Charges for dismantling of discharge pump assembly, cleaning all internals, renewal of Bearings, oil seals, oil gaskets and assembling etc., in Pennwalt centrifuge.
Charges for Dismantling Centrifuge Belt guard, centrifuge Bowl assembly, bottom feed nozzle assembly, idler arm assembly, bearing complete assembly, cleaning, inspection, renewal of bearings, gaskets, bushes and assembling work etc., in Pennwalt centrifuge.
Charges for renewal of existing oil line valves, gaskets and assembling of oil lines etc., in Pennwalt centrifuge.
Turbine Lub Oil Cooler - Attending Tube Puncture Dismantling of top water box, cleaning of all tubes, lifting & hydraulic testing of tube nest, plugging of punctured tubes, cleaning of top and bottom water box, cleaning of all flange seating areas, providing new oil and water gaskets, assembling and tightening of all parts.
Draining of oil from TLOC, shifting oil barrels, top up oil to MOT through centrifuge etc.
Seal Oil Cooler - Attending Tube Puncture Draining of oil from SOC, shifting oil barrels, after attending hydraulic testing of tube nest top up oil to MOT through centrifuge etc..
Attending tube puncture in Seal oil coolers: Dismantling of top water box, brush cleaning of all tubes, hydraulic testing of tube nest, plugging of punctured tubes, cleaning of top and bottom water box, cleaning of all flange seating areas, providing new oil and water gaskets, assembling and tightening of all parts and charging of oil & water side etc.
Inspection and cleaning of ESV/IV Pilot valve includes checking the necessary clearances in the pilots with liners and assembling with renewal of worn-out spares.
Flushing of ESV/IV cooling water hoses and checking leakages if any.
Renewal of LPT diaphragm. Removal of old gasket, cutting new gasket to the existing contour and renewing the new gasket and complete tightening of outer rings.
Inspection of coupling, Bearing and mechanical seal in AC lub Oil/ DC/ AC/DC seal oil pumps. Dismantling of bearing and mechanical seal assembly and renewal if required and assembling.
Consumables and T& P Charges for Item Sl.No: 1 to 25
NELLAI ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_260424.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .