Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.2 LAccepted-AOC | L-1 | Accepted-AOC ok | |
| 2 | L-2₹1.5 L+₹27,502 (22.9%)Rejected-AOC | L-2 | Rejected-AOC ok |
Tender Value
Refer Docs
EMD Value
₹4,900
Closing Date
16 Dec 2022, 12:00 pmClosed
Executive Engineer, W.S. Mech. Division, Rewari
Executive Engineer, W.S. Mech. Division, Rewari
Rewinding of 2 No. 225 HP NGEF make motors installed at Pump No. P-4 (186.029.13) P-5 at Pump House JC-7
2022_HRY_249610_15
3585/6-A dated 07.12.2022
Open Tender
Pumps/Motors
Works
90 days
Executive Engineer, W.S. Mech. Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
₹4,900
Yes
30 Jan 2023
10 Dec 2022
16 Dec 2022
10 Dec 2022
16 Dec 2022
10 Dec 2022
Amount
Providing new copper coil of 16.5 gauge of BIS or any ISI Mark with ‘F’ Class insulation.
Rewinding and commissioning of Electrical Motor Sr. No. 186.029.13 and Motor at P-5 of 225 HP, 740 RPM NGEF make LT Motor, Solid Shaft. The rewinding shall include dismantling. Assembly, Removal of all coils from stator slots de-brazing cleaning / re-inserting fabricated all new copper coils in stator slots by providing Brazing / wedges, varnishing and proper drying.
Credit of old copper scrap (approx).
Terms & Conditions:- 1. The tender rate will be inclusive all taxes as applicable including GST. 2. The tender rate will be for F.O.R. destination and inclusive of all incidental charges, enroute & at destination. Nothing extra shall be paid separately. 3. WWC@1% will be deducted from the each bill of the agency. 4. The rate should be inclusive carriage, fitting and allied parts complete in all respect with left over items (if any) as per site requirement. 5. Goods which to be used / supplied should be as per sample and conforming to the site condition & also conforming to I.S. Specification. 6. Department will not be responsible for non submission of BOQ / Bid Document online by due date, due to any fault of internet/ E-tendering. 7. Completion period – completion period is 3 Months. 8. Warranty must be 18 Months or 2500 Operation hours, whichever is earlier from the date of acceptance. 9. Payment schedule, as per bidding documents. 10. Each page of bid book will be signed by the tenderer as a token of acceptance of terms and conditions. 11. Agencies carrying out the rewind / repair work of motor LT motor. 12. Actual weight of old scrap will be assessed by the committee of 2 SDO’s and will be retain by the agency. 13. During the past two years the bidder should have executed 25% quantity of items of same nature and shall furnish their performance certificate. 14. The bidder must create their contractor ID on HEW portal (http://works.haryana.gov.in) and accordingly upload the contractor profile summary in bidding documents, failing which the bid will be rejected.
R.S. GENRATOR AND SUBMERSIBLE MOTOR WORKS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .