Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.1 CrAccepted-AOC | ₹4.1 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹4.4 Cr+₹34.5 L (8.41%)Rejected-Finance PLOT NO 63 PAHADIYAN DISTRICT VARANASI UTTAR PRADESH | VARANASI | UTTAR PRADESH | 221001 | ₹4.4 Cr+₹34.5 L (8.41%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹4.6 Cr+₹52.7 L (12.8%)Rejected-Finance CHANDAN NAGAR P O RAUJA GHAZIPUR | GHAZIPUR | UTTAR PRADESH | 232325 | ₹4.6 Cr+₹52.7 L (12.8%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹4.7 Cr+₹58.5 L (14.3%)Rejected-Finance 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹4.7 Cr+₹58.5 L (14.3%) | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹5.1 Cr+₹95.8 L (23.4%)Rejected-Finance CHANDAULI | UTTAR PRADESH | 221009 | ₹5.1 Cr+₹95.8 L (23.4%) | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | M/s Mithilesh Kumar L1 | M/S CHAUDHARY ENTERPRISES L4 | S.P.R.U INFRATECH PRIVATE LIMITED L2 | M/S GOPAL RAI L3 | ARVIND KUMAR SINGH L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Earth work in excavation of foundation in all type of soil, soft rock and hard rock etc. including all cost of material labour charges T&P etc.required for proper completion of work. | ||||||||
| 1.01 | Soft rock/soil | 2,012.5 | m3 | 89 ₹1,79,112.5 | 70 ₹1,40,875 | 68 ₹1,36,850 Lowest | 98.56 ₹1,98,352 | 90 ₹1,81,125 |
| 1.02 | Hard rock | 2,559 | m3 | 390 ₹9,98,010 | 250 ₹6,39,750 | 177 ₹4,52,943 Lowest | 435.63 ₹11,14,777.17 | 366 ₹9,36,594 |
| 2.00 | Laying C.C. 1:3:6 (M–10) in foundation with cement, coarse sand FM not less than 2.0 and hard stone ballast of size 20 to 40 mm. including cost of all material, labour, T&P etc. required for proper completion of work. | 282.7 | m3 | 3,670 ₹10,37,509 | 3,500 ₹9,89,450 Lowest | 4,129 ₹11,67,268.3 | 4,096.28 ₹11,58,018.36 | 4,447 ₹12,57,166.9 |
| 3.00 | Centering and shuttering for R.C.C. work including all cost of labour charges, T&P etc. required for proper completion of work. | 3,669.5 | m2 | 670 ₹24,58,565 Lowest | 700 ₹25,68,650 | 890 ₹32,65,855 | 753.66 ₹27,65,555.37 | 900 ₹33,02,550 |
| 4.00 | Centering and shuttering for enclose filter in side of retaining wall including all cost of labour charges, T&P etc. required for proper completion of work. | 2,625 | m2 | 52 ₹1,36,500 Lowest | 60 ₹1,57,500 | 68 ₹1,78,500 | 57.97 ₹1,52,171.25 | 65 ₹1,70,625 |
| 5.00 | Providing and laying M-20 (1:1.5:3) for R.C.C work with cement, coarse sand FM not less than 2.0 and stone grit of size 4.75mm to 20mm by Mechanical mixing, compaction by vibrator with all materials, labour, T&P etc. required for proper completion of work. | 2,295.7 | M3 | 5,349 ₹1,22,79,699.3 Lowest | 6,700 ₹1,53,81,190 | 6,800 ₹1,56,10,760 | 5,954.68 ₹1,36,70,158.88 | 6,990 ₹1,60,46,943 |
| 6.00 | Cutting, Bending, Binding and placing of reinforcement including all cost of material ,labour charges T&P etc. required for proper completion of work. | 180.2 | MT | 57,800 ₹1,04,15,560 Lowest | 77,585 ₹1,39,80,817 | 77,205 ₹1,39,12,341 | 64,256.6 ₹1,15,79,039.32 | 78,019 ₹1,40,59,023.8 |
| 7.00 | S/L P.V.C. Pipe in weep hole 50 mm Ø including cutting, placing, all cost of labour charges T&P etc. required for proper completion of work. @2.50 m c/c | 84 | RM | 85 ₹7,140 Lowest | 100 ₹8,400 | 110 ₹9,240 | 95.24 ₹8,000.16 | 99 ₹8,316 |
| 8.00 | Laying and fixing joint filler board/coir soaked with bitumen in seal gap 18 mm thick including cutting, placing, all cost of material, labour charges T&P etc. required for proper completion of work. | 167.8 | m2 | 825 ₹1,38,435 Lowest | 1,000 ₹1,67,800 | 1,100 ₹1,84,580 | 923.44 ₹1,54,953.23 | 1,000 ₹1,67,800 |
Tender Value
Refer Docs
EMD Value
₹11.2 L
Closing Date
4 Sept 2025, 2:00 pmClosed
Superintending Engineer, B S C C C-2 Mzp
Superintending Engineer, Bansagar Canal Construction Circle-2 Mirzapur
Construction of Canal protection work between km-10.400 to 10.950 of B.S.F.C.
2025_UPIDC_1067268_2
03/SE/2025-26
Open Tender
Civil Works
Item Rate
240 days
Sidhi, MP
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹11.2 L
29 Oct 2025
23 Aug 2025
4 Sept 2025
23 Aug 2025
4 Sept 2025
25 Aug 2025
Amount
Earth work in excavation of foundation in all type of soil, soft rock and hard rock etc. including all cost of material labour charges T&P etc.required for proper completion of work.
Soft rock/soil
Hard rock
Laying C.C. 1:3:6 (M–10) in foundation with cement, coarse sand FM not less than 2.0 and hard stone ballast of size 20 to 40 mm. including cost of all material, labour, T&P etc. required for proper completion of work.
Centering and shuttering for R.C.C. work including all cost of labour charges, T&P etc. required for proper completion of work.
Centering and shuttering for enclose filter in side of retaining wall including all cost of labour charges, T&P etc. required for proper completion of work.
Providing and laying M-20 (1:1.5:3) for R.C.C work with cement, coarse sand FM not less than 2.0 and stone grit of size 4.75mm to 20mm by Mechanical mixing, compaction by vibrator with all materials, labour, T&P etc. required for proper completion of work.
Cutting, Bending, Binding and placing of reinforcement including all cost of material ,labour charges T&P etc. required for proper completion of work.
S/L P.V.C. Pipe in weep hole 50 mm Ø including cutting, placing, all cost of labour charges T&P etc. required for proper completion of work. @2.50 m c/c
Laying and fixing joint filler board/coir soaked with bitumen in seal gap 18 mm thick including cutting, placing, all cost of material, labour charges T&P etc. required for proper completion of work.
Providing and laying coarse sand in filter including cost of all material labours and T&P etc.required for proper completion of work.
Providing and laying graded filter Stone grit 4.75 to 20 mm. including cost of all material labour and T&P etc. required for proper completion of work.
Providing and laying graded filter Stone ballast 20 to 40 mm. including cost of all material labour and T&P etc. required for proper completion of work.
Earth work in filling earth in R/S slope of canal section with proper compaction by slope compactor roller. including all cost of material, labour charges T&P etc.required for proper completion of work.
Carriage and Laying stone(weight not less than 40 kg.)for pitching in R/S slope of canal including all cost of material labour charges T&P etc.required for proper completion of work. u/s in Retaining wall
S.P.R.U INFRATECH PRIVATE LIMITED (BID ID -5515206)
M/S GOPAL RAI (BID ID -5516242)
M/S CHAUDHARY ENTERPRISES (BID ID -5512596)
ARVIND KUMAR SINGH (BID ID -5516871)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_1946406.xls
BOQ • 0.30 MB
Tenderdocument_Lot_2.pdf
Tender Documents • 2.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .