| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.5 LAccepted-AOC | ₹46.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹47.0 LRejected-AOC | ₹47.0 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | P. GOVINDHARAJ L2 | SIVARAJ CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Construction of 100000 litres capacity OHT at Anandha Nagar H/o.Peddathalapalli Estimate Amount : Rs.47.100 Lakhs | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 150.89 | Cum | 266.5 ₹40,212.19 | 263.7 ₹39,789.69 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 10 | Cum | 1,707.19 ₹17,071.90 | 1,689.28 ₹16,892.80 |
| 4.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 13.33 | Cum | 5,335.55 ₹71,122.88 | 5,279.57 ₹70,376.67 |
| 5.00Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | |||||
| 6.00 | A) Below 1.5m from GL | 19.91 | Cum | 9,095.58 ₹1.8 L | 9,000.15 ₹1.8 L |
| 7.00 | B) 0m to 1.50m below GL | 2.95 | Cum | 9,235.78 ₹27,245.55 | 9,138.88 ₹26,959.70 |
| 8.00 | c) 0m to 1.00m above GL | 7.84 | Cum | 9,238.1 ₹72,426.70 | 9,141.18 ₹71,666.85 |
| 9.00 | E) 4.50 m to 7.32 m above GL | 5.8 | Cum | 9,518.85 ₹55,209.33 | 9,418.98 ₹54,630.08 |
| 10.00 | F)7.32 m to 10.98 m above GL | 4.85 | Cum | 9,799.61 ₹47,528.11 | 9,696.79 ₹47,029.43 |
Tender Value
₹47.1 L
EMD Value
₹48,000
Closing Date
19 Feb 2026, 3:00 pmClosed
Block Developement officer
Block Developement office, Krishnagiri
Krishnagiri District Krishnagiri Block NABARD(GF) 2025-26 Construction of 100000 litres capacity OHT at Anandha Nagar in Peddathalapalli Pt Pkg No 2025-26 KGI 39
2026_RDTN_658851_1
Roc_No_4455_25_A2_Dt_27_11_25
Open Tender
Civil Works
180 days
Krishnagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹48,000
Block Developement office, Krishnagiri
2 Mar 2026
16 Feb 2026
19 Feb 2026
16 Feb 2026
19 Feb 2026
16 Feb 2026
17 Feb 2026
Construction of 100000 litres capacity OHT at Anandha Nagar H/o.Peddathalapalli Estimate Amount : Rs.47.100 Lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
A) Below 1.5m from GL
B) 0m to 1.50m below GL
c) 0m to 1.00m above GL
E) 4.50 m to 7.32 m above GL
F)7.32 m to 10.98 m above GL
G) 10.98 m to 14.64 m above GL
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
I) Plane Surface
B) From GL to 3.30m
C) From 3.31m to 4.30m
E)From 6.31m to 7.30m
F) From 7.31m to 8.30m
G) From 10.31m to 11.30m
H)From 11.31m to 12.30m
II) Square Column:
A)Square Column Below GL and upto 3.30m above GL
B)3.31m to 4.30m ht
C)4.31m to 5.30m ht
D)5.31m to 6.30m ht
E)6.31m to 7.30m ht
F)7.31m to 8.30m ht
G) 8.31m to 9.30m ht
H)9.31m to 10.30m ht
I) 10.31m to 10.90m ht
III) Circular Surface
A) Curved Surface - upto 3.30m ht.
B) Curved Surface - 3.30m to 4.30m ht.
C) 4.30m to 5.30m ht.
D) 5.3m to 6.30m ht.
E) 6.31m to 7.30m ht.
E) 7.31 to 8.30m ht.
F) 8.31m to 9.30m ht.
G) 9.31m to 10.30m ht.
H) 10.31m to 10.90m ht.
IV) Curved Surface
A) upto 3.30m ht.
B) 10.31 to 11.30m ht.
C) 11.31m to 12.30m ht.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Providing outside M.S Ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps fixed at 30 cm centre to centre etc.and providing of Landing slabs with hand rails using 32mm GI pipe and 40mmx6mm MS flat etc. as per approved design
Providing Hand rails over the Roof slab by using 32 mm GI Pipe with 40mm x 6mm MS Flat and fixed with 12mm dia Fastner Bolt 75mm long and as directed by Departmental officers
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (One cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc.
Provision for PVC Ventilating arrangements mosquito proof nylon net with 110mm PVC pipes and cowl as directed by departmental officers 2nos etc., all complete
Providing cut stone slab in CM 1:3 of size 0.3 m x 0.3 m x 0.15 m and as directed by Departmental officers
Supplying and fixing in position CI manhole covers with CI frames (Heavy duty) of size 60cm x 60cm of best approved quality as per standard specification etc., complete compying with standard specifications
Provision for pipe connection arrangements for inlet, outlet scour and overflow etc. including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint
For Inlet Arrangements
80mm GI Pipes
80mm GI Coupling
80mm GI Bend
80mm GI Flange Set
80mm GM Gate Valve
90mmx80mm PVC Threaded Coupler
For Outlet Arrangements
80mm GI Pipes
80mm GI Coupling
80mm GI Bend
80mm GI Flange Set
80mm GM Gate Valve
65mm GM Gate Valve
90mmx80mm PVC Threaded Coupler
90mm x 63mm PVC Reducer
For Source Arrangemets
80mm GI Pipes
80mm GI Coupling
80mm GI Bend
80mm GI Flange Set
80mm GM Gate Valve
90mmx80mm PVC Threaded Coupler
For Overflow Arrangements
80mm GI Pipes
80mm GI Coupling
80mm GI Bend
80mm GI Flange Set
90mmx80mm PVC Threaded Coupler
Rubber Sheet
Bolt and NutsWM0590
Labour Charges
80mm GI Pipe - Cutting
80mm GI Pipe - Threading
Refilling the foundation with excavated earth including consolidation as directed by the Departmental officers
Provision for Soak pit as per sub estimate
Earthwork excavation and depositing on bank with initital lead of 10 m and lift of 2.00 m iin Hard stiff clay, stiff black cotton soil Hard red earth shales, murrams and earth mixed with small size in various classification of soil cofirm to SS.20B refilling of excaveted the earth etc. complete.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work in Cement mortar 1:5 mix using country brick of size 22 x 11 x 7 cm including cost and conveyance and all labour charges etc.,
Supply and filling of 40 mm HBG metal (Jelly ) including cost and conveyance and all labour charges etc., complete
Supply and filling of Sand as per specification including cost and conveyance and all labour charges etc., complete
Plastering with CM 1:5 mix to 12 mm thick including cost and conveyance and all labour charges etc.,
Provsion for Name Board
Provision for fencing arrangements
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and labour chagres for mixing, laying, cmpacting and curing etc., complete.
CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and labour chagres for mixing, laying, cmpacting and curing etc., complete.
Supply and erection of centering for sides and soffits including all labour charge
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supply & fixing of CHAIN LINK 2"X2" USING GAUGE Galvanised Iron wire (of all sizes)all cost and conveyance etc., all complete M0408
Provision for Grill Gate including all cost and all labour charges Fabricating supplying and Erecting in position mild steel angle iron trusses /MS channels including all cost and conveyance of men and materials, complete complying with standard specification
Provision for Chlorinator as per sub estimate
90mm dia PVC pipe
63mm dia PVC pipe
32mm dia PVC pipe
63 x20mm PVC saddle
90 x63mm PVC reducer coupler
63mm x 50mm PVC reducer coupler
PVC gate valve 90mm dia
PVC gate valve 63mm dia
32mm PVC Elbow
32mm PVC End cap
90mm PVC End cap
Cost of brackets for PVC pipes
Labour charges for fixing the PVC pipes and specials including all charges
Provision for Pumping pipe line
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete
75mm HDPE pipe
Towards Labour charges of laying and jointing including all cost and conveyance etc., all complete
75mm HDPE pipe
Provision for Distribution pipe line
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete
63mm HDPE pipe
Towards Labour charges of laying and jointing including all cost and conveyance etc., all complete
63mm HDPE pipe
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
tb39.pdf
Tender Documents • 1.27 MB
pb39.pdf
Tender Documents • 0.63 MB
BOQ_790444.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid