Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹1 L
Closing Date
13 Jul 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
C/O P BUND NHO GH QADIR DAR AND OTHERS WARD 2 PYT SUNDBRARI A BLOCK BRENG
2022_RDPR_176598_7
ENIT97of2022-23
Open Tender
Civil Works
Item Rate
30 days
anantnag
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
Exempted
14 Jul 2022
28 Jun 2022
14 Jul 2022
28 Jun 2022
13 Jul 2022
28 Jun 2022
Amount
Site clearance by removing of unhygenic material, dismantling of existing damaged concrete edges by engagement of labours
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
Providing, supplying laying and filling including hand packing in foundation and plinth dry stone soling with all leads , lifts carriages from dumping site to source of work lead 5 Km complete.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
placing and laying of plum concrete
Centering and shuttering including strutting, propping etc. and removal of form for: abuts Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
carriage of materials from source upto site of work sand bajri stones from an average lead of 40Kms by MT
carriage of materials from source upto site of work sand and stones from an average lead of 250m by H/L
carriage of materials from source upto site of work sand bajri from an average lead of 250m by H/L
Provision for signboard, plastering photographs and other unforeseen items(STA)
TARIQ AHMAD KHAN
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .