| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹123.6 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹130.4 Cr+₹6.8 Cr (5.46%)Admitted-Finance 1ST FLOOR KRISHNA TOWERS OPP TO THRIKKAKARA TEMPLE THRIKKAKARA P O COCHIN 682 021 | ERNAKULAM | KERALA | 682021 | L2 | Admitted-Finance | |
| 3 | L3₹144.1 Cr+₹20.4 Cr (16.5%)Admitted-Finance 5TH FLOOR KANKARIA CENTRE 2 1 RUSSEL STREET RUSSEL STREET KOLKATA WEST BENGAL 700071 | KOLKATA | WEST BENGAL | 700071 | L3 | Admitted-Finance | |
| 4 | L4₹150.4 Cr+₹26.7 Cr (21.6%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹176.6 Cr+₹53.0 Cr (42.9%)Admitted-Finance 47 DESHABANDHU PLAZA WHITES ROAD ROYAPETTAH CHENNAI TAMIL NADU 600014 INDIA | CHENNAI | TAMIL NADU | 600014 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Thermosystems Pvt. Ltd. L1 | NRP PROJECTS PRIVATE LIMITED L5 | Bridge and Roof Co India Ltd L3 | Sharp Tanks and Structurals Pvt Ltd L4 | Sterling and Wilson Private Limited L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00(PART-A) | ||||||||
| 2.00SUPPLY OF PIPING ITEMS: | ||||||||
| 3.00FOR U/G PIPING: | ||||||||
| 3.10"Supply , taking over" as defined in the specifications, handling, loading/unloading, transportation, unloading and Laying of bare/coated line pipes and other materials like valve, fittings, flanges & TPI inspection etc. from Contractors suppliers locations/works etc. to Contractor's stock yard/workshop/work-site including preliminary activities, preparation of drawings, wherever required for crossing etc. Handling, stacking, stringing of the UG pipes, Carrying out inspection of materials including line pipes at the time of laying/ installation of line pipes, associated valves, tees, insulating joints, flanges & fittings for buried application of all sizes, thickness & ANSI class rating and accessories as per specification wherever required depending on site condition.Arrangement of all additional lands required for Contractor's storage, fabrication, access for construction, etc. procurement and supply of all materials, consumables, equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works, etc. | ||||||||
| 4.00FOR A/G PIPING: | ||||||||
| 4.10Complete works for Supply of pipes, flanges, fittings & Valves for aboveground installation including all taxes, duties, transportation and inspection charges & TPI inspection, but not limited to, the following items in accordance with PMS (piping material specification), relevant specifications & drawings indicated in job specification and instructions of Owner/Consultant and as per all provisions of the CONTRACT. Supply of all piping items inclusive of spares (For details refer PDIL-MTO as well as SOR). Supply & Transportation of all piping materials from storage point to work site/shop including from shop to work site, cleaning, stacking, prefabrication / fabrication at shop. In case of IBR piping, material identification, drawing approval, hydro-test witness and final approval of fabricated piping by IBR authorities for taking the same in use, shall also be included in the quoted rate. | ||||||||
| 5.00SUPPLY OF PIPING ITEMS | ||||||||
| 5.11 | PIPE SCH 80, PE ,0.5",SMLS,API 5L GR.B,ASME B36.10 | 2,046 | MTR. | 335 ₹6,85,410 Lowest | 871 ₹17,82,066 | 393 ₹8,04,078 | 386.69 ₹7,91,167.74 | 413 ₹8,44,998 |
| 5.12 | PIPE SCHXXS, BE IBR,0.75",SMLS,ASTM A335 GR.P22,ASME B36.10 | 30 | MTR. | 3,546 ₹1,06,380 | 2,442 ₹73,260 | 1,041 ₹31,230 Lowest | 1,957.34 ₹58,720.2 | 1,852 ₹55,560 |
| 5.13 | PIPE SCH160, PE IBR,0.75",SMLS,ASTM A106 GR.B,ASME B36.10 | 174 | MTR. | 628 ₹1,09,272 Lowest | 865 ₹1,50,510 | 669 ₹1,16,406 | 675.24 ₹1,17,491.76 | 700 ₹1,21,800 |
Tender Value
Refer Docs
EMD Value
₹1.1 Cr
Closing Date
22 May 2023, 3:00 pmClosed
PROJECT MANAGER
AS PER NIT
COMPOSITE SUPPLY CUM ERECTION OF MECHANICAL PIPING WORKS FOR TALCHER FERTILIZER
2023_PDIL_746882_1
PNPM/PC-183/E-601/NCB
Open Tender
Pipes and Pipe related activities
Item Rate
420 days
TALCHER
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.1 Cr
PDIL NOIDA
19 Sept 2023
27 Mar 2023
23 May 2023
27 Mar 2023
22 May 2023
9 May 2023
6 Apr 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1(PART-A) | |||||
| 2SUPPLY OF PIPING ITEMS: | |||||
| 3FOR U/G PIPING: | |||||
| 3.1 | "Supply , taking over" as defined in the specifications, handling, loading/unloading, transportation, unloading and Laying of bare/coated line pipes and other materials like valve, fittings, flanges & TPI inspection etc. from Contractors suppliers locations/works etc. to Contractor's stock yard/workshop/work-site including preliminary activities, preparation of drawings, wherever required for crossing etc. Handling, stacking, stringing of the UG pipes, Carrying out inspection of materials including line pipes at the time of laying/ installation of line pipes, associated valves, tees, insulating joints, flanges & fittings for buried application of all sizes, thickness & ANSI class rating and accessories as per specification wherever required depending on site condition.Arrangement of all additional lands required for Contractor's storage, fabrication, access for construction, etc. procurement and supply of all materials, consumables, equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works, etc. | - | - | - | - |
| 4FOR A/G PIPING: | |||||
| 4.1 | Complete works for Supply of pipes, flanges, fittings & Valves for aboveground installation including all taxes, duties, transportation and inspection charges & TPI inspection, but not limited to, the following items in accordance with PMS (piping material specification), relevant specifications & drawings indicated in job specification and instructions of Owner/Consultant and as per all provisions of the CONTRACT. Supply of all piping items inclusive of spares (For details refer PDIL-MTO as well as SOR).
Supply & Transportation of all piping materials from storage point to work site/shop including from shop to work site, cleaning, stacking, prefabrication / fabrication at shop. In case of IBR piping, material identification, drawing approval, hydro-test witness and final approval of fabricated piping by IBR authorities for taking the same in use, shall also be included in the quoted rate. | - | - | - | - |
| 5SUPPLY OF PIPING ITEMS | |||||
| 5.11 | PIPE SCH 80, PE ,0.5",SMLS,API 5L GR.B,ASME B36.10 | 2,046 | MTR. | 107 | ₹2,18,922 |
| 5.12 | PIPE SCHXXS, BE IBR,0.75",SMLS,ASTM A335 GR.P22,ASME B36.10 | 30 | MTR. | 108 | ₹3,240 |
| 5.13 | PIPE SCH160, PE IBR,0.75",SMLS,ASTM A106 GR.B,ASME B36.10 | 174 | MTR. | 109 | ₹18,966 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_785287.xls
BOQ Document • 0.71 MB
117759854.pdf
Tender Document • 23.49 MB
117759856.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .