Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.0 LAdmitted-Finance | -6.00% | ₹8.0 L | L1 | Admitted-Finance |
| 2 | L2₹8.1 L+₹8,762.25 (1.10%)Admitted-Finance | -4.97% | ₹8.1 L+₹8,762.25 (1.10%) | L2 | Admitted-Finance |
| 3 | L3₹8.3 L+₹34,028.16 (4.26%)Admitted-Finance 125 MOHALLA HARLAL PURA SARDHANA MEERUT UTTAR PRADESH 250342 | MEERUT | UTTAR PRADESH | 250342 | -2.00% | ₹8.3 L+₹34,028.16 (4.26%) | L3 | Admitted-Finance |
| 4 | L4₹8.5 L+₹55,295.76 (6.91%)Admitted-Finance | +0.50% | ₹8.5 L+₹55,295.76 (6.91%) | L4 | Admitted-Finance |
Tender Value
₹8.5 L
EMD Value
₹85,070
Closing Date
8 Jul 2026, 1:00 pmClosed
executive officer
Nagar palika palika parishad sardhana
WARD 17 DUMPING GROUND KE KONE SE TOWN HALL ROAD TAK RCC SLAB SE NALE KA COVERD KARNEY KA WORK
2026_DOLBU_1160845_1
410(27)/11.06.2026
Open Tender
Civil Works
Percentage
30 days
Nagar palika palika parishad sardhana
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,254
Account No 408005000104 IFSC Code ICIC0004080
₹85,070
1 Sept 2026
16 Jun 2026
8 Jul 2026
16 Jun 2026
8 Jul 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | RCC SLAB | - | - | - | - |
| 2 | M-150 brick work in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work as per analysis | 32.98 | cum | 6,601 | ₹2,17,700.98 |
| 3 | 12mm thick Plaster in 1:4with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(asper analysis) drain wall | 138.21 | sqm | 181 | ₹25,016.01 |
| 4 | cement Concrete in 1:6:12 with cement,fine sand and brick ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work(Chpt-5/273) drain base | 1 | cum | 2,930 | ₹2,930 |
| 5 | Laying of C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc required for proper completion of work (Chpt-5/279a) drain cc | 1 | cum | 5,650 | ₹5,650 |
| 6 | RCC work in 1:1:5:3 with cement coarse sand and stone grit of 2cm gauge in raft and wall ic supply of all material labour and t7p etc including all complete of work | 33.6 | cum | 7,300 | ₹2,45,280 |
| 7 | mild steel or iron work such as reinforced including supply of all material labour and t&p etc required for proper completion of work | 31.65 | qtl | 7,088 | ₹2,24,335.2 |
| 8 | gst | 1 | nos | 1,29,791.81 | ₹1,29,791.81 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.07 MB
ulbt27.pdf
Tender Documents • 1.31 MB
BOQ_2175627.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .