| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹27.7 L (21.3%)Admitted-Finance JHARIA BENIGANJ HARDOI | BENIGANJ | HARDOI | UTTAR PRADESH | ₹1.6 Cr+₹27.7 L (21.3%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 Cr+₹51.3 L (39.5%)Admitted-Finance | ₹1.8 Cr+₹51.3 L (39.5%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technical bid mismatch |
| Sl No | Description | Qty | Unit | M/S SHUKLA ENTERPRISES L3 | M/s Anil kumar singh L2 | NATIONAL CONTRACTOR & GENERAL ORDER SUPPLIER L1 |
|---|---|---|---|---|---|---|
| 1.00Part-A- Providing following materials by the Contractor. | ||||||
| 1.01 | 33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor | 92 | Nos. | 20,500 ₹18,86,000 | 18,200 ₹16,74,400 | 10,000 ₹9,20,000 Lowest |
| 1.02 | 33 KV ‘XLPE’ C/J Kit 3x300mm² Straight Through | 4 | No | 40,200 ₹1,60,800 | 39,100 ₹1,56,400 | 20,000 ₹80,000 Lowest |
| 1.03 | Top channel with clamp | 23 | No. | 2,650 ₹60,950 | 2,450 ₹56,350 Lowest | 4,000 ₹92,000 |
| 1.04 | M.S. Angle Iron 65x65x6mm bracing with clamps. | 21 | Set | 3,740 ₹78,540 | 3,600 ₹75,600 Lowest | 4,000 ₹84,000 |
| 1.05 | extra support angle for cable support | 63 | No. | 1,680 ₹1,05,840 | 1,550 ₹97,650 | 1,000 ₹63,000 Lowest |
| 1.06 | clamp for extra angle | 126 | No. | 550 ₹69,300 | 450 ₹56,700 | 300 ₹37,800 Lowest |
| 1.07 | Number Plate with clamps. | 21 | No. | 320 ₹6,720 | 290 ₹6,090 | 50 ₹1,050 Lowest |
| 1.08 | Danger Board with Clamps. | 21 | No. | 390 ₹8,190 | 290 ₹6,090 | 100 ₹2,100 Lowest |
| 1.09 | Barbed wire. | 42 | Kg | 170 ₹7,140 | 140 ₹5,880 | 100 ₹4,200 Lowest |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
19 Sept 2023, 4:00 pmClosed
SE EWC Gorakhpur
Mohaddipur Gorakhpur
Construction of 33 KV Line from Khorabar to Taramandal Gorakhpur
2023_PVVNV_837353_1
15/EWC(G)/2023-24
Open Tender
Electrical Works
Item Rate
45 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
SE EWC Gorakhpur
₹1.6 L
10 Oct 2023
12 Sept 2023
20 Sept 2023
12 Sept 2023
19 Sept 2023
13 Sept 2023
Amount
Part-A- Providing following materials by the Contractor.
33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor
33 KV ‘XLPE’ C/J Kit 3x300mm² Straight Through
Top channel with clamp
M.S. Angle Iron 65x65x6mm bracing with clamps.
extra support angle for cable support
clamp for extra angle
Number Plate with clamps.
Danger Board with Clamps.
Barbed wire.
Allumunium Paint.
Bolts, Nuts, & Washers.
Red Oxide Paint.
Stay complete. (With Stay clamp and stay wire)
Earthing rod
Top channel with clamp
M.S. Angle Iron 65x65x6mm bracing with clamps.
extra support angle for cable support
clamp for extra angle
Number Plate with clamps.
Danger Board with Clamps.
Barbed wire.
Special GI Pipe for cable earthing
Part-B Work Shifting, Loading Carriage & Unloading of following materials from store centre Gorakhpur to work site
Petty Stock Materials.
33 KV Line Isolator
33 KV Line Isolator Structure
3x300 Sq mm XLPE Cable 33 KV
ST Pole 9 m Long
Laying of 33 KV 3x300 mm² ‘XLPE’ cable(D/C) by digging pit & making trench in Proper size (1.2M depth x1.2M wide) below ground level by fixing bricks(4½˝) on both side of trench wall and 9˝ brick work at the centre of the trench along the cable. Fixing brick slab on top after filling sand around both the cable including cost of bricks and sand. as per site requirement HDD mathod can be used.
Extra cost for drilling horizontal hole 3 Mtr below the road & inserting 6” dia. HDPE Pipe PN-8 as per RESSPO for passing of 33 KV XLPE cable 3x300 mm². (Pipe and related materials provided by contractor)
Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Outdoor/Straight Through
Laying of 33 KV ‘XLPE’ cable in air after providing 6” dia.M.S. pipe 3m long Complete work.
Labour charges for inserting of MS Pipe, Rising of 33 KV cable and jumpering complete work
Special Pipe earthing for 33 KV Jointing Kit.
There will be possible of breaking of various type of water supply pipe while laying of U/G cable, for which the repair will be charged. (Include complete materials and work)
Erection of Double pole structure on 11 mtr ST Pole for only Cable rising including all works of evocation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete) .
Grouting of stay rods (20 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing.
Erection of Line Isolator Structure and install Line Isolator and earthing complete work.
M/s Anil kumar singh
M/S SHUKLA ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .