Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC | ₹7.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.6 LRejected-Finance | ₹7.6 L | L2 | Rejected-Finance l2 |
| Sl No | Description | Qty | Unit | Navaneethakrishnan L1 | Thangaraj S L2 |
|---|---|---|---|---|---|
| 1.00Construction of Pipe Causeway at Bunglow kudiiruppu Burial Ground road in Melambur Panchayat ,Kadayam Panchayat Union Under Panchayat Union General Fund - 2025 - 2026 | |||||
| 2.00 | Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete. | 31.68 | cum | 263 ₹8,331.84 | 270 ₹8,553.60 |
| 3.00 | Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete. | 17.33 | cum | 5,445 ₹94,361.85 | 5,450 ₹94,448.50 |
| 4.00 | Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete. | 98.8 | sqm | 547 ₹54,043.60 | 550 ₹54,340 |
| 5.00 | Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 54.78 | cum | 5,716 ₹3.1 L | 5,750 ₹3.1 L |
| 6.00 | Cement concrete 1:3:6 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 6 | cum | 6,197 ₹37,182 | 6,200 ₹37,200 |
| 7.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 4.13 | cum | 6,738 ₹27,827.94 | 6,750 ₹27,877.50 |
| 8.00 | Supply and delivery of 1000mm dia NP3 Class RCC Pipe including all cost and conveyance and all labour charges etc, Complete complying with standard specification. | 20 | Rm | 4,576 ₹91,520 | 4,600 ₹92,000 |
| 9.00 | Supply of fixing of Guard Stone (Top 0.7 m chisel dressed and 0.50m bottom roughly dressed) 0.23 x 0.23 x 1.20m long. (Two line dressed top 45cm) 23cm dia 1.0m long | 22 | Nos | 206 ₹4,532 | 210 ₹4,620 |
| 10.00 | Supplying and filling with excavated earth including all cost and conveyance and all labour charges for watering, ramming etc., complete. | 35.5 | cum | 168 ₹5,964 | 170 ₹6,035 |
Tender Value
₹7.7 L
EMD Value
₹7,700
Closing Date
19 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (B.PT) KADAYAM
Block Development Officer (B.Pt), Kadayam.
Construction of Causeway at Bunglowkudiiruppu Burial Ground Road in Melambur Panchayat.
2026_RDTN_657519_1
BDKDM/347/2025-A2
Open Tender
Civil Works - Buildings
KADAYAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,700
24 Feb 2026
14 Feb 2026
19 Feb 2026
14 Feb 2026
19 Feb 2026
14 Feb 2026
Construction of Pipe Causeway at Bunglow kudiiruppu Burial Ground road in Melambur Panchayat ,Kadayam Panchayat Union Under Panchayat Union General Fund - 2025 - 2026
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Supply and delivery of 1000mm dia NP3 Class RCC Pipe including all cost and conveyance and all labour charges etc, Complete complying with standard specification.
Supply of fixing of Guard Stone (Top 0.7 m chisel dressed and 0.50m bottom roughly dressed) 0.23 x 0.23 x 1.20m long. (Two line dressed top 45cm) 23cm dia 1.0m long
Supplying and filling with excavated earth including all cost and conveyance and all labour charges for watering, ramming etc., complete.
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_788670.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_788670.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid