Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC NO 2 146 THOTTIKADU NAYAKAN VALAVU IRUGALUR PUDUPALAYAM SANKARI TK 637103 | SANKARI | SALEM | TAMIL NADU | 637103 | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr+₹52,796.98 (0.44%)Rejected-AOC NO 5D AGILA NAGAR 5TH CROSS EXTENSION GANAPATHY NAGAR SOUTH EXTENSION THIRUVANAIKOVIL TRICHY 5 | TRICHY | TRICHY | TAMIL NADU | ₹1.2 Cr+₹52,796.98 (0.44%) | L2 | Rejected-AOC L2 |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
19 Jul 2023, 3:00 pmClosed
commissioner madurai corporation
Aringar Anna Maligai
Relaying of BT Road Thallkulam Kanmai Mela Street 115031R4445, Thallakulam Kanmai North Street 115031R4448, Subbaiah Colony 1st Street 115033R4490, Subbiah Colony Post Office Street 115033R4491, Subbiah Colony Main Street 115033S0966, Bharathiyar
2023_MAWS_338277_1
E6/Package 6 NSMT/23-24
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.2 L
11 Sept 2023
7 Jul 2023
19 Jul 2023
7 Jul 2023
19 Jul 2023
7 Jul 2023
Amount
Providing and laying tack coat of 2kgs /10sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc.,complete as per 503 of MORTH Specifications.
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1m3 of 13.20mm IRC Metal with 44kg of Bittumenper 1m3 of Meta l For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler ,heating the aggregates and mixing them with bitumen in mini hot mix plant for pre mix carpet only rolling by 60-70KN power roller for pre mix carpet and seal coat seperately including labour charges for spreading the mix for pre mix carpet application of bitumen for seal coat over pre mix carpet, including labour charges for spreading seal coat seperately over pre mix carpet etc.including higher charges and fuel charges for, bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Providing and laying Bituminous concrete to 40mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 50.30 kgs of 60/70 bitumen and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labor charges for loading bitumen in to bitumen tank and metal to feeder unit, labor for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler, tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required, including all other incidental charges etc., complete using C M P clause 507 of MORTH Rev-5 specifications.
Dismantling the existing for cement concrete road surface the debris clearing away from the site etc.complete..,
Plain Cement Concrete 1:1.5:3 (one cement, one and half fine aggregates and three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification
Charges towards finishing the concrete surface with power traveler machine rate shall include the cost of fule charges hire for machine and labour charges for operation etc.,,
Add GST 18%
S RAMANATHAN
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .